ML061700131

From kanterella
Jump to navigation Jump to search
07/24-26/2006 Forthcoming Meeting with DC Cook to Discuss Transition to Title 10 of the Code of Federal Regulations Part 50.48(c) (NFPA 805 Rule)
ML061700131
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/22/2006
From: Lain P
NRC/NRR/ADRA/DRA/AFPB
To: Sunil Weerakkody
NRC/NRR/ADRA/DRA/AFPB
Lain P, NRR/DRA, 415-2346
References
Download: ML061700131 (4)


Text

June 22, 2006 MEMORANDUM TO: Sunil Weerakkody, Branch Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM: Paul Lain, Senior Fire Protection Engineer /RA/

Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING DC COOK TRANSITION TO TITLE 10 OF THE CODE OF FEDERAL REGULATIONS PART 50.48(c) WORKSHOP DATE & TIME: July 24 - 26, 2006 1:00 p.m. - 4:30 p.m. (July 24) 8:30 a.m. - 4:30 p.m. (July 25) 8:00 a.m. - 11:30 a.m. (July 26)

LOCATION: American Electric Power (AEP)

Nuclear Generation Group Buchanan Office 500 Circle Drive Buchanan, MI 49107-1395 PURPOSE: To discuss aspects of Donald C. Cook Nuclear Plants transitioning to the new fire protection licensing basis, 10 CFR 50.48(c) (NFPA 805 Rule).

CATEGORY*: This is a Category 3 meeting. The public is invited to participate in this meeting by providing comments and asking questions throughout the meeting.

CONTACTS: Please call either contact for space availability.

Paul Lain, DRA/NRR Richard Gray, AEP 301-415-2346 269-697-5743 pwl@nrc.gov rlgray2@aep.com PARTICIPANTS: NRC Stakeholders P. Lain AEP R. Gallucci Industry representatives R. Radlinski Consultants to the industry R. Langstaff Public

Enclosure:

Agenda

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings, (67 FR 36920) May 28, 2002

MEMORANDUM TO: Sunil Weerakkody, Branch Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING DC COOK TRANSITION TO TITLE 10 OF THE CODE OF FEDERAL REGULATIONS PART 50.48(c) WORKSHOP DATE & TIME: July 24 - 26, 2006 1:00 p.m. - 4:30 p.m. (July 24) 8:30 a.m. - 4:30 p.m. (July 25) 8:00 a.m. - 11:30 a.m. (July 26)

LOCATION: American Electric Power (AEP)

Nuclear Generation Group Buchanan Office 500 Circle Drive Buchanan, MI 49107-1395 PURPOSE: To discuss aspects of Donald C. Cook Nuclear Plants transitioning to the new fire protection licensing basis, 10 CFR 50.48(c) (NFPA 805 Rule).

CATEGORY*: This is a Category 3 meeting. The public is invited to participate in this meeting by providing comments and asking questions throughout the meeting.

CONTACTS: Please call either contact for space availability.

Paul Lain, DRA/NRR Richard Gray, AEP 301-415-2346 269-697-5743 pwl@nrc.gov rlgray2@aep.com PARTICIPANTS: NRC Stakeholders P. Lain AEP R. Gallucci Industry representatives R. Radlinski Consultants to the industry R. Langstaff Public

Enclosure:

Agenda Distribution:

ADAMS JLyons TQuay MTschiltz AFPB R/F PMNS PUBLIC RLangstaff, RIII AFPB RidsRgn1MailCenter JRogge, RI MSalley, RES RidsNrrDra RidsRgn2MailCenter ELea, RII PKoltay, DIRS/IR RidsNrrDraAfpb RidsRgn3MailCenter JLara, RIII SDinsmore, DRA/APLA RidsNrrDirsIrib RidsRgn4MailCenter LSmith, RIV QNguyen, DRL/RLR Adams Accession: ML061700131 OFFICE AFPB/FPE BC:AFPB/DRA NAME PLain SWeerakkody /A. Klein for S.W DATE 06/22/06 06/22/06 OFFICIAL RECORD COPY

NFPA 805 TRANSITION WORKSHOP July 24-26, 2006 AEP Nuclear Generation Group - Buchanan Office AGENDA PURPOSE: To discuss aspects of Donald C. Cook Nuclear Plants transitioning to the new fire protection licensing basis, 10 CFR 50.48(c) (NFPA 805 Rule).

Monday July 24, 2006 1:00 Introduction Welcome, Introductions, Agenda, etc.

1:15 Region 3 Plant Status Cook & Callaway Overview, Give other plants the opportunity to identify progress to date 2:00 Regulatory Status NRC - RG 1.205, Enforcement Discretion, Regulatory Information Summaries, Generic Letters, etc 3:00 Break 3:15 Fundamental Elements Prior Approvals, Code compliance/deviations, Alternate Transition methodology/guidance for GL 86-10s, Systems/features required to meet Chapter 3 4:30 Adjourn Tuesday July 25, 2006 8:30 Nuclear Safety III.G.1, 2 & 3 Area Transitions, deterministic vs. performance -

Capability Transition based, need for change evaluation, etc 9:30 Recovery Actions Existing manual actions and prior approval, Feasibility criteria, Regulatory Information Summary, Recovery actions identified during transition, Change evaluations for credited recovery actions, etc 10:30 Break 10:45 Non-Simple Fires Self-ignited cable fires, Transient Fires, Hot Work, High Energy Arcing Faults 12:00 Lunch 1:00 Fire PRA PRA Component list development, Fire ignition frequencies, PRA Model issues, Annunciation/alarm circuits 2:30 Break 2:45 Multiple Spurious Double Break Design, Initial Risk Screening, Use of Fire Operations Modeling, Expert Panel, Generic Letter 4:30 Adjourn Wednesday July 26, 2006 8:00 Non-Power Operation Scope of systems and components, NEI 04-02 Appendix F changes, Level of analysis - Qualitative Approach, Shutdown PRA requirement 9:15 Break 9:30 Open Dialog with NRC Topics include Fire PRA Peer Reviews, NFPA 805 Standard License Condition, etc 11:30 Adjourn