Text
s f
,
U.S. NUCLEAR REGULATORY C^ MISSION
REGION III
Report Nos. 50-445/88008(ORS); 50-446/88005(ORS)
Docket Nos. 50-445; 50-446 Licenses No. CPPR-126; CPPR-127 Licensee: Texas Utilities Electric Facility Name: Comanche Peak Steam Electric Station, Units 1 and 2 Inspection At: Comanche Peak Site, Glen Rose, Texas Inspection Conducted: January 19-21, 1988 4 3 1 L k <.n / w Inspector:hK. D. Ward 4 4/#f G
Date
.67(d d e/ M ~
Approved By:
D. H. Danielson, Chief MkW Materials and Processes Section Date Inspection Summary Inspection on January 19-21. 1988 (Reports No. 50-445/88008(ORS):
l No. 50-446/88005(ORS))
Areas Inspected:
Routine, announced safety inspection of preservice inspection (PSI) activities including review of program (73051), procedures (73052), observation of work activities (73053), and data review (73055).
Results: No violations or deviations were identified.
>
i
8802230126 880216 PDR ADOCK 05000445
.
. _ D_C D i
,,
. - - - -
- - - - - -
i
'
i DETAILS
'
,
1.
Persons Contacted Texas Utilities Electric (TV Electric)
- C. Moehlman, Mechanical Equipment Supervisor
- 0. Foken,' PSI Coordinator J. Muffett, Manager of Civil Engineering M. Skaggs, ASME Section XI Coordinator Westinghouse Nuclear Service Division, Inspection Services (W)
!
- R. Moller, Site Manager
- R. Hilterman, PSI Coordinator U.S. Nuclear. Regulatory Commission (NRC)
.
- H. Livermore, Senior Lead Inspector R. Wernick, Assistant Director for Inspection Programs e
Hartford Steam Bofler Engineering and Insurance Company (HSB)
}
J. Elliott, ANII
!
The inspector also contracted and interviewed other licensee and
!
contractor personnel.
'
- Denotes those present at the exit interview.
f
.
2.
Preservice Inspection (PSI), Unit 1
,
,
a.
General Reference: NRC Inspection Report No. 50-445/79028
!
NRC Inspection Report No. 50-445/79030 NRC Inspection Report No. 50-445/82019 Westinghouse Nuclear Service Division preformed the PSI in accordance with ASME Section XI,1980 Edition with no Addenda.
The majority of the PSI was performed between July 1982 and August 1984.
b.
Program and Procedures
'
,
The NRC inspector reviewed the following PSI progran and procedures and found them to be acceptable. Where these rules were determined to be impractical, specific relief was requested in writing.
The NRC inspector reviewed the specific relief requests including the related correspondance between the licensee and the NRC.
,
l
'
. _.
_
_
_-
t i
W. Preservice and Inservice Inspection Documentation, OPS-NSD-101, Revision 5.
W, Preservice and~ Inservice Examination Manual Ultrasonic
Equipment Qualification, NSD-ISI-10,-Revision 4.
W, Visual Examination Procedure, ISI-8, Revision 7.
- W, Liquid Penetrant Examination Procedure, ISI-11, Revision 9.
- W, Ultrasonic Examination of Studs Bolts and Nuts, Revision 6.
- W, Manual Ultrasonic Examination of Circumferential and
Longitudinal Butt Welds in Ferritic Vessels of 2)" Thick and Greater, ISI-47, Revision 2.
W. Magnetic Particle Examinations, ISI-70, Revision 1.
W, Manual Ultrasonic Examination of Full Penetration
Circumferential and Longitudinal Butt Welds, 151-205, Revision 2.
W Manual Ultrasonic Examination of Welds, 151-206, Revision 0,
c.
Review of Data and Certifications of Material, Equipment, and Personnel The NRC inspector reviewed the following documents:
Data reports Reactor pressure vessels NDE records.
- Ultrasonic instruments, calibration blocks, transducers, and
UT couplant certifications.
Magnetic particle equipnent certifications.
- Liquid penetrant material certifications.
- NDE personnel certifications in accordance with SNT-TC-IA for
the following personnel:
!
B. Anderson I
-
-
-
B. Aston II
-
-
-
II J. Busby II II
-
R. Busby I
-
-
-
N. Bollingmo II II II II L. Bowne II II
-
-
i
i
_
.
_
___--_
>
Name Level UT PT VT MT-J. Cannizzo II II I
-
II J. Carson
-
-
-
II J. Conner II
-
-
R. Conway II II II
-
R. Curl II II II
-
III J. Decker III III
-
J. Furr II II II i
-
M. Harcourt I
I I
-
k. Hilterman II II II
~II II J. Kidd
-
-
-
H. Kloster I
I
-
-
L. McClain II II
-
-
R. McClain II II
-
-
J. Mac1ver II II
-
-
P. Michelson II II II
-
T. Moore I
-
-
-
'
II II G. Morini II
-
II II G. Nemeth
-
-
J. Obermeyer I
I
-
-
M. Roberts II II II II
T. Schaefer II II II
-
R. Spivey II II
-
-
'
R. Stanford II
-
-
-
S. Stanford I
I I
-
II
II R. Turocy
-
-
K. Walda II
-
-
-
i M. Williamson I
-
-
-
No violations or deviations were identified.
3.
Preservice Inspection (SI), Unit 2
a.
General
,
Reference:
NRC Inspection Report No. 50-446/87029.
b.
Procedures The NRC inspector reviewed the following PSI procedures and found
-
them to be acceptable.
To date TV Electric has not made a request
!
for relief from the ASME Code for Unit 2.
i W Training, Qualification, and Certification of Personnel in
Nondestructive Examination, QA 2.2, Revision 2 (1975 to 1980
'
EditionofSNT-TC-1A).
W. Certification of Inspection Personnel for Nuclear Power
'
Plants, QA 2.3, Revision 1 (ANSI N45.2.6).
s P-
W, Qualification and Certification of Visual Examination Personnel-for Preservice and Inservice Inspection, QA 2.4, Revision 1.
c.
Review of Data, Audits and Certifications of Equipment, and Personnel The NRC inspector reviewed the following documents:
Data reports.
- Ultrasonic instruments certifications.
- TV Electric QA Audit TCP 87-46 of PSI dated January 11, 1988, and the Hartford Steam Boiler Inspection and Insurance Company audit of PSI No. ANSI N-62601.
- Reactor pressure vessel NDE records.
NDE personnel certifications in accordance with SNT."C-IA for the following personnel:
Name Level UT PT VT MT H. Ackerman I
I I
I R. Cline II II II II C. Kiehl I
I II I
K. Kortokrax II II II II d.
bservation of Work Activities The NRC inspector observed work and had discussions with personnel during the PSI activities. These observations included the performance of the following:
(1) Magnetic particle examination of the following welds in the Feedwater system:
Pipe welds No. 6, No. 10 and No. 16 on ISO No. TCX-2-2204.
(2) Ultrasonic examination of the following pipe welds in the
~
Feedwater system:
No. 13 and No. 16 on ISO No. TCX-2-2407.
- No. 12 on ISO No. TCX-2-2101.
- No. 25 on ISO No. TCX-2-2103.
- No. 6, No. 11 and No. 12 on ISO No. TCX-2-2303.
- No. 6, No. 10 and No. 21 on ISO No. TCX-2-2204.
I
No. 29 and No. 30 on 150 No. TCX-2-2301.
- No. 1 and No. 2 on ISO No. TCX-2-2202.
- No. 5 and No. 6 on 150 No. TCX-2-2403.
No violations or deviations were identified.
-,
.
.
s
4.
Exit Interview The inspector met with site-representative (denoted in Persons Contacted paragraph).at the conclusion of the inspection.
The inspector summarized the scope and findings of the inspection noted in this report. The inspector also discussed the likely informational content of the
._
inspection report with regard to documents or processes reviewed by-the inspector during the inspection. The licensee did not identify any such documents / processes as proprietary, i
,
t L
!
t l
l
?
i
'
l
.
.
i k
. _, -
- - - - -,,
.
-
, --
-. - - -
-
- -. - -. - - - _. - -
-
..
. _. -.__ _ _ _ _ _ _ _ _ _ _ _
s t
50-445/ff-Of; 50-ii:/
-
DISTRIBUTION:
Local PDR OSP Reading CPPD-LA l
CPPD Reading (HQ)
,
- Site Reading File AD for Projects
- Sr. Lead Insp. - CONST.
!
- Concurrence
'
- MIS System, RIV
- RSTS Operator, RIV
DRP, RIV
RIV Docket File
- DWeiss, RM/ALF JTaylor i
SEbneter/JAxelrad
CGrimes
.
PMcKee
'
JLyons Jdilson JMoore, OGC
[
JGilliland, RIV f
FMiraglia
.
EJordan
[
JPartlow
BHayes
- w/766 i
.
t i
l i
!
I i
o\\
\\\\'
.
.
w"
-
-
- -. - - -
,
,,
..--,.,,-.-._,,,,
,---~..g
- - -. -
m
-.----mn--.,+
+
u,-
.
-