04/27-28/2004 Summary of Meeting on the D.C. Cook Technical Specifications Conversion Acceptance Review
ML042230038
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/09/2004
From: Peter Hearn
NRC/NRR/DIPM/IROB
To: Boyce T
NRC/NRR/DIPM/IROB
Hearn, P, NRR/DIPM/IROB, 301-415-11
References
Download: ML042230038 (3)


Text

August 9, 2004 MEMORANDUM TO: Thomas H. Boyce, Section Chief Technical Specification Section Reactor Operations Branch Division of Inspection Program Management, NRR FROM: Peter Hearn, Senior Reactor Systems Engineer /RA/

Technical Specifications Section Reactor Operations Branch Division of Inspection Program Management, NRR

SUBJECT:

SUMMARY

OF MEETING ON THE D.C. COOK TECHNICAL SPECIFICATIONS CONVERSION ACCEPTANCE REVIEW On April 27 and 28, 2004 , the Technical Specification Section staff conducted a meeting with representatives of American Electric Power in order to discuss the D.C. Cook Nuclear Plant Units 1 and 2 Conversion to the Improved Technical Specifications. The purpose of the meeting was to discuss NRC staff comments on using the accelerated review process on the Cook submittal. The Cook submittal is the pilot program for an accelerated review process which employs improved electronic and oral communications to expedite the review process resulting in a substantial savings in review time. The goal of this pilot program is to significantly reduce the amount of time required to conduct a TS Conversion which currently takes about 16 months.

The staff and the license met to discuss TS Sections 1.0 thru 5.0 and Beyond Scope Issues 1 thru 35. The Cook TS Conversion submittal was accepted by the staff for the accelerated review and the formal review commenced on April 12, 2004.

Attachment:

Agenda CONTACT: Peter C. Hearn, NRR 301-415-1189 E-mail: pch@nrc.gov

August 9, 2004 MEMORANDUM TO: Thomas H. Boyce, Section Chief Technical Specification Section Reactor Operations Branch Division of Inspection Program Management, NRR FROM: Peter Hearn, Senior Reactor Systems Engineer /RA/

Technical Specifications Section Reactor Operations Branch Division of Inspection Program Management, NRR

SUBJECT:

SUMMARY

OF MEETING ON THE D.C. COOK TECHNICAL SPECIFICATIONS CONVERSION ACCEPTANCE REVIEW On April 27 and 28, 2004 , the Technical Specification Section staff conducted a meeting with representatives of American Electric Power in order to discuss the D.C. Cook Nuclear Plant Units 1 and 2 Conversion to the Improved Technical Specifications. The purpose of the meeting was to discuss NRC staff comments on using the accelerated review process on the Cook submittal. The Cook submittal is the pilot program for an accelerated review process which employs improved electronic and oral communications to expedite the review process resulting in a substantial savings in review time. The goal of this pilot program is to significantly reduce the amount of time required to conduct a TS Conversion which currently takes about 16 months.

The staff and the license met to discuss TS Sections 1.0 thru 5.0 and Beyond Scope Issues 1 thru 35. The Cook TS Conversion submittal was accepted by the staff for the accelerated review and the formal review commenced on April 12, 2004.

Attachment:

Agenda CONTACT: Peter C. Hearn, NRR 301-415-1189 E-mail: pch@nrc.gov DISTRIBUTION:

TSS R/F PCHearn ADAMS ACCESSION NUMBER: ML042230038 DOCUMENT NAME: G:\DIPM\TSS\Hearn\COOK ACCEPTANCE REVIEW 1.wpd OFFICE TSS:IROB:DIPM SC:TSS:IROB:DIPM NAME PCHearn THBoyce DATE 08/09/2004 08/09/2004

OFFICIAL RECORD COPY AGENDA Cook Acceptance Review Schedule April 27, 2004 9:00 - 10:30 - Bob Tjader - 2.0, 3.0, 3.1, 3.9, 3.10 10:30 - 11:30 - Tommy Le - 3.8 11:30 - 12:30 - Pete Hearn - 1.0, 3.6, 3.7, 4.0,5.0 April 28, 2004 9:00 - 10:30 - Kerri Kavanagh - 3.4, 3.5 Attachment