IR 05000324/2023011

From kanterella
Jump to navigation Jump to search
NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011
ML23355A057
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/26/2023
From: Daniel Bacon
NRC/RGN-II/DRS/EB2
To: Krakuszeski J
Duke Energy Progress
References
IR 2023011
Download: ML23355A057 (10)


Text

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT - NRC FIRE PROTECTION TEAM INSPECTION (FPTI) REPORT 05000324/2023011 AND 05000325/2023011

Dear John A. Krakuszeski:

On December 14, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant and discussed the results of this inspection with Mr. Jay Ratliff, Plant General Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000324 and 05000325

License Numbers:

DPR-62 and DPR-71

Report Numbers:

05000324/2023011 and 05000325/2023011

Enterprise Identifier:

I-2023-011-0014

Licensee:

Duke Energy Progress, LLC

Facility:

Brunswick Steam Electric Plant

Location:

Southport, NC

Inspection Dates:

November 27, 2023, to December 14, 2023

Inspectors:

W. Monk, Senior Reactor Inspector (Team Lead)

J. Montgomery, Senior Reactor Inspector

D. Strickland, Reactor Inspector

M. Carothers, Reactor Inspector (Observing)

Approved By:

Daniel M. Bacon, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and industry standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

a. Review deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures.

b. Verify that operator actions can be accomplished as assumed in the licensees FHA, or as assumed in the licensees fire probabilistic risk assessment (FPRA) analysis and SSA.

c. Review repetitive or similar maintenance work requests which could be an indicator of a design deficiency and could affect the ability of the components to perform their functions, when needed.

d. Ensure that post maintenance and/or surveillance activities are performed as scheduled.

e. Perform a walkdown inspection to identify equipment alignment discrepancies. Inspect for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.

f. Ensure the selected SSCs that are subject to aging management review (AMR) pursuant to 10 CFR Part 54 are being managed for aging (e.g., loss of material, cracking, reduction of heat transfer) in accordance with appropriate aging management programs. Verify that the licensees aging management program activities (such as, Fuel Oil Analysis or Selective Leaching Aging Management Program) associated with FP equipment are being implemented.

g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dispositioned the operating experience in accordance with their processes.

(1) SSC #1 (Fire Prevention) - Transient Combustible Controls and Hot Work Programs
(2) SSC #2 (Detection/Suppression) - U1 & U2 High Pressure Coolant Injection (HPCI)

High Pressure CO2 Fire Suppression System

(3) SSC #3 (Safe Shutdown) - U1 & U2 Emergency Diesel Generator (EDG) System and Emergency Electrical Buses
(4) SSC #4 (Safe Shutdown) - U1 & U2 Low Pressure Coolant Injection and Residual Heat Removal (LPCI / RHR) Systems

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Fire Protection Administration Program #1 - NFPA 805 Monitoring Program
(2) Fire Protection Administration Program #2 - Fire Brigade Drills and Training Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) Fire Protection Program Change #1: EC 421458 - U1 HPCI Room CO2 Panel Replacement Modification
(2) Fire Protection Program Change #2: EC 420076 - Temporary Fire Protection Water Supply

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained nor documented in this report.

  • On December 14, 2023, the inspectors presented the NFPA 805 Fire Protection Team Inspection (FPTI) Exit Meeting results to Mr. Jay Ratliff, Plant General Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0FP-1222

BNP NFPA 805 Monitoring Target Value Calculation

Rev. 5

0VLVS-0006

Evaluation of MOV Pressure Boundaries for IN 92-18 Hot-

Short Events

Rev. 6

1FP-1111

NFPA 805 Transition - Fire Area RB1-1 Fire Safety

Analysis for Unit 1

Rev. 2

1FP-1112

NFPA 805 Transition - Fire Area RB1-6 Fire Safety

Analysis for Unit 1

Rev. 0

BNP-E-9.007

ASSD Recovery Action Feasibility

Rev. 2

Calculations

BNP-E-9.010

NFPA 805 Nuclear Safety Capability Assessment (NSCA)

Rev. 4

AR 02490689

AD-EG-ALL-1501 Fire Protection Program / Plant Impact

Review Form - Alternate Compensatory Actions

associated with the Non-Functional Diesel Building

Basement Halon System

Rev. 0

NCR 2318122

20 NRC Fire Protection Inspection QFPI 2-VA-DG-

FDMP-101

2/26/2020

Corrective Action

Documents

NCR 2492653

Diesel Generator Basement Halon Non-Functional Longer

than 0PLP-01.2 Allowance

10/31/2023

NCR 2496053

NRC TFPI - Walkdown Findings

11/29/2023

NCR 2498085

Enhancement Identified for ASSD Procedure

Implementation

2/14/2023

NCR 2498142

23 NRC FPTI - NSCA (BNP-E-9.010) Discrepancy

2/14/2023

NTM 2496744

BNP-E-9.010 Update for RB1-N

2/05/2023

PRR 2495999

1PT-34.10.1.0 (Remove PM Frequency from Procedure)

11/29/2023

PRR 2496001

2PT-34.10.1.0 (Remove PM Frequency from Procedure)

11/29/2023

PRR 2496740

Update ASSD-05 Phone Jack Location

2/05/2023

PRR 2497373

0PT-48.4 Procedure Updates

2/11/2023

PRR 2498077

0ASSD-00 Procedure Update

2/14/2023

Corrective Action

Documents

Resulting from

Inspection

WR 20259931

2-FP-LIS-1431 GAUGE NUMBERS WORN OFF

11/30/2023

LL-92037 Sheet

Unit No. 1 - Motor Control Center "1XB" & "1XB-2" Switch

Development

Rev. 8

71111.21N.05

Drawings

LL-92037 Sheet

Unit No. 1 - MCC 1XB and 1XB-2 Switch Development

Rev. 7

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

17A

LL-92037 Sheet

17B

Unit No. 1 - MCC 1XB and 1XB-2 Switch Development

Rev. 7

LL-92037 Sheet

Unit No. 1 - MCC "1XB-2" Compt. "1-DL7" RHR Inboard

Inj. Vlv. 1-E11-F015B Control Wiring Diagram

Rev. 7

LL-92037 Sheet

Unit No. 1 - MCC "1XB-2" Compt. "1-DL7" RHR Inboard

Inj. Vlv. 1-E11-F015B Cable Diagram

Rev. 14

LL-92037 Sheet

Unit No. 1 - MCC "1XB-2" Compt. "1-DL7" RHR Inboard

Inj. Vlv. 1-E11-F017B Control Wiring Diagram

LL-92037 Sheet

Unit No. 1 - MCC "1XB-2" Compt. "1-DL7" RHR Inboard

Inj. Vlv. 1-E11-F017B Cable Diagram

EC 420076

Temporary Fire Protection Water Supply

Rev. 5

EC 421458

U1 HPCI Room CO2 Panel Replacement

Rev. 0

Engineering

Changes

EC 423328

Documentation of RIS 2005-007 Evaluation for Diesel

Generator Building Basement Halon System Non-

Functional

Rev. 0

AD-OP-BNP-

205

Time Re-validation for Action to Begin to Depressurize the

Reactor Pressure Vessel for Fire in The North U2 Reactor

Building

07/20/2022

AD-OP-BNP-

205

Start Suppression Pool Cooling Time Critical Action/ Time

Sensitive Action Validation

07/20/2022

AD-OP-BNP-

205

Emergency 4KV Busses Re-energized Time Critical

Action/Time Sensitive Action Validation

07/17/2022

BNP-LR-300

Electrical Integrated Plant Assessment (IPA)

Rev. 3

BNP-LR-315

License Renewal Aging Management Review - Residual

Heat Removal System (2045)

Rev. 2

Engineering

Evaluations

BNP-LR-336

License Renewal Aging Management Review - Diesel

Generator System (5095)

Rev. 0

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket

Nos. 50-325, 50-324 License Amendment Request to

Adopt NFPA 805 Performance-Based Standard for Fire

Protection for Light Water Reactor Electric Generating

Plants (2001 Edition)

09/25/2012

Miscellaneous

DBD-61

Gaseous Suppression System - Brunswick Units 1 & 2

Rev. 3

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0AP-033

FIRE PROTECTION PROGRAM MANUAL

Rev. 27

0ASSD-00

Alternative Safe Shutdown User's Guide Procedure

Rev. 51

0ASSD-01

Alternate Safe Shutdown Procedure Index

Rev. 42

0ASSD-02

Control Building Alternative Safe Shutdown Procedure

Rev. 65

0ASSD-03

E6 SWITCHGEAR ROOM

Rev. 2

0FPP-008

Fire Protection Semiannual Inspection

Rev. 72

0PLP-01.2

FIRE PROTECTION SYSTEM FUNCTIONALITY,

ACTION, AND SURVEILLANCE REQUIREMENTS

Rev. 60

1ASSD-05

Reactor Building North Fire Safe Shutdown Procedure

Rev. 35

1ASSD-06

Reactor Building South Alternative Safe Shutdown

Procedure

Rev. 26

AD-EG-ALL-1503

Fire Protection Performance Monitoring and Other

Program Elements

Rev. 5

AD-EG-ALL-1650

License Renewal Aging Management

Rev. 5

AD-FP-ALL-1520

TRANSIENT COMBUSTIBLE CONTROL

Rev. 0

AD-FP-ALL-1523

TEMPORARY IGNITION SOURCE CONTROL

Rev. 0

AD-HU-ALL-0004

Procedure and Work Instruction Use and Adherence

Rev. 15

AD-OP-ALL-0207

Fire Brigade Administrative Controls

Rev. 5

AD-OP-ALL-1000

Conduct of Operations

Rev. 22

AD-OP-BNP-

205

BNP Time Critical Actions/Time Sensitive Actions

Supplement

Rev. 2

AD-PI-ALL-0100

CORRECTIVE ACTION PROGRAM

Rev. 30

CSD-BNP-FPF-

1RB

Reactor Building Pre-fire Plans

Rev. 2

Procedures

PD-FP-ALL-1500

FLEET FIRE PROTECTION PROGRAM MANUAL

Rev. 1

20589223

LPCI/RHR System Operability Test - LOOP A

06/04/2023

20593855/01

LPCI/RHR System Operability Test - LOOP B

06/29/2023

20598236-01

ASSD Sound-Powered Phone System Functional Test

07/29/2023

20614455/

205311618

Core Spray System Operability Test - LOOP B

10/24/2023

20615611

ASSD Sound-Powered Phone System Functional Test

10/28/2023

20621548

LPCI/RHR System Component Test-LOOP A

09/27/2023

Work Orders

20627177/01

LPCI/RHR System Component Test-LOOP A

10/26/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

WO 20439890

OPT-34.5.6.0 - Diesel Generator Building Halon System

Functional Test

09/02/20221

WO 20507305-01

1PT-34.10.1.0 Plant High Pressure CO2 Fire

Extinguishing System Inspection

04/19/2022

WO 20522500-01

OPT-34.5.6.0 - Diesel Generator Building Halon System

Functional Test

09/20/2022

WO 20540669

2PT-34.10.1.0 Plant High Pressure CO2 Fire

Extinguishing System Inspection

11/30/2022

WO 20544933

1PT-34.10.1.0 Plant High Pressure CO2 Fire

Extinguishing System Inspection

11/04/2022

WO 20555030

OFPP-008 Fire Protection Equipment Semiannual

Inspection

01/25/2023

WO 20557241

2PT-34.10.1.0 Plant High Pressure CO2 Fire

Extinguishing System Inspection

03/30/2023

WO 20560814-01

OPT-34.4.2.1 - Diesel Generator Building Halon Fire

Extinguishing Systems

05/08/2023

WO 20564469

1PT-34.10.1.0 Plant High Pressure CO2 Fire

Extinguishing System Inspection

05/15/2023

WO 20572897

2PT-34.10.1.0 Plant High Pressure CO2 Fire

Extinguishing System Inspection

06/16/2023

WO 20586607

OFPP-008 Fire Protection Equipment Semiannual

Inspection

07/27/2023

WO 20594174

OPT-34.4.2.1 - Diesel Generator Building Halon Fire

Extinguishing Systems

09/26/2023

WO 20597666

1PT-34.10.1.0 Plant High Pressure CO2 Fire

Extinguishing System Inspection

10/16/2023