 Issue dateTitleTopic
ML23286A15513 October 2023Defueled Safety Analysis Report (DSAR)Offsite Dose Calculation Manual
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Aging Management
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
License Renewal
Earthquake
Turbine Missile
Fire Protection Program
ML23025A01124 January 2023LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G
ML22130A68810 May 2022Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G
ML21036A16929 January 2021ISFSI Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan Supplemental InformationCyber Security
ML20153A22829 May 2020Biological Opinion for Oyster Creek Shutdown and DecommissioningNJPDES
Biofouling
ML19214A0452 August 2019NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation
ML19029B33329 January 2019Security Inspection Plan for Oyster Creek Station - 2019
RA-18-084, Secondary Containment Capability Test14 September 2018Secondary Containment Capability Test
ML18033B74421 February 2018Staff Assessment of the Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism ReevaluationSafe Shutdown
Ultimate heat sink
Fukushima Dai-Ichi
Flooding Focused Evaluation
Earthquake
RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 201616 May 2017Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016Operator Manual Action
ML15350A35317 February 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force...Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 201426 May 2015Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014Half scram
Temporary Modification
ML15093A28423 February 2015Enclosure 2: Flood Hazard Reevaluation Report for Oyster Creek Nuclear Generating Station, Rev. 1Safe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
RA-14-078, Secondary Containment Capability Test24 October 2014Secondary Containment Capability Test
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 124 September 2014Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1Through-Wall Leak
RA-14-068, Sea Turtle Incidental Take Report 2014-31 August 2014Sea Turtle Incidental Take Report 2014-3
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14065A23216 June 2014Staff Assessment of Response to Enclosure 4 of the March 12, 2012, 10 CFR 50.54(F) Information Request - Flooding WalkdownsUnanalyzed Condition
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
ML14030A51319 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
Hardened vent
ML14038A11111 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Oyster Creek Nuclear Generating Station, TAC No.: MF0824Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
Hardened vent
NEI 99-04, Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 201223 December 2013Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012Aging Management
RA-13-127, Commitment Change Summary Report - 201223 December 2013Commitment Change Summary Report - 2012Aging Management
RA-13-088, Sea Turtle Incidental Take Report 2013-59 September 2013Sea Turtle Incidental Take Report 2013-5
RA-13-074, Sea Turtle Incidental Take Reports 2013-1 and 2013-29 August 2013Sea Turtle Incidental Take Reports 2013-1 and 2013-2
ML15093A2833 July 2013Enclosure 1: Local Intense Precipitation Evaluation Report for Oyster Creek, Rev. 6Commercial Grade Dedication
RS-12-177, E Plan for Future Seismic Walkdown of Inaccessible Equipment26 April 2013E Plan for Future Seismic Walkdown of Inaccessible EquipmentUnanalyzed Condition
Fukushima Dai-Ichi
Scaffolding
ML13120A1869 April 2013Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal # 1 for the Oyster Creek Generating Station Correspondence No. RS-Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Arc flash
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Scram Discharge Volume
Frazil ice
Earthquake
Scaffolding
Weak link
ML13098A2095 April 20132.206 Petition by New Jersey Environmental Federation (Et.Al.) for Oyster Creek Nuclear Generating Station Exelon Generation Company, LLCSafe Shutdown
Weld Overlay
Aging Management
Fukushima Dai-Ichi
Through-Wall Leak
IR 05000272/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000456/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
ML13008A21931 January 2013U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000454/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000461/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000237/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000373/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000289/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000254/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000277/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000219/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000352/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
ML12355A14231 December 20122012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2
RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 231 December 20122012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 2
RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 231 December 20122012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2
RA-12-117, Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident19 November 2012Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown
Unanalyzed Condition
High winds
Hydrostatic
Operator Manual Action
Functionality Assessment
Fukushima Dai-Ichi
Earthquake
Scaffolding
ML12359A0086 November 2012Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 1 of 4Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Arc flash
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Scram Discharge Volume
Frazil ice
Earthquake
Scaffolding
Weak link
ML12359A0066 November 2012Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 3 of 4
ML12359A0056 November 2012Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 2 of 4
RS-13-065, Core Spray/Auto Depress'N System Relay Logic Panel10 October 2012Core Spray/Auto Depress'N System Relay Logic Panel
RA-13-022, D Area Walk-By Checklists (Awcs)10 October 2012D Area Walk-By Checklists (Awcs)Scaffolding
ML12178A2152 August 2012Closeout of Bulletin 2011-01 Migrating Strategies.B.5.b Mitigating Strategies