ML17142A323

From kanterella
Jump to navigation Jump to search
Interim Report Concerning Supply of Stainless Steel Tubing
ML17142A323
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/11/2017
From: Lion R
Tioga Pipe
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
52745
Download: ML17142A323 (7)


Text

0511112017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 52745 Rep Org: TIOGA PIPE, INC. Notification Date I Time: 05/11/2017 09:40 (EDT)

Supplier: SUMMERILL TUBE CORP. Event Date I Time: 04/28/2017 (CDT)

Last Modification: 05/11/2017 Region: 4 Docket#:

City: HOUSTON Agreement State: Yes County: License#: '

State: TX NRC Notified by: RUSSELL LION Notifications: MIKE ERNSTES R2DO HQ Ops Officer: DONG HWA PARK PART 21/50.55 REACTORS EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:

21.21 (a)(2) INTERIM EVAL OF DEVIATION INTERIM REPORT CONCERNING SUPPLY OF STAINLESS STEEL TUBING The following is a summary of a report received via fax:

"This [interim report is being provided] in accordance with 10 CFR Part 21.21 concerning the supply of 0.5 inch Stainless Steel Tubing to the Duke/Progress Energy Brunswick Nuclear Generating Station. Mackson Nuclear subcontracted Tioga Pipe to supply the tubing. Tioga Pipe in-turn subcontracted Summerill Tube; in which Summerill Tube procured the tubing commercially utilizing the provisions of ASME Section Ill, NCA 3855.5.

However, Summerill failed to properly implement the requirements of NCA-3855.5(a)(2) in that a product analysis of each piece of unqualified source material was not performed.

"Tioga Pipe does not have the capabilities to conduct an evaluation of the defect to determine if a substantial safety hazard exists in the tubing supplied to Duke/Progress Energy. As such, Tioga cannot provide a timeframe as to an expected completion date, and is relying on the licensee, Duke/Progress Entergy, to make the final determination.

"If you have any questions, please feel free to contact William Kotcher at (713) 512-3569 or our Quality Director, Russell Lion, at (484) 546-5612."

~.

From: Russell Lion Fax: (BBB) 224-9926 To: "'301B165151@rcfax.cc Fax: (301) B16-5151 Page 1 of B 05/11/2017 6:36 AM JFAX loate: 105/11/2017 I Pages including cover sheet: 18 To: "'3018165151@rcfax.com' From: Russell Lion AL Phone Phone (888) 224-9926

  • 612 Fax Number (301) 816-5151 Fax Number. (888) 224.:.9926

From: Russell Lion Fax: (888) 224-9926 To: "'3018165151@rcfax.cc Fax: (301) 816-5151 Page 4 of 8 05/1112017 6:36 AM When it has to be right~

TP-LTR-NRC-2017-01 May 10, 2017 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Phone: (301) 816-5100 Fax: (301) 816-5151 E-Mail: EIE@nrc.gov

Subject:

Interim Report Notification Pursuant To 10 CFR Part 21.21, Regarding Supply Of 0.5" OD X .065" MW SA213 TP 316/316L Tubing.

This letter provides an interim report in accordance with §21.21 concerning the supply of V2" Stainless Steel Tubing to the Duke/ Progress Energy Brunswick Nuclear Generating Station. Mackson Nuclear subcontracted Tioga Pipe to supply the tubing. Tioga Pipe in-turn subcontracted Summerill Tube; in which Summerill Tube procured the tubing commercially utilizing the provisions of ASME Section III, NCA 3855.5. However, Summerill failed to properly 'implement the requirements of NCA-3855.S(a)(2) in that a product analysis of each piece of unqualified source material was not performed. Please see Attachment 1, "Interim Report Notificatio.n Information per §21.21", for additional details and clarification.

Tioga Pipe does not have the capabilities to conduct an evaluation of the defect to determine if a substantial safety hazard exists in the tubing supplied to Duke I Progress Energy. As such, Tioga cannot provide a timeframe as to an expected completion date, and is relying on the licensee, Duke/ Progress Entergy, to make the final determination.

If you have any questions, please feel free to contact me at (713) 512-3569 or our Quality Director, Russell Lion, at (484) 546-5612.

111iam Kotcher Chief Operating Officer Tioga Pipe Co .

Tioga Pipe, Inc.

Forks Distribution Center 100 Mort Drive, Easton, PA 18040 610-252-7473

. tiogaplpe:com 1of5

From: Russell Lion Fax: (888) 224-9926 To: "3018165151@rcfax.cc Fax: (301) 816-5151 Page 5 of 8 05/1112017 6:36 AM

  • 11*' :_,~*:o*
* **g*_:._

...*. **a*-.*

I When it has to be right.

TP-LTR-NRC-2017-01

Enclosures:

"Attachment 1, Interim Report Notification Information per §21.21" Cc; Andrew Keiser, Tioga David Keiser, Tioga Donald Carver, Tioga Russell Lion, Tioga Richard Crowley, Tioga Glenn Reigel, Tioga Bryan Nichols, Tioga Hill Muse, Mackson Tom Sharp, Mackson Shannon Echols, Mackson Tioga Pipe, Inc.

Forks Distribution Center 1()0 Mort Drive, Easton, PA 18040 610-252-7473 tlogaplpe.com 2 of 5

From: Russell Lion Fax: (888)*224-9926 To: "'3018165151@rcfax.cc Fax: (301) 816-5151 Page 6 of 8 05/1112017 6:36 AM

    • n*-1-*0**9_---*a--****.

.: *::> -.:.. . *_ - . **~*

r When it has to be right.

TP-LTR-NRC-2017-01 Attachment 1.

Interim Report :Notification Infcrma*tion per §21.2. 1.

I. Name and address of the individual or individuals informing the Commission:

Bill Kotcher Chief Operating Officer Tioga Pipe Co.

616 West FM 1960 Houston, TX 77090 II. Identification ofthe facility, the activity, or the basic component supplied.

for such facility which fails to comply or contains a defect. *

.500" OD X .065 MW SA-213 TP 316 / 316L tubing procured as ASME Section III, Subsection NC Class 2.

  • Delivered to the Brunswick Nuclear Generating Station 1 & 2 Tioga Sales Order: SO 878586; Heat #540535 Lot# 32826; 48 pcs; 960 feet total Ill. Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.

Summerill Tube Corp.

IV. Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.

Summerill Tube Corp purchased unqualified source material from Shanghai Maxmount Special Steel Co. Ltd and failed to properly certify in accordance with ASME Section III NCA-3855.S(a)(2) in that Summerill subcontracted only 1 product analysis per Heat/ Lot for the unqualified source material instead of the required 1 product analysis per piece of source material (4 analyses should have been performed). The material was drawn into 48 pieces to supply Tioga Sales Order 878586 and directly shipped to Brunswick 1 & 2 on January 11, 2017.

Tioga Pipe, Inc.

Forks Distribution Center 100 Mort Drive, Easton, PA 18040 610-252-7473 tiogapipe.com 3 of 5

From: Russell Lion Fax: (888) 224-9926 To: "'3018165151@rcfax.cc Fax: (301) 816-5151 Page 7 .of 8 05/1112017 6:36 AM r When it has to be right.

TP-LTR-NRC-2017-01

.,Atb!chment*1 .Ccont.)

Interim Report:N.otiffoation lnf2r*mation *ger §21 . .21.

V. The date on which the information of such defect or failure to comply was obtained.

Summerill Tube Corp notified Tioga Pipe on April 28, 2017 Tioga Pipe notified Mackson Nuclear on May 5, 2017 Mackson Nuclear notified Duke/ Progress Energy on May 8, 2017 VI. In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, o:r may be supplied for, manufactured, or being manufactured for o:ne or more facilities or activities subject to the regulations in this part.

( 48) 20 ft long pieces =960 total linear feet supplied to Brunswick 1 & 2. On May 1Qth Brunswick advised Mackson & Tioga that approximately 30 feet had been installed.

VII. The corrective action, which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the nength of time that has been or will be taken to complete the action.

Tioga Pipe Corrective Action, N-CAR-2017-20 has been generated.

Completed Actions:

1. Extent of condition: Tioga Quality performed an extent of condition, from January 2014 to Present of all Tioga Pipe Sales Orders with Summerill Tube. No additional Sales Orders were affected by this noncompliance. (Exception Action #2)
2. Summerill Tube identified in an email to Tioga Pipe on May 4th that that 2 additional Tioga Sales Orders were affected by the improper certification. Sales Orders 904897-1 (0.375" OD X 0.035" MW SA213 316TP /316L Tubing) and 904897-2 (0.375" OD X 0.049" MW SA213 ~

316TP /316L Tubing); Tioga located this material in its inventory

.which was immediately quarantined and tagged with NC tags. NCRs, N-NCR-2017D07 and N-NCR-2017-08 were raised with a disposition of "reject"/ "scrap".

3. Notified Mackson Nuclear of Part 21 reportable condition for~"

316TP/316L tubing supplied to Duke/ Progress Energy.

Tioga Pipe, Inc.

Forks Distribution Center 100 Mort Drive, Easton, PA 18040 610-252-7473 tlogapipe.com 4 of 5

From: Russell Lion Fax: (888) 224-9926 To: "'3018165151@rcfax.cc Fax: (301) 816-5151 Page 8 of 8 05/1112017 6:36 AM When it has to be right.

TP-LTR-NRC-2017-01 Attachment 1 (cont.)

Interim Report NotifiCatfon Informati'on* ger §21.2'1

4. Temporary suspension Summerill Tube on Tioga Approved Suppliers List Open Actions:
5. Prepare and Issue Interim Notification Report to NRC - due May 11, 2017
6. Evaluate Summerill Tube's qualification status and determine if supplemental audit required for dedication of commercial material, and control of purchased items and services - due May 28, 2017
7. If required, schedule and perform supplemental\audit of Summerill Tube - due TBD VIII. Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

Any stock material should be quarantined and tagged as nonconforming material.

IX. In the case of an early site permit, the entities to whom an early site permit was transferred.

Not applicable.

Tioga Pipe, Inc.

Forks Distribution Center 100 Mort Drive, Easton, PA 18040 610-252-7473 tiogaplpe.com 5 of 5