ML062540166
ML062540166 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 07/29/2004 |
From: | Peter Hearn NRC/NRR/DIPM/IROB |
To: | Boyce T NRC/NRR/DIPM/IROB |
References | |
FOIA/PA-2006-0258 | |
Download: ML062540166 (2) | |
Similar Documents at Cook | |
---|---|
Category:Meeting Agenda
MONTHYEARPMNS20241289, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22024-10-29029 October 2024
[Table view]Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 PMNS20240486, Meeting with Indiana Michigan Power Company (I&M) Regarding Capsule Withdrawal Schedule2024-04-0505 April 2024 Meeting with Indiana Michigan Power Company (I&M) Regarding Capsule Withdrawal Schedule PMNS20231429, Meeting in Support of License Amendment Review Regarding Neutron Flux Channels2023-12-27027 December 2023 Meeting in Support of License Amendment Review Regarding Neutron Flux Channels PMNS20230842, Pre-Application Meeting Regarding Potential License Amendment Request Related to Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22023-07-28028 July 2023 Pre-Application Meeting Regarding Potential License Amendment Request Related to Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 PMNS20221232, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22022-11-29029 November 2022 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 PMNS20221117, Pre-Application Meeting Regarding Neutron Flux Channels2022-11-0303 November 2022 Pre-Application Meeting Regarding Neutron Flux Channels PMNS20211596, Pre-Application Meeting Regarding Regarding Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22022-01-0707 January 2022 Pre-Application Meeting Regarding Regarding Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22006A3482022-01-0606 January 2022 Pre-Application Meeting January 11, 2022, Slides Regarding GSI-191 PMNS20211496, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Quality Assurance Program for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22021-11-22022 November 2021 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Quality Assurance Program for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 PMNS20211167, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Licensing Basis of Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 to Support Increased Damping Levels for Seismic Analysis of Piping2021-09-0808 September 2021 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Licensing Basis of Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 to Support Increased Damping Levels for Seismic Analysis of Piping PMNS20210907, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22021-07-15015 July 2021 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 PMNS20210248, Pre-Application Meeting Regarding Containment Water Level Channels2021-03-18018 March 2021 Pre-Application Meeting Regarding Containment Water Level Channels PMNS20201331, Pre-Application Meeting Regarding Type a Test Interval Extension2020-11-17017 November 2020 Pre-Application Meeting Regarding Type a Test Interval Extension PMNS20201176, Pre-Application Meeting Regarding Potential N-729 Relief Request2020-10-0101 October 2020 Pre-Application Meeting Regarding Potential N-729 Relief Request ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML14169A4862014-06-13013 June 2014 D. Ccook Operator License Workshop Invitation ML13161A3802013-06-12012 June 2013 Meeting Notice with Indiana Michigan Power Company (I&M) Concerning Donald C. Cook Nuclear Plant, Unit 1 ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML1116402632011-06-16016 June 2011 EOC NRC Slides for Meeting ML0810702382008-04-16016 April 2008 Slides - D.C. Cook Annual Assessment Meeting, CY2007 Reactor Oversight Program ML0734800872007-12-12012 December 2007 D.C. Cook Meeting Handout on Ice Condenser Ice Fusion ML0732410262007-11-21021 November 2007 Notice of Meeting with D. C. Cook to Discuss Issues Concerning Ice Fusion in Ice Condenser Baskets ML0729601702007-10-31031 October 2007 Public Meeting Summary on the Reactor Oversight Process ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0710603252007-04-17017 April 2007 Notice of Meeting with D. C. Cook Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors ML0623705122006-09-19019 September 2006 Memo: Summary of NFPA 805 Workshop at DC Cook ML0617001312006-06-22022 June 2006 07/24-26/2006 Forthcoming Meeting with DC Cook to Discuss Transition to Title 10 of the Code of Federal Regulations Part 50.48(c) (NFPA 805 Rule) ML0433403052004-11-30030 November 2004 Notice of Meeting with Indiana Michigan Power Company to Discuss the Degraded Voltage Protection Design at the Donald C. Cook Nuclear Plant ML0425401832004-09-10010 September 2004 & 09/15/2004, Forthcoming Meeting with Indiana Michigan Power Company on Donald C. Cook Nuclear Plant, Units 1 and 2 ML0422300382004-08-0909 August 2004 04/27-28/2004 Summary of Meeting on the D.C. Cook Technical Specifications Conversion Acceptance Review ML0625401662004-07-29029 July 2004 Memo P. Hearn, NRR, to T. Boyce, NRC, Summary of Meeting on the D.C. Cook Technical Specifications Conversion Acceptance Review ML0418305202004-07-0101 July 2004 to 07/30/2004 Meeting with D.C. Cook Representatives to Exchange Information on the Proposed Conversion of D.C. Cook Current TS to the Standard Technical Specification ML0416000022004-06-0707 June 2004 07/02/2004 Notice of Meeting with D.C. Cook Representatives for the Purpose of Exchanging Information on the Proposed Conversion of the D.C. Cook Current TS to the Standard Technical Specification ML0410601092004-04-15015 April 2004 Forthcoming Meeting with NEI & Other Industry Representatives Re Status of Initiatives to Develop Generic Risk Management Technical Specification Improvements ML0410401732004-04-0909 April 2004 04/27-28/2004 Notice of Meeting with D.C. Cook Representatives to Exchange Information on Proposed Conversion of D. C. Cook Current TS to Standard Technical Specification ML0329704812003-10-24024 October 2003 Notice of Meeting with Indiana Michigan Power Company Re the Licensee'S Plans to Transition to Framatome Anp Fuel ML0312105392003-05-0101 May 2003 Meeting with TVA and American Electric Power Staff'S Draft Evaluation for Ice Condenser Topical Report McGuire, Catawba, Sequoyah, Watts Bar, and D.C.Cook 2024-04-05 Category:Meeting Summary MONTHYEARML24183A2292024-07-0101 July 2024
[Table view]Summary of Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML24103A1872024-04-16016 April 2024 Summary of Meeting with Indiana Michigan Power Co., Regarding Surveillance Capsule Program for DC Cook Nuclear Plant, Unit 2 ML24031A5872024-02-0202 February 2024 Summary of Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23215A1662023-08-17017 August 2023 Summary of July 31, 2023, Meeting with Indiana Michigan Power Company Regarding Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23199A2402023-07-19019 July 2023 Summary of the July 13, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML22355A6022023-01-0303 January 2023 Summary of December 14, 2022, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22318A1992022-11-21021 November 2022 Summary of November 7, 2022, Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22154A5342022-06-0909 June 2022 Summary of the June 1, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML22011A2732022-01-13013 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Planned Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21349B3092022-01-0303 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Potential Changes to the Quality Assurance Program for Donald C. Cook Nuclear Plant, Units 1 and 2 ML21202A1072021-07-23023 July 2021 Summary of July 20, 2021, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21196A5182021-07-15015 July 2021 July 8, 2021, Summary of Public Webinar to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant ML21082A0052021-03-24024 March 2021 Summary of March 19, 2021, with Indiana Michigan Power Company Regarding Containment Water Level Channels for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20349A0152020-12-17017 December 2020 Summary of November 30, 2020, Teleconference with Indiana Michigan Power Company Regarding a Planned License Amendment Request to Extend the Containment Integrated Leak Rate Testing Interval for Donald C. Cook Nuclear Plant, Unit No. 2 ML20282A2712020-10-14014 October 2020 Summary of October 2, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML20248H4752020-09-10010 September 2020 Summary of August 6, 2020, Teleconference with Indian Michigan Power Company Related to Steam Generator Eddy Current Testing License Amendment Request ML20209A6032020-07-27027 July 2020 Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2 ML20133K1282020-05-21021 May 2020 Summary of May 4, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20121A0692020-05-0404 May 2020 Summary of Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20041C9492020-02-13013 February 2020 Summary of February 6, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19350A0552019-12-30030 December 2019 Summary of 12/12/2019 Meeting with Indiana Michigan Power Company, License Amendment Request for D.C. Cook Nuclear Plant, Units 1 and 2 to Delete Surveillance Requirement Related to Diesel Generator Load Test Resistor Banks ML19212A5652019-07-30030 July 2019 Summary of Public Open House to Discuss NRC Activities and the 2018 End-Of-Cycle Performance Assessment of Donald C. Cook Nuclear Generating Plant, Units 1 and 2 ML19141A0622019-06-0606 June 2019 Summary of November 19, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19099A3262019-04-16016 April 2019 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19067A0482019-03-12012 March 2019 Summary of Public Teleconference with Indiana Michigan Power Co. (I&M) Review of LAR for Approval of Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping (EPID-2019-LLA-0054) ML18334A0402018-12-13013 December 2018 Summary of Meeting with Indian Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML18109A0692018-04-26026 April 2018 Summary of April 10, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML18052B0542018-02-26026 February 2018 Summary of February 15, 2018, Meeting with Indian Michigan Power Company Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (EPID L-2018-LRM-0008 ML18018B1382018-01-22022 January 2018 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML17265A4922017-10-0404 October 2017 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 2 ML17235B1232017-08-23023 August 2017 Summary of the July 27, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML17082A0762017-03-27027 March 2017 Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML16308A1132016-11-16016 November 2016 Summary of October 27, 2016, Public Meeting with Indiana Michigan Power Company Regarding the Donald C. Cook Nuclear Plant, Units 1 and 2 ML16244A7062016-08-30030 August 2016 Summary of the August 22, 2016, Donald C. Cook Public Meeting ML16193A5912016-07-15015 July 2016 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15271A0462015-10-0505 October 2015 Summary of Public Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15237A3362015-09-0202 September 2015 Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket Weld ML15107A0982015-04-24024 April 2015 April 14, 2015, Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML14311A3182014-11-14014 November 2014 Summary of Conference Call with Donald C. Cook Nuclear Plant, Unit 1 Regarding the Fall 2014 Steam Generator Inspections ML14231A0752014-08-27027 August 2014 Summary of the August 8, 2014, Pre-Application Meeting with American Electric Power Company to Discuss a Future License Amendment Request for Alternative Source Term and TSTF-490 ML14209A9422014-07-30030 July 2014 July 9, 2014, Summary of Category 1, Public Meeting with Indiana Michigan Power Company to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14199A0802014-07-18018 July 2014 Summary of July 8, 2014 Donald C. Cook Public Annual Assessment Meeting ML14023A3872014-01-30030 January 2014 Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant Event ML13210A2272013-08-0202 August 2013 6/26/13, Summary of Pre-Application Meeting to Discuss Pending License Amendment Request to Modify the CNP Unit 1 Normal Operating Pressure and Temperature ML13189A2322013-07-15015 July 2013 Summary of Conference Telephone Call Regarding the 2013 Steam Generator Tube Inspections ML13154A4062013-06-0303 June 2013 5/30/2013 - Summary of the D.C. Cook Public Meeting ML12159A4022012-06-0707 June 2012 May 31, 2012 Summary of Public Meeting to Discuss the 2011 Annual Assessment Results for D.C. Cook ML1133307782011-11-29029 November 2011 Record of Discussion by Phone on 10/5/11 Regarding Steam Generator Inspection ML11129A2422011-06-0808 June 2011 Summary of Meeting with Indiana Michigan Power Company to Discuss Issues Related to a Future Submittal Using NFPA 805 ML0931305572009-11-0909 November 2009 Summary of Public Meeting with Staff from the D.C. Cook Nuclear Power Plant Regarding the September 2008 Unit 1 Turbine Vibration Event 2024-07-01 |
Text
A July 29, 2004 MEMORANDUM TO: Thomas H. Boyce, Section Chief Technical Specification Section Reactor Operations Branch Division of Inspection Program Management, NRR FROM: Peter Hearn, Senior Reactor Systems Engineer IRA!
Technical Specifications Section Reactor Operations Branch Division of Inspection Program Management, NRR
SUBJECT:
SUMMARY
OF MEETING ON THE D.C. COOK TECHNICAL SPECIFICATIONS CONVERSION ACCEPTANCE REVIEW On April 27 and 28, 2004 , the Technical Specification Section staff conducted a meeting with representatives of American Electric Power in order to discuss the D.C. Cook Nuclear Plant Units 1 and 2 Conversion to the Improved Technical Specifications. The purpose of the meeting was to discuss NRC staff comments on providing information necessary to review the Cook submittal with the accelerated review process. The Cook submittal is the pilot program for the accelerated review process which employs improved electronic and oral communications to expedite the review process resulting in a substantial savings in review time. The goal of this pilot program is to reduce a 16 month TS Conversion to 8 months.
The staff and the license met to discuss The Cook TS Conversion submittal was accepted by the staff for the accelerated review and the formal review commenced on April 29, 2004.
R1L
AGENDA Cook Acceptance Review Schedule April 27, 2004 9:00 - 10:30- Bob Tjader - 2.0, 3.0, 3.1, 3.9, 3.10 10:30 - 11:30 - Tommy Le - 3.8 11:30 - 12:30 - Pete Hearn - 1.0, 3.6, 3.7, 4.0,5.0 April 28, 2004 9:00 - 10:30 - Kerri Kavanagh - 3.4, 3.5