IR 05000324/2023005
| ML23235A027 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/23/2023 |
| From: | Matthew Fannon Division Reactor Projects II |
| To: | Krakuszeski J Duke Energy Progress |
| References | |
| IR 2023005 | |
| Download: ML23235A027 (1) | |
Text
SUBJECT:
UPDATED INSPECTION PLAN FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 (REPORT 05000324/2023005 AND 05000325/2023005)
Dear John Krakuszewski:
The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for the Brunswick Steam Electric Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The NRC will perform one non-routine planned inspection under Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal. This inspection is scheduled from November 13-17, 2023.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4547 with any questions you have regarding this letter.
Sincerely, Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 05000324 and 05000325 and 07200006 License Nos. DPR-62 and DPR-71 Enclosure:
Brunswick Inspection/Activity Plan (09/01/2023 - 06/30/2025)
Distribution: via ListServ August 23, 2023 Signed by Fannon, Matthew on 08/23/23
ML23235A027 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RII/DRP RII/DRP NAME A. Wilson M. Fannon DATE 08/23/2023 08/23/2023
Site Inspection Activity Plan 07200006 - Brunswick (ISFSI)
09/01/2023 - 06/30/2025 OPERATION OF AN ISFSI
Enclosure Unit Start End Activity CAC Title Staff Count 7/8/2024 7/12/2024 IP 60855 001001 Operation Of An ISFSI
Site Inspection Activity Plan
Brunswick 09/01/2023 - 06/30/2025 PROBLEM IDENTIFICATION & RESOLUTION
1,2 9/11/2023 9/15/2023 IP 71152B 000747 Problem Identification and Resolution EMERGENCY PREPAREDNESS PROGRAM INSPECTION
1,2 9/25/2023 9/29/2023 IP 71114.02 000717 Alert and Notification System Testing 1,2 9/25/2023 9/29/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 9/25/2023 9/29/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 9/25/2023 9/29/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 9/25/2023 9/29/2023 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION
1,2 10/2/2023 10/6/2023 IP 71130.02 000734 Access Control 1,2 10/2/2023 10/6/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 10/2/2023 10/6/2023 IP 71130.07 000739 Security Training 1,2 10/2/2023 10/6/2023 IP 71130.09 001656 Security Plan Changes 1,2 10/2/2023 10/6/2023 IP 71151 001338 Performance Indicator Verification POST-APPROVAL LICENSE RENEWAL PHASE 4
TARGET SET INSPECTION
1,2 11/27/2023 12/1/2023 IP 71130.14 000743 Review of Power Reactor Target Sets FOCUSED ENGINEERING INSPECTION (FPTI)
1,2 11/27/2023 12/1/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 12/11/2023 12/15/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
BRUNSWICK INITIAL LICENSE EXAM
1,2 1/7/2024 1/12/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 2/11/2024 2/24/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
UNIT 1 IN-SERVICE INSPECTION
RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION
1,2 3/4/2024 3/8/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/4/2024 3/8/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 3/4/2024 3/8/2024 IP 71151 000746 Performance Indicator Verification MATERIAL CONTROL AND ACCOUNTING
Unit Start End Activity CAC Title Staff Count 1,2 11/13/2023 11/17/2023 IP 71003 000687 Post-Approval Site Inspection for License Renewal
3/4/2024 3/8/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1,2 4/22/2024 4/26/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)
Site Inspection Activity Plan
CYBER SECURITY INSPECTION
1,2 5/6/2024 5/10/2024 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - BRU
1,2 5/13/2024 5/17/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 6/3/2024 6/7/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP PUBLIC RAD SAFETY BASELINE INSPECTION
1,2 5/20/2024 5/24/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 5/20/2024 5/24/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2 5/20/2024 5/24/2024 IP 71151 000746 Performance Indicator Verification OPERATION OF AN ISFSI
EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1,2 7/29/2024 8/2/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/29/2024 8/2/2024 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 7/29/2024 8/2/2024 IP 71151 001397 Performance Indicator Verification BRUNSWICK REQUAL INSPECTION
FOCUSED ENGINEERING INSPECTIONS (CGD)
1,2 9/16/2024 9/20/2024 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 9/30/2024 10/4/2024 IP 71111.21N.03 001808 Commercial Grade Dedication SECURITY BASELINE INSPECTION
1,2 10/14/2024 10/18/2024 IP 71130.02 000734 Access Control 1,2 10/14/2024 10/18/2024 IP 71130.09 001656 Security Plan Changes 1,2 10/14/2024 10/18/2024 IP 71151 001338 Performance Indicator Verification BRUNSWICK INITIAL LICENSE EXAM
1,2 1/5/2025 1/10/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 2/9/2025 2/22/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
UNIT 2 IN-SERVICE INSPECTION
RP OCCUPATIONAL RADIATION SAFETY BASELINE INSPECTION
1,2 3/10/2025 3/14/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/10/2025 3/14/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 3/10/2025 3/14/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 3/10/2025 3/14/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 3/10/2025 3/14/2025 IP 71151 000746 Performance Indicator Verification 1,2 3/24/2025 3/28/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 7/8/2024 7/12/2024 IP 60855 001001 Operation Of An ISFSI 1,2 9/9/2024 9/13/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
3/3/2025 3/7/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Site Inspection Activity Plan
1,2 3/24/2025 3/28/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 3/24/2025 3/28/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 3/24/2025 3/28/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 3/24/2025 3/28/2025 IP 71151 000746 Performance Indicator Verification