Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24318C4622024-11-13013 November 2024 Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - License Amendment Nos. 315 and 315 Updated Information Regarding TSC Ventilation Design IR 05000280/20240032024-11-12012 November 2024 Integrated Inspection Report 05000280-2024003 and 05000281-2024003 ML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20240112024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 2024-09-03
[Table view] Category:Meeting Summary
MONTHYEARML24290A1652024-11-0505 November 2024 Summary of Public Meeting Regarding Potential License Amendment Request Change Accident Analysis to Address a Stagnant Loop Following a Main Steam Line Break Accident ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance ML24222A4232024-08-19019 August 2024 Summary of June 17, 2024, Meeting with Virginia Electric and Power Company About Guidance in Section 7.5 of Standard Review Plan for Light Water Reactors ML23345A1092023-12-14014 December 2023 December 7, 2023, Summary of Public Meeting with Virginia Electric and Power Company Concerning a License Amendment Request to Revise Emergency Augmentation Times for North Anna Station, Units 1 & 2, and Surry Station, Units 1 & 2 ML23167A7012023-06-26026 June 2023 Summary of Public Meeting with VEPCO Concerning a License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML23151A5472023-06-0101 June 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station ML22335A5172022-12-0505 December 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections (RFO 31) ML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22115A0032022-05-17017 May 2022 Summary of Public Meeting with Virginia Electric and Power Company on April 13, 2022 Regarding Future LAR Request to Change the Auxiliary Feedwater System Allowed Outage Time ML22130A0332022-05-0909 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting Number 20220349 ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML22070A8092022-03-15015 March 2022 Public Webinar Summary with Virginia Electric and Power Company Regarding Further License Amendment Relocating the Technical Services Center to the Local Emergency Operations Facility ML21342A1402021-12-0909 December 2021 Summary of Public Meeting in Tarrytown, Ny, to Discuss Indian Point Units 1, 2, and 3 (IPEC) Post-shutdown Decommissioning Activities Report ML21159A0932021-06-16016 June 2021 May 20, 2021, Summary Regarding Pre-Application Meeting to Discuss Planned License Amendment Requests ML21155A1632021-06-11011 June 2021 Summary Regarding Pre-Application Meeting to Discuss Planned License Amendment Requests ML21131A1612021-05-11011 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Virgil C. Summer Nuclear Station, Docket No. 50-395; North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML20335A1122020-12-0707 December 2020 Summary of November 30, 2020, Meeting with the National Marine Fisheries Service and Dominion Energy, Inc. Regarding Atlantic Sturgeon Capture at Surry Power Station ML20296A4072020-11-12012 November 2020 Summary of October 14, 2020, Public Meeting with Virginia Electric and Power Company to Discuss Presubmittal Supplements for Surry Units 1 and 2 ML20136A1752020-05-15015 May 2020 Sur 2019 Aam Meeting Summary ML20016A3472020-01-30030 January 2020 Summary of December 12, 2019, Category 2 Public Meeting on Lessons Learned from the Review of the First Subsequent License Renewal Applications ML19347D0862019-12-13013 December 2019 Summary of December 13, 2019, Teleconference with Matthew Balazik, Ph.D., Regarding James River Shortnose and Atlantic Sturgeon Research ML19266A4842019-10-0101 October 2019 Summary of Pre-Licensing Meeting with Dominion Energy Regarding a License Amendment Request to Adopt a Risk-Informed 10 CFR 50.69 Categorization Program ML19253D7082019-09-24024 September 2019 Summary of August 13, 2019, Category 2 Public Meeting Related to the Safety Review of the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application ML19219A2842019-08-13013 August 2019 July 29, 2019, Summary of Category 2 Public Meeting Related to the Safety Review of the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application ML19135A1982019-06-0404 June 2019 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Surry Power Station, Unit Nos 1 and 2, Subsequent License Renewal Application ML19144A1292019-05-30030 May 2019 Summary of November 20, 2018, Pre Application Meeting with Dominion Energy Regarding the Planned License Amendment Request to Revise Emergency Action Levels ML19128A3372019-05-0808 May 2019 Public Meeting Summary - 2018 Annual Assessment Public Meeting Regarding Surry Power Station Docket Nos. 50-280 and 50-281 ML19106A4162019-04-25025 April 2019 Summary of the Subsequent License Renewal Severe Accident Mitigation Alternatives Audit ML19024A3862019-01-30030 January 2019 01/08/2018 Summary of Meeting Regarding Public Scoping Meeting for Environmental Review of Surry Power Station, Units 1 and 2 Subsequent License Renewal Application ML18144A0712018-05-23023 May 2018 Summary of Annual Assessment Public Meeting Regarding Surry Power Station ML18129A3142018-05-16016 May 2018 04/17/2018 Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry, Units 1 and 2, Subsequent License Renewal Application ML18066A0192018-03-16016 March 2018 Meeting Summary of October 4, 2017 Pre-Submittal Public Meeting to Discuss LAR Request Regarding Consolidation of the Emergency Operations Facilities ML18057A2752018-03-0101 March 2018 February 7, 2018, Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry Power Station, Units 1 and 2 Subsequent Renewal Application ML17123A1162017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the Surry Power Station, Units 1 and 2 with the Public for Period of January 01, 2016 Through December 31, 2016 ML16320A4602016-12-0707 December 2016 Summary of Meeting with Virginia Electric and Power Company Regarding Pre-Submittal Information on Proposed Alternative to ASME Code to Repair Safety-Related Piping Using Carbon Fiber Reinforced Polymer at Surry Power Station, 1 & 2 ML16124A7592016-05-0303 May 2016 April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2 ML14210A0212014-08-0808 August 2014 June 25, 2014, Summary of Category 1 Public Meeting with Dominion Nuclear to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14101A1132014-04-11011 April 2014 Summary of Meeting with Public to Discuss Annual Assessment of Surry Power Station with the Public for the Period of January 1, 2013 - December 31, 2013 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13151A1022013-05-31031 May 2013 Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012 ML12129A2512012-05-0808 May 2012 Summary of Category 3 Public Meeting Annual Assessment for Surry Power Station ML12115A0702012-04-24024 April 2012 Summary of Public Meeting with Surry Power Station, Unit 2 to Discuss a Preliminary White Finding Involving One Apparent Violation of Technical Specification 6.4.A.7 ML1206600702012-03-0606 March 2012 02/21-22/2012 Meeting Summary with State-Of-The-Art Reactor Consequence Analyses (Soarca) for Public Meetings at Peach Bottom and Surry ML1206600902012-03-0606 March 2012 02/21-22/2012 Meeting Summary with State-Of-The-Art Reactor Consequence Analyses (Soarca) for Public Meetings at Peach Bottom and Surry ML11173A1542011-07-0505 July 2011 Summary of Conference Call Regarding the Spring 2011 Steam Generator Tube Inspections ML1110303992011-04-13013 April 2011 Public Meeting/Open House Summary Letter - Surry Power Station ML1023804682010-08-26026 August 2010 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop ML0923803922009-08-26026 August 2009 08/11-12/2009-Summary of Meeting Re 2009 Us NRC Initial Exam Development Workshop ML0911000832009-04-17017 April 2009 Summary of Meeting with Public/Open House to Discuss NRC Reactor Oversight Process and the Annual Assessment of the Surry Power 2024-08-21
[Table view] |
Text
June 10, 2008 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION, UNIT NO. 2, SPRING 2008 REFUELING OUTAGE STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MD8615)
Dear Mr. Christian:
On May 5, 2008, the U.S. Nuclear Regulatory Commission staff participated in a conference call with Surry Power Station, Unit No. 2 representatives regarding their spring 2008 refueling steam generator tube inspections. Enclosed is a summary of that conference call.
If you have any questions regarding this summary, please contact me at 301-415-1564.
Sincerely,
/RA/
Siva P. Lingam, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-281
Enclosure:
Summary of Conference Call cc w/encl: See next page
ML081490152 *transmitted by memo dated OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/DCI/CSGB/BC NRR/LPL2-1/BC NAME SLingam MO=Brien AHiser MWong DATE 06/09/08 06/09/08 5/12/08* 06/10/08
SUMMARY
OF CONFERENCE CALL STEAM GENERATOR TUBE INSPECTIONS SURRY POWER STATION, UNIT NO. 2 DOCKET NO. 50-281 On May 5, 2008, the U. S. Nuclear Regulatory Commission (NRC) staff participated in a conference call with Surry Power Station, Unit No. 2 (Surry 2) representatives (the licensee) regarding their spring 2008 refueling outage steam generator (SG) tube inspections. A summary of the information discussed follows.
Surry 2 has three Westinghouse model 51F SGs. Each SG has 3,342 thermally treated Alloy 600 tubes with an outside diameter of 0.875 inches and a nominal wall thickness of 0.050 inches. The tubes are hydraulically expanded for the full depth of the tubesheet at each end. The tubes are supported by stainless steel support plates with quatrefoil-shaped holes. The U-bend region of the tubes installed in Rows 1 through 8 was thermally treated after bending in order to reduce stress.
At the time of the May 5, 2008, conference call, tube inspections were still in progress. A summary of the information provided during this call is below:
- There was no primary-to-secondary leakage in the cycle preceding the 2008 inspections.
- No secondary side pressure tests were performed.
- In SGs B and C, the following was the planned scope of inspection:
o 100% of the tubes were inspected full length with the bobbin coil except for the U-bend region of the row 1 tubes. Any tubes identified with a U-bend offset (similar to what was observed at Seabrook) were inspected with a +PointTM coil in the tubesheet region since these tubes may have an elevated susceptibility to cracking.
The data from all tubes were reviewed for this offset.
o 50% of the tubes were inspected with a +PointTM coil from 3-inches above the hot-leg top of tubesheet to the hot-leg tube-end focusing on the critical area (secondary side sludge pile).
o The U-bend region of 100% of the row 1 tubes were inspected with a +PointTM coil (from the seventh hot-leg tube support to the 7th cold-leg tube support).
o 100% of the dents and dings that were greater than 5 volts (as determined from the bobbin inspection) were inspected with a +PointTM coil.
o 20% of the dents and dings that were greater than 2 volts but less than 5 volts (as determined from the bobbin inspection) were inspected with a +PointTM coil.
o 100% of the over-rolls in the hot-leg were inspected with a +PointTM coil.
o 50% of the over-expansions in the tubesheet region on the hot-leg and the 10 largest over-expansions in the tubesheet region on the cold-leg were inspected with a +PointTM coil.
o 100% of the tubes that were not expanded or were only partially expanded into the tubesheet were inspected with a +PointTM coil throughout the tubesheet region.
o All bobbin I-codes were inspected with a +PointTM coil.
Enclosure
- Axially and circumferentially oriented primary water stress corrosion cracking was observed in SGs B and C near the hot-leg tube end so the scope of the inspections was expanded to include a +PointTM coil inspection of all tubes in SGs B and C from the hot-leg tube end to 4-inches above the hot-leg tube end. In addition, the inspections were expanded to include inspecting 20% of the tubes in SG A with a +PointTM coil from the hot-leg tube end to 4-inches above the hot-leg tube end. No other expansions were implemented at the time of the conference call (other than for tubes adjacent to possible loose parts).
- A magnetically biased +PointTM coil was used to inspect the initial indications detected near the hot-leg tube end in SGs B and C. These inspections were performed at a slower speed (i.e., 0.4-inches per second) and confirmed the presence of the original indications.
- Wear at the anti-vibration bars was detected. The indications exhibited minor (i.e.,
non-significant) growth since the prior inspections.
- One tube was identified with wear from a loose part. The indication was present during the last inspection (approximately 32-percent through-wall). The part was no longer at the location of the wear scar. The indication had not been sized at the time of the conference call. A new method for sizing these types of indications will be used this spring 2008 refueling outage.
- Overall, the inspections were approximately 94% complete in SG B and 50% complete in SG C at the time of the call. The tube end inspections were complete in SGs B and C and were commencing in SG A at the time of the call.
- No unusual or unexpected results (except for the indications near the tube end) were detected during the outage.
- All tubes exceeding the tube repair criteria will be plugged. In addition, tube end indications will be left in service if they satisfy the criteria of the interim alternate repair criteria for tubesheet indications (approved later by the NRC on May 16, 2008).
- Historical data reviews were performed during the outage. No issues were identified as a result of these reviews.
- The only crack-like indications detected during the outage occurred with 1-inch of the hot-leg tube end. In SG B, 39 tube end indications were detected in 37 tubes. Of these 39 indications, 9 were axially oriented and 30 were circumferentially oriented. All of the indications were within 0.17 inches of the tube end. Only one of these indications exceeded the criteria of the interim alternate repair criteria. This indication measured 117 degrees in circumferential extent. In SG C, 21 tube end indications were detected in 20 tubes. Of these 21 indications, 6 were axially oriented and 15 were circumferentially oriented. All of the indications were within 0.18 inches of the tube end. Two of these indications exceeded the criteria of the interim alternate repair criteria. These indications measured 109 degrees and 117 degrees in circumferential extent.
- No tubes were identified for in-situ pressure testing (based on industry guidelines). No tubes were scheduled to be removed for destructive examination.
- Based on the results to-date, all tubes satisfied the structural and leakage integrity performance criteria during the previous operating cycle (i.e., prior to end-of-cycle 21), and all tubes that will remain in service will satisfy the structural and leakage integrity performance criteria until the next planned inspection (end-of-cycle 22).
- If a crack-like indication is detected near the tube end in SG A, the plan is to expand the inspection to include 100% of the tube ends in SG A.
- In SGs A, B, and C, a high-volume bundle flush, foreign object search and retrieval, and sludge lancing were planned. In addition, a top down visual (video) inspection on the secondary side of the steam generator to the top (seventh) tube support plate was planned
for SGs B and C, and an ultrasonic inspection of one feedring component was scheduled in SG C.
- Eddy current data quality is verified during the inspections.
The NRC staff did not identify any issues that warranted immediate follow-up action during the conference call.
Surry Power Station, Units 1 & 2 cc:
Mr. David A. Christian Office of the Attorney General President and Chief Nuclear Officer Commonwealth of Virginia Virginia Electrical and Power Company 900 East Main Street Innsbrook Technical Center Richmond, Virginia 23219 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Ms. Lillian M. Cuoco, Esq. Dominion Resources Services, Inc.
Senior Counsel Innsbrook Technical Center Dominion Resources Services, Inc. 5000 Dominion Blvd.
120 Tredegar Street, RS-2 Glen Allen, Virginia 23060-6711 Richmond, VA 23219 Mr. Matt Adams, Director Mr. Donald E. Jernigan Nuclear Safety & Licensing Site Vice President Surry Power Station Surry Power Station Virginia Electric and Power Company Virginia Electric and Power Company 5570 Hog Island Road 5570 Hog Island Road Surry, Virginia 23883-0315 Surry, Virginia 23883-0315 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218 Dr. Robert B. Stroube, MD, MPH State Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218