Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23286A155 | 13 October 2023 | Defueled Safety Analysis Report (DSAR) | Offsite Dose Calculation Manual Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Aging Management Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program License Renewal Earthquake Turbine Missile Fire Protection Program |
ML23025A011 | 24 January 2023 | LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G | |
ML22130A688 | 10 May 2022 | Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G | |
ML21036A169 | 29 January 2021 | ISFSI Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan Supplemental Information | Cyber Security |
ML20153A228 | 29 May 2020 | Biological Opinion for Oyster Creek Shutdown and Decommissioning | NJPDES Biofouling |
ML19214A045 | 2 August 2019 | NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation | |
ML19029B333 | 29 January 2019 | Security Inspection Plan for Oyster Creek Station - 2019 | |
RA-18-084, Secondary Containment Capability Test | 14 September 2018 | Secondary Containment Capability Test | |
ML18033B744 | 21 February 2018 | Staff Assessment of the Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation | Safe Shutdown Ultimate heat sink Fukushima Dai-Ichi Flooding Focused Evaluation Earthquake |
RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 | 16 May 2017 | Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 | Operator Manual Action |
ML15350A353 | 17 February 2016 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force... | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 | 26 May 2015 | Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 | Half scram Temporary Modification |
ML15093A284 | 23 February 2015 | Enclosure 2: Flood Hazard Reevaluation Report for Oyster Creek Nuclear Generating Station, Rev. 1 | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Hydrostatic Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
RA-14-078, Secondary Containment Capability Test | 24 October 2014 | Secondary Containment Capability Test | |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Through-Wall Leak |
RA-14-068, Sea Turtle Incidental Take Report 2014-3 | 1 August 2014 | Sea Turtle Incidental Take Report 2014-3 | |
ML14176A961 | 24 June 2014 | Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 | Fire Barrier Coatings Foreign Material Exclusion |
ML14065A232 | 16 June 2014 | Staff Assessment of Response to Enclosure 4 of the March 12, 2012, 10 CFR 50.54(F) Information Request - Flooding Walkdowns | Unanalyzed Condition Operator Manual Action Fukushima Dai-Ichi Earthquake |
ML14030A513 | 19 February 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown High winds Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Earthquake Hardened vent |
ML14038A111 | 11 February 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Oyster Creek Nuclear Generating Station, TAC No.: MF0824 | Safe Shutdown High winds Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Earthquake Hardened vent |
NEI 99-04, Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012 | 23 December 2013 | Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012 | Aging Management |
RA-13-127, Commitment Change Summary Report - 2012 | 23 December 2013 | Commitment Change Summary Report - 2012 | Aging Management |
RA-13-088, Sea Turtle Incidental Take Report 2013-5 | 9 September 2013 | Sea Turtle Incidental Take Report 2013-5 | |
RA-13-074, Sea Turtle Incidental Take Reports 2013-1 and 2013-2 | 9 August 2013 | Sea Turtle Incidental Take Reports 2013-1 and 2013-2 | |
ML15093A283 | 3 July 2013 | Enclosure 1: Local Intense Precipitation Evaluation Report for Oyster Creek, Rev. 6 | Commercial Grade Dedication |
RS-12-177, E Plan for Future Seismic Walkdown of Inaccessible Equipment | 26 April 2013 | E Plan for Future Seismic Walkdown of Inaccessible Equipment | Unanalyzed Condition Fukushima Dai-Ichi Scaffolding |
ML13120A186 | 9 April 2013 | Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal # 1 for the Oyster Creek Generating Station Correspondence No. RS- | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Arc flash Finite Element Analysis Fukushima Dai-Ichi Design basis earthquake Scram Discharge Volume Frazil ice Earthquake Scaffolding Weak link |
ML13098A209 | 5 April 2013 | 2.206 Petition by New Jersey Environmental Federation (Et.Al.) for Oyster Creek Nuclear Generating Station Exelon Generation Company, LLC | Safe Shutdown Weld Overlay Aging Management Fukushima Dai-Ichi Through-Wall Leak |
IR 05000272/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000456/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
ML13008A219 | 31 January 2013 | U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000454/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000461/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000237/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000373/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000289/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000254/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000277/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000219/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000352/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
ML12355A142 | 31 December 2012 | 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 | |
RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 2 | 31 December 2012 | 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 2 | |
RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 | 31 December 2012 | 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 | |
RA-12-117, Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 19 November 2012 | Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Safe Shutdown Unanalyzed Condition High winds Hydrostatic Operator Manual Action Functionality Assessment Fukushima Dai-Ichi Earthquake Scaffolding |
ML12359A008 | 6 November 2012 | Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 1 of 4 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Arc flash Finite Element Analysis Fukushima Dai-Ichi Design basis earthquake Scram Discharge Volume Frazil ice Earthquake Scaffolding Weak link |
ML12359A006 | 6 November 2012 | Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 3 of 4 | |
ML12359A005 | 6 November 2012 | Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 2 of 4 | |
RS-13-065, Core Spray/Auto Depress'N System Relay Logic Panel | 10 October 2012 | Core Spray/Auto Depress'N System Relay Logic Panel | |
RA-13-022, D Area Walk-By Checklists (Awcs) | 10 October 2012 | D Area Walk-By Checklists (Awcs) | Scaffolding |
ML12178A215 | 2 August 2012 | Closeout of Bulletin 2011-01 Migrating Strategies. | B.5.b Mitigating Strategies |