Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23286A15513 October 2023Defueled Safety Analysis Report (DSAR)Offsite Dose Calculation Manual
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Aging Management
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
License Renewal
Earthquake
Turbine Missile
Fire Protection Program
ML21036A16929 January 2021ISFSI Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan Supplemental InformationCyber Security
ML20153A22829 May 2020Biological Opinion for Oyster Creek Shutdown and DecommissioningNJPDES
Biofouling
ML19214A0452 August 2019NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation
RA-18-084, Secondary Containment Capability Test14 September 2018Secondary Containment Capability Test
ML15093A28423 February 2015Enclosure 2: Flood Hazard Reevaluation Report for Oyster Creek Nuclear Generating Station, Rev. 1Safe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
RA-14-078, Secondary Containment Capability Test24 October 2014Secondary Containment Capability Test
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 124 September 2014Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1Through-Wall Leak
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14030A51319 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
Hardened vent
ML14038A11111 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Oyster Creek Nuclear Generating Station, TAC No.: MF0824Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
Hardened vent
ML15093A2833 July 2013Enclosure 1: Local Intense Precipitation Evaluation Report for Oyster Creek, Rev. 6Commercial Grade Dedication
RS-12-177, E Plan for Future Seismic Walkdown of Inaccessible Equipment26 April 2013E Plan for Future Seismic Walkdown of Inaccessible EquipmentUnanalyzed Condition
Fukushima Dai-Ichi
Scaffolding
ML13120A1869 April 2013Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal # 1 for the Oyster Creek Generating Station Correspondence No. RS-Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Arc flash
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Scram Discharge Volume
Frazil ice
Earthquake
Scaffolding
Weak link
ML12355A14231 December 20122012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2
RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 231 December 20122012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 2
RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 231 December 20122012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2
RA-12-117, Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident19 November 2012Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown
Unanalyzed Condition
High winds
Hydrostatic
Operator Manual Action
Functionality Assessment
Fukushima Dai-Ichi
Earthquake
Scaffolding
ML12359A0086 November 2012Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 1 of 4Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Arc flash
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Scram Discharge Volume
Frazil ice
Earthquake
Scaffolding
Weak link
ML12359A0066 November 2012Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 3 of 4
ML12359A0056 November 2012Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 2 of 4
RA-13-022, D Area Walk-By Checklists (Awcs)10 October 2012D Area Walk-By Checklists (Awcs)Scaffolding
RS-13-065, Core Spray/Auto Depress'N System Relay Logic Panel10 October 2012Core Spray/Auto Depress'N System Relay Logic Panel
ML10160018623 June 2010Final ASP Analysis - Oyster CreekFitness for Duty
Mission time
Significance Determination Process
ML10070049224 February 2010Reportable Event Rad 1.34, Rev. 10NJPDES
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML10070049324 February 2010Reportable Event Rad 1.4, Rev. 10Fitness for Duty
Enforcement Discretion
NJPDES
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML10074014824 February 2010Attachment 9 Micro ALARA Plan Work Sheet, Rev. 9High winds
Coatings
Through-Wall Leak
ML1020204195 June 2009Root Cause Evaluation Report for Tritium Leak at Oyster CreekNon-Destructive Examination
Coatings
Through-Wall Leak
ML10202033220 May 2009Gamma Spectrum Analysis
ML10202036320 May 2009Gamma Spectrum Analysis
ML10202036420 May 2009Gamma Spectrum Analysis
ML1020203287 May 2009Gamma Spectrum Analysis
ML1020203277 May 2009Gamma Spectrum Analysis
ML1020203267 May 2009Gamma Spectrum Analysis
ML1020203257 May 2009Issue Entry, Oc
ML1020203297 May 2009Gamma Spectrum Analysis
ML1020203241 May 2009AR 00914559 Report
ML10074015928 April 2009Report of Analysis/Certificate of Conformance, L38101
ML10202032327 April 2009Gamma Spectrum Analysis
ML10200046626 April 2009Gamma Spectrum Analysis
ML10200046225 April 2009Gamma Spectrum Analysis Oyster Creek
ML10200046525 April 2009Gamma Spectrum Analysis
ML10200046425 April 2009Gamma Spectrum Analysis Oyster Creek
ML10200046325 April 2009Gamma Spectrum Analysis Oyster Creek
ML10200045925 April 2009Gamma Spectrum Analysis Oyster Creek
ML10200046025 April 2009Gamma Spectrum Analysis Oyster Creek
ML0910407276 April 2009Document No. 17693-R-001, Revision 0, NJDEP Oyster Creek Drywell ReviewHydrostatic
Finite Element Analysis
Earthquake
ML10074015724 March 2009Report of Analysis/Certificate of Conformance, L38010
ML10074015824 March 2009Report of Analysis/Certificate of Conformance, L38009
ML10074015422 March 2009Report of Analysis/Certificate of Conformance, L37854