0913012016 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 52204 Rep Org: CRANE NUCLEAR, INC. Notification Date I Time: 08/26/2016 18:00 (EDT)

Supplier: CRANE NUCLEAR, INC. Event Date I Time: 08/03/2016 (CDT)

Last Modification: 09/30/2016 Region: 3 Docket#:

City: BOLINGBROOK Agreement State: Yes County: License#:

State: IL NRC Notified by: BURT ANDERSON Notifications: ANTHONY DIMITRIADIS R1DO HQ Ops Officer: DONG HWA PARK ERIC MICHEL R2DO Emergency Class: NON EMERGENCY JAMNES CAMERON R3DO 10 CFR Section: RAY KELLAR R4DO 21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21/50.55 REACTORS EMAIL PART 21 - SAFETY RELATED COMPONENT WELDING BY AN UNQUALIFIED WELDER The following was excerpted from a letter by Crane Nuclear, Inc.:

"Shielded metal arc welding (SMAW) with F-5 filler metal was welded on safety related components by an unqualified welder.

"Crane Nuclear Quality Assurance Manual, 12th Edition Rev. 2, dated 8/8/16 requires that welder performance qualification shall conform to the requirements of ASME Section IX for processing ASME B&PV Section Ill and safety related valve and valve part orders. During processing of a safety related order, it was identified that one welder was missing the required qualification documentation to perform weld repairs with F-5 filler metals (as defined in ASME Section IX) using the shielded metal arc welding process (SMAW). The safety hazard which could be created by such a defect could be a potential weld failure.

"Crane Nuclear has completed a review of all applicable welding records based on the welder hire date of September, 2011. We identified a total of 10 orders that were supplied with welding performed by an unqualified welder. Notification has been made to the purchasers of the affected safety related orders on the same date as this notification.

"Should you have any questions regarding this matter, please contact Burt Anderson, Site Leader, at (630) 226-49SO, Rosalie Nava, Director of Safety and Quality at (630) 226-4940, or Jason Klein, Engineering Manager at (630) 226-4953."

The following facilities received these safety related orders: Duke-McGuire, Exelon-Byron, Duke-Brunswick, Entergy-ANO, Exelon-TMI, Exelon-Quad Cities, Exelon-Dresden. C / lJ

J.r;,

N~~

0913012016 U.S. Nuclear Regulatory Commission Operations Center Event Report Page2

      • UPDATE AT 2004 EDT ON 9/30/2016 FROM ROSALIE NAVA TO MARK ABRAMOVITZ***

The following information was received via fax:

"This letter is intended to inform the U.S. Nuclear Regulatory Commission of actions taken to complete the Part 21 evaluation on the above referenced item. All of the following actions have been completed:

1) The welder has been qualified on the SMAW process utilizing F-5 filler metal and documented in accordance with ASME Section IX requirements.
2) The affected purchasers were provided with an initial 10CFR21 notification on August 26, 2016.
3) The affected purchasers were provided with the documentation detailing the scope of the welding performed on the affected components.
4) The affected purchasers were provided an investigation summary closure letter.
5) Crane Nuclear, Inc. Corrective Action Report 16-35 generated to determine root cause and implement appropriate corrective actions to prevent recurrence was completed and closed on September 30, 2016.

"Should you have any questions regarding this matter, please contact, Rosalie Nava, Director Safety and Quality .

at (630) 226-4940, or Burt Anderson, Site Leader. at (630) 226-4990."

Notified R1 DO (Cook), R2DO (Desai), R3DO (Stone), R4DO (Groom), and the Part 21 Group (via e-mail) .

.' .. *.. ~

SEP. 30. 2016 8:04PM NO. 434 P. 1 Telephone (630) 226-4900 Fax (630)226-4646 www.eraneouclear.eom NUCLEAR CRANE NUCLEAR, INC. 860 REMINGTON BOULEVARD BOLINGBROOK, IL 60440 Date: September 30, 2016 Attn: Document Control Desk u_s. Nuclear Regulatory Commission Washington, D.C. 20555u001

Subject:

10 CFR Part 21 Evaluation Completed

Reference:

ML16243A475 Crane Nuclear, Inc. Letter dated Aug. 28, 2016-lnitial 10 CFR Part21 Notification Safety Related Component welding by an Unqualified Welder

Dear Sir or Madam:

. This letter is intended to infonn the U.S. Nuclear Regulatory Commission of actions taken to complete the Part 21 evaluation on the above referenced item.

All of the following actions have been completed.

... The welder has been Qualified on the SMAW process utilizing F-5 filler metal and documented in accordance with ASME Section IX requirements.

  • The affected purchasers were provided with an initial 10CFR21 notification on August Z6, 2016.
  • The affected purchasers were provided with the documentation detailing the scope of the welding performed on the affected components.
  • The affected purchasera were provided an investigation summary closure letter.
  • Crane Nuclear, Inc. Corrective Action Report 16-3"5 generated to determine root cause and implement appropriate corrective actions to prevent recurrence was completed and closed on September 30, 2016.,
  • I Should you have any questions regarding this matter, please contact, Rosalie Nava, Director Safety and Quality at (630) 226-4940, or Burt Anderson, Site Leader. at (630) 226-4990.

Sincerely, Crane Nuclear, Inc.

Rosane Nava*

Director Safety and Quali1y