|
---|
Category:Legal-Affidavit
MONTHYEARL-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 ML21211A5962021-06-30030 June 2021 Attachments 9a, B, 10a, B, 11a, 12a and 13a and 13b, Including ANP-3933NP, Revision 0, Monticello ATWS-I Evaluation for Atrium 11 Fuel, Affidavit L-MT-21-034, Affidavit for Cycle 31 Core Operating Limits Report - NAD-MN-047P2021-05-13013 May 2021 Affidavit for Cycle 31 Core Operating Limits Report - NAD-MN-047P L-MT-16-028, Transmittal of Extended Power Uprate, Extended Steam Dryer - Response to Requests for Additional Information2016-05-18018 May 2016 Transmittal of Extended Power Uprate, Extended Steam Dryer - Response to Requests for Additional Information ML15289A0732015-10-12012 October 2015 Submittal of Power Ascension Testing Results for Replacement Steam Dryer L-MT-15-065, Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits2015-09-29029 September 2015 Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits ML15348A2202015-08-26026 August 2015 Enclosure 9, Areva Affidavits ML14204A7092014-07-23023 July 2014 Enclosure 3, Affidavit of Peter M. Yandow L-MT-14-060, Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information, Revised Limit Curves and Supporting Information2014-07-22022 July 2014 Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information, Revised Limit Curves and Supporting Information L-MT-14-016, Calculation 11042-0204, Revision 2, Structural and Allowable Flaw Size Evaluation of the Spent Fuel Storage Canisters with Nonconforming Closure Welds at Monticello Nuclear Generating Plant2014-07-0707 July 2014 Calculation 11042-0204, Revision 2, Structural and Allowable Flaw Size Evaluation of the Spent Fuel Storage Canisters with Nonconforming Closure Welds at Monticello Nuclear Generating Plant ML15348A2152014-07-0707 July 2014 Enclosure 4, General Electric Hitachi (GEH)- Affidavit L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit2013-12-20020 December 2013 Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit ML13282A1412013-10-0404 October 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses L-MT-13-070, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses2013-07-31031 July 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses L-MT-13-059, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Informati2013-06-26026 June 2013 Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Information L-MT-13-033, Extended Power Uprate: Secy 11-0014 Use of Containment Accident Pressure - Responses to Requests for Additional Information2013-03-21021 March 2013 Extended Power Uprate: Secy 11-0014 Use of Containment Accident Pressure - Responses to Requests for Additional Information ML1127000682011-09-26026 September 2011 Enclosure 3, Mfn 10-245 R4, Affidavit ML0923903232009-08-10010 August 2009 Enclosure 2 - Continuum Dynamics Affidavit ML0520003282005-07-14014 July 2005 Surveillance Program for Channel-Control Blade Interference ML0413101222004-04-30030 April 2004 Request for Closed Meeting with USNRC to Discuss NMC Refueling Plans 2023-07-04
[Table view] |
Text
ENCLOSURE 2 CONTINUUM DYNAMICS AFFIDAVIT 2 PAGES FOLLOW
C - Continuum Dynamics, Inc.
(OUY) 530-0444 (609) 538-0464 fax 34 Lexington Avenue Ewing, NJ 08618-2302 AFFIDAVIT Re: C.D.I. Technical Note No. 08- 12P "Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Monticello," Revision 3 I, Barbara A. Agans, being duly sworn, depose and state as follows:
I hold the position of Director, Business Administration of Continuum Dynamics, Inc. (hereinafter referred to as C.D.I.), and I am authorized to make the request for withholding from Public Record the Information contained in the document described in Paragraph 2. This Affidavit is submitted to the Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 2.390(a)(4) based on the fact that the attached information consists of trade secret(s) of C.D.I. and that the NRC will receive the information from C.D.I. under privilege and in confidence.
The Information sought to be withheld, as transmitted to Nuclear Management LLC as attachment to C.D.I. Letter No. 09121 dated 10 August 2009, C.D.I.
Technical Note No.08-12P "Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Monticello," Revision 3 The Information summarizes:
(a) a process or method, including supporting data and analysis, where prevention of its use by C.D.I.'s competitors without license from C.D.I. constitutes a competitive advantage over other companies; (b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; (c) Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs 3(a), 3(b) and 3(c) above.
1 4. The Information has been held in confidence by C.D.I., its owner. The i Information has consistently been held in confidence by C.D.I. and no public disclosure has been made ahd it is not available to the All disclosures to third parties, which have been limited, have been made pursuant to the terms and conditions contained in C.D.I.'s Nondisclosure Secrecy Agreement which must be hlly executed prior to disclosure.
The Information is a type customarily held in confidence by C.D.I. and there is a rational basis therefore. The Information is a type, which C.D.I. considers trade secret and is held in confidence by C.D.I. because it constitutes a source of competitive advantage in the competition and performance of such work in the industry. Public disclosure of the Information is likely to cause substantial harm to C.D.I.'s competitive position and foreclose or reduce the availability of profit-making opportunities.
I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to be the best of my knowledge, information and belief.
Executed on this )& day of /&, 2009.
Continuum Dynamics, Inc.
Subscribed and sworn before me this day: /O L!iLad a009 Eileen P. Burmeister, Notary Public
- p G kEILEEN P. BURM ISTER NOTARY PUBLIC OF NEW JERSEY MY COMM. EXPIRES MAY 6,2012