Category:INSPECTION REPORT
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970161997-08-13013 August 1997 Insp Repts 50-445/97-16 & 50-446/97-16 on 970722-25.No Violations Noted.Major Areas Inspected:Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures ML20151L9231997-08-0505 August 1997 Insp Repts 50-445/97-15 & 50-446/97-15 on 970608-0719. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149L3361997-07-25025 July 1997 Corected Pages 13,17,19,22,28 & Page 2 of Supplemental Info for Insp Repts 50-445/97-12 & 50-446/97-12 Issued on 970611 IR 05000445/19970141997-06-30030 June 1997 Insp Repts 50-445/97-14 & 50-446/97-14 on 970427-0607. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20148K2851997-06-11011 June 1997 Insp Repts 50-445/97-12 & 50-446/97-12 on 970421-0502. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970061997-06-0606 June 1997 Insp Repts 50-445/97-06 & 50-446/97-06 on 970428-0502. Violations Noted.Major Areas Inspected:Operations & Plant Support & Assessment of Licensed Operator Requalification Program ML20148F8791997-06-0303 June 1997 Insp Repts 50-445/97-09 & 50-446/97-09 on 970317-21. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000445/19970131997-05-21021 May 1997 Insp Repts 50-445/97-13 & 50-446/97-13 on 970428-0502.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19970081997-05-21021 May 1997 Insp Repts 50-445/97-08 & 50-446/97-08 on 970316-0426.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19970011997-05-21021 May 1997 Insp Repts 50-445/97-01 & 50-446/97-01 on 970127-31,0428 & 0502.No Violations Noted.Major Areas Inspected:Licensee self-assessment Effort IR 05000445/19970101997-05-20020 May 1997 Insp Repts 50-445/97-10 & 50-446/97-10 on 970421-25.No Violations Noted.Major Areas Inspected:Plant Support ML20148B5891997-05-0808 May 1997 Insp Repts 50-445/97-11 & 50-446/97-11 on 970407-10.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19970071997-04-16016 April 1997 Insp Repts 50-445/97-07 & 50-446/97-07 on 970324-27.No Violations Noted.Major Areas Inspected:Plant Support 1999-09-14
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970161997-08-13013 August 1997 Insp Repts 50-445/97-16 & 50-446/97-16 on 970722-25.No Violations Noted.Major Areas Inspected:Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures ML20151L9231997-08-0505 August 1997 Insp Repts 50-445/97-15 & 50-446/97-15 on 970608-0719. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149L3361997-07-25025 July 1997 Corected Pages 13,17,19,22,28 & Page 2 of Supplemental Info for Insp Repts 50-445/97-12 & 50-446/97-12 Issued on 970611 IR 05000445/19970141997-06-30030 June 1997 Insp Repts 50-445/97-14 & 50-446/97-14 on 970427-0607. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20148K2851997-06-11011 June 1997 Insp Repts 50-445/97-12 & 50-446/97-12 on 970421-0502. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970061997-06-0606 June 1997 Insp Repts 50-445/97-06 & 50-446/97-06 on 970428-0502. Violations Noted.Major Areas Inspected:Operations & Plant Support & Assessment of Licensed Operator Requalification Program ML20148F8791997-06-0303 June 1997 Insp Repts 50-445/97-09 & 50-446/97-09 on 970317-21. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000445/19970131997-05-21021 May 1997 Insp Repts 50-445/97-13 & 50-446/97-13 on 970428-0502.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19970081997-05-21021 May 1997 Insp Repts 50-445/97-08 & 50-446/97-08 on 970316-0426.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19970011997-05-21021 May 1997 Insp Repts 50-445/97-01 & 50-446/97-01 on 970127-31,0428 & 0502.No Violations Noted.Major Areas Inspected:Licensee self-assessment Effort IR 05000445/19970101997-05-20020 May 1997 Insp Repts 50-445/97-10 & 50-446/97-10 on 970421-25.No Violations Noted.Major Areas Inspected:Plant Support ML20148B5891997-05-0808 May 1997 Insp Repts 50-445/97-11 & 50-446/97-11 on 970407-10.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19970071997-04-16016 April 1997 Insp Repts 50-445/97-07 & 50-446/97-07 on 970324-27.No Violations Noted.Major Areas Inspected:Plant Support 1999-09-14
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970161997-08-13013 August 1997 Insp Repts 50-445/97-16 & 50-446/97-16 on 970722-25.No Violations Noted.Major Areas Inspected:Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures ML20151L9231997-08-0505 August 1997 Insp Repts 50-445/97-15 & 50-446/97-15 on 970608-0719. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149L3361997-07-25025 July 1997 Corected Pages 13,17,19,22,28 & Page 2 of Supplemental Info for Insp Repts 50-445/97-12 & 50-446/97-12 Issued on 970611 IR 05000445/19970141997-06-30030 June 1997 Insp Repts 50-445/97-14 & 50-446/97-14 on 970427-0607. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20148K2851997-06-11011 June 1997 Insp Repts 50-445/97-12 & 50-446/97-12 on 970421-0502. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970061997-06-0606 June 1997 Insp Repts 50-445/97-06 & 50-446/97-06 on 970428-0502. Violations Noted.Major Areas Inspected:Operations & Plant Support & Assessment of Licensed Operator Requalification Program ML20148F8791997-06-0303 June 1997 Insp Repts 50-445/97-09 & 50-446/97-09 on 970317-21. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000445/19970131997-05-21021 May 1997 Insp Repts 50-445/97-13 & 50-446/97-13 on 970428-0502.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19970081997-05-21021 May 1997 Insp Repts 50-445/97-08 & 50-446/97-08 on 970316-0426.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19970011997-05-21021 May 1997 Insp Repts 50-445/97-01 & 50-446/97-01 on 970127-31,0428 & 0502.No Violations Noted.Major Areas Inspected:Licensee self-assessment Effort IR 05000445/19970101997-05-20020 May 1997 Insp Repts 50-445/97-10 & 50-446/97-10 on 970421-25.No Violations Noted.Major Areas Inspected:Plant Support ML20148B5891997-05-0808 May 1997 Insp Repts 50-445/97-11 & 50-446/97-11 on 970407-10.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19970071997-04-16016 April 1997 Insp Repts 50-445/97-07 & 50-446/97-07 on 970324-27.No Violations Noted.Major Areas Inspected:Plant Support 1999-09-14
[Table view] Category:UTILITY
MONTHYEARIR 05000445/19900401990-11-13013 November 1990 Safety Insp Repts 50-445/90-40 & 50-446/90-40.Violations Noted But Not Cited.Major Areas Inspected:Plant Status, Operational Safety Verification,Onsite Followup of Events, Followup on Fastener Testing for Bulletin 87-02 IR 05000445/19900311990-10-10010 October 1990 Insp Repts 50-445/90-31 & 50-446/90-31 on 900808-0918. Violation Noted IR 05000445/19900301990-09-11011 September 1990 Insp Repts 50-445/90-30 & 50-446/90-30 on 900723-0802.No Violations or Deviations Noted.Major Areas Inspected: Security Program Audits,Protected & Vital Area Physical Barriers,Detection & Assessment Aids & Access Control IR 05000445/19900291990-08-30030 August 1990 Insp Repts 50-445/90-29 & 50-446/90-29 on 900723-27.No Violations Noted.Major Areas Inspected:Licensee Water Chemistry & Radiochemistry Programs IR 05000445/19900281990-08-29029 August 1990 Insp Repts 50-445/90-28 & 50-446/90-28 on 900716-20.No Violations Noted.Major Areas Inspected:Licensee Radioactive Matl Transportation & Solid Radwaste Programs IR 05000445/19900341990-08-27027 August 1990 Insp Repts 50-445/90-34 & 50-446/90-34 on 900731-0807. Violation Noted.Major Areas inspected:900730 Main Steam Line Low Pressure Safety Injection Event,Including Actions Taken Prior To,During & Subsequent to Event IR 05000445/19900321990-08-0707 August 1990 Advises That NRC Insp 50-445/90-32 & 50-446/90-32 Canceled.No Insp Rept Will Be Issued for Rept Number ML20058M2501990-08-0303 August 1990 Insp Repts 50-445/90-22 & 50-446/90-22 on 900606-0703. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Startup Test Results Review, QA for Startup Test & Onsite Followup of Events IR 05000445/19900161990-08-0202 August 1990 Insp Repts 50-445/90-16 & 50-446/90-16 on 900423-27.No Violations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program Including Implementing Procedures,Changes to Emergency Facilities & Equipment IR 05000445/19900211990-07-25025 July 1990 Notifies That NRC Insps 50-445/90-21 & 50-446/90-21 Have Been Cancelled IR 05000445/19900251990-07-24024 July 1990 Cancels Insp Repts 50-445/90-25 & 50-446/90-25 IR 05000445/19900231990-07-13013 July 1990 Insp Repts 50-445/90-23 & 50-446/90-23 on 900618-22.No Violations or Deviations Noted.Major Areas Inspected: Radiological Environ Monitoring Program,Including Organization & Mgt Controls,Training & Qualifications IR 05000445/19900241990-07-11011 July 1990 Insp Repts 50-445/90-24 & 50-446/90-24 on 900618-22 & 25-28. No Violations or Deviations Noted.Major Areas Inspected:Self Assessment Capability IR 05000445/19890641989-09-26026 September 1989 Safety Insp Repts 50-445/89-64 & 50-446/89-64 on 890802- 0905.Violation & Deviation Noted.Major Areas Inspected: Actions on Previous Insp Findings,Followup on Violations/ Deviations & Action on 10CFR50.55(e) Deficiencies IR 05000445/19890661989-09-26026 September 1989 Safety Insp Repts 50-445/89-66 & 50-446/89-66 on 890802- 0905.Violations Noted.Major Areas Inspected:Followup on Violations/Deviations,Applicant Action on 10CFR50.55 (E) Const Deficiencies & General Plant Area Tours IR 05000445/19890631989-09-26026 September 1989 Insp Repts 50-445/89-63 & 50-446/89-63 on 890802-0905.No Violations or Deviations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Action on 10CFR50.55(e) Deficiencies & Assessement of Allegations IR 05000445/19890591989-09-25025 September 1989 Insp Repts 50-445/89-59 & 50-446/89-59 on 890814-25. Weaknesses,Strengths & Unresolved Item Noted.Major Areas Inspected:Emergency Response Guidelines (Erg),Including Review of ERG Training Program & Engineering Activities IR 05000445/19890651989-09-22022 September 1989 Safety Insp Repts 50-445/89-65 & 50-446/89-65 on 890802- 0905.Violation Noted.Major Areas Inspected:Applicant Actions on Previous Insp Findings,Followup on Violations/Deviations & Action on 10CFR50.55(e) Deficiencies IR 05000445/19890611989-09-14014 September 1989 Insp Repts 50-445/89-61 & 50-446/89-61 on 890724-0804.No Violations or Deviations Noted.Major Areas Inspected:Final Reconciliation Process to Assure That Pending Open Items Addressed within Corrective Action Repts IR 05000445/19890681989-09-13013 September 1989 Partially Withheld Insp Repts 50-445/89-68 & 50-446/89-68 on 890814-18 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Assessment Aids,Detection Aids,Physical Barriers & Personnel Training IR 05000445/19890571989-08-25025 August 1989 Insp Repts 50-445/89-57 & 50-446/89-57 on 890717-28. Violations Noted.Major Areas Inspected:Controls & Implementation of Operations & Maint Procedure for Unit 1 IR 05000445/19890581989-08-25025 August 1989 Insp Repts 50-445/89-58 & 50-446/89-58 on 890724-28.No Violations & Deviations Noted.Major Areas Inspected: Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000445/19890501989-08-25025 August 1989 Insp Repts 50-445/89-50 & 50-446/89-50 on 890717-21.No Violations Noted.Major Areas Inspected:Radiation Protection Program,Organization & Mgt Controls,External & Internal Exposure Controls & Training & Qualification Controls IR 05000445/19890541989-08-24024 August 1989 Resident Safety Insp Repts 50-445/89-54 & 50-446/89-54 on 890706-0801.No Violations,Deviations,Open Items,Unresolved Items,Strengths or Weaknesses Noted.Major Areas Inspected: Util Action on Previous Insp Findings & Plant Tours IR 05000445/19890621989-08-24024 August 1989 Partially Withheld Insp Repts 50-445/89-62 & 50-446/89-62 on 890731-0804 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program, Including Security Program Audits & Testing & Maint IR 05000445/19890381989-08-17017 August 1989 Insp Repts 50-445/89-38 & 50-446/89-38 on 890717-27. Violations Noted.Major Areas Inspected:Preservice Insp Activities,Licensee Disposition of Reported Deficiencies & Licensee Erosion/Corrosion Program IR 05000445/19890521989-08-17017 August 1989 Resident Safety Insp Repts 50-445/89-52 & 50-446/89-52 on 890706-0801.No Violations Noted.Major Areas Inspected:Util Action on Previous Insp Findings,Followup on Violations/ Deviations & safety-related Mechanical Components IR 05000445/19890551989-08-17017 August 1989 Resident Safety Insp Repts 50-445/89-55 & 50-446/89-55 on 890706-0801.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Retest Procedure Review, Preoperational Test Witnessing,Plant Tours & Plant Maint IR 05000445/19890561989-08-15015 August 1989 Partially Withheld Preoperational Insp Repts 50-445/89-56 & 50-446/89-26 on 890710-14 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Applicant Physical Security Program,Including Protected Area Physical Barriers IR 05000445/19890431989-08-15015 August 1989 Emergency Preparedness Program Appraisal Insp Repts 50-445/89-43 & 50-446/89-43. Outstanding Items Noted.Major Areas Appraised:Emergency Organization,Training & Equipment & Procedures Which Implement Emergency Plan IR 05000445/19890531989-08-14014 August 1989 Insp Repts 50-445/89-53 & 50-446/89-53 on 890706-0801.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Insp Findings,Followup on Violations/Deviations & post-const Hardware Validation Program IR 05000445/19890511989-08-0404 August 1989 Insp Repts 50-445/89-51 & 50-446/89-51 on 890706-0801.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Followup on Violations/Deviations & Assessment of Allegations IR 05000445/19890491989-07-21021 July 1989 Insp Repts 50-445/89-49 & 50-446/89-49 on 890607-0705.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Followup on Violations/Deviations & Corrective Action Program IR 05000445/19890451989-07-21021 July 1989 Insp Repts 50-445/89-45 & 50-446/89-45 on 890607-0705.No Violations or Deviations Noted.Major Areas Inspected: Preoperational Retest Procedure Review,Preoperational Test Witnessing,Plant Tours & Operational Staffing IR 05000445/19890471989-07-20020 July 1989 Insp Repts 50-445/89-47 & 50-446/89-47 on 890607-0705.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Followup on Violations/Deviations & General Plant Areas IR 05000445/19890481989-07-19019 July 1989 Resident Safety Insp Repts 50-445/89-48 & 50-446/89-48 on 890607-0705.No Strengths or Weaknesses Noted.Major Areas Inspected:Util Action on Previous Insp Findings & Action on self-identified 10CFR50.55(e) Deficiencies IR 05000445/19890461989-07-19019 July 1989 Insp Repts 50-445/89-46 & 50-446/89-46 on 890607-0705.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Plant Procedures for Operations & Applicant Meetings IR 05000445/19890391989-07-17017 July 1989 Insp Repts 50-445/89-39 & 50-446/89-39 on 890626-0706.No Violations or Deviations Noted.Major Areas Inspected: Containment Integrated Leak Rate Test IR 05000445/19890421989-07-17017 July 1989 Insp Repts 50-445/89-42 & 50-446/89-42 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Programs Organization & Mgt Controls, Training & Qualifications & External Exposure Controls IR 05000445/19890441989-07-12012 July 1989 Insp Repts 50-445/89-44 & 50-446/89-44 on 890607-0705.No Violations or Deviations Noted.Major Areas Inspected: Applicant Action on Previous Findings,Followup on Violations,Applicant Action 50.55 & Deficiencies IR 05000445/19890301989-07-0707 July 1989 Augmented Insp Team Insp Repts 50-445/89-30 & 50-446/89-30 on 890515-0616.Weaknesses Noted.Major Areas Inspected:Check Valve Failures Which Allowed Backflow Through Auxiliary Feedwater Sys During Hot Functional Testing of Unit 1 IR 05000445/19890371989-06-30030 June 1989 Insp Repts 50-445/89-37 & 50-446/89-37 on 890503-0606. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Action on 10CFR50.55(e) Deficiencies, Followup on NRC Bulletins & SER Verification IR 05000445/19890361989-06-27027 June 1989 Insp Repts 50-445/89-36 & 50-446/89-36 on 890503-0606.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Followup on Review of 10CFR50.55(e) Deficiencies & NRC Bulletins IR 05000445/19890411989-06-22022 June 1989 Partially Withheld Insp Repts 50-445/89-41 & 50-446/89-41 on 890605-09 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program, Including Protected Area Barriers & Testing & Maint IR 05000445/19890331989-06-19019 June 1989 Insp Repts 50-445/89-33 & 50-446/89-33 on 890503-0606.No Violations or Deviations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Action on 10CFR50.55(e) Deficiencies by Applicant & General Plant Tours ML20245D9941989-06-19019 June 1989 Insp Repts 50-445/89-35 & 50-446/89-35 on 890503-0606. Violations Noted.Major Areas Inspected:Applicant Actions on Previous Insp Findings,Followup on Violations,Applicant Action on NRC Bulletins & Fuel Storage Racks ML20245E0761989-06-19019 June 1989 Insp Repts 50-445/89-32 & 50-446/89-32 on 890503-0606. Violations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Followup on Violations/Deviations,Action on 10CFR50.55(e) Deficiencies & Preoperational Testing Audits IR 05000445/19890291989-05-30030 May 1989 Insp Repts 50-445/89-29 & 50-446/89-29 on 890502-04.No Violations or Deviations Noted.Major Areas Inspected:Unit 1 Solid,Liquid & Gaseous Radwaste Sys,Radioactive Matl Transportation Program & Radwaste Mgt Program IR 05000445/19890221989-05-22022 May 1989 Insp Repts 50-445/89-22 & 50-446/89-22 on 890405-0502.No Violations or Deviations Noted.Major Areas Inspected: Applicants Action on Previous Insp Findings,Followup on Violations/Deviations & Followup on Bulletins IR 05000445/19890241989-05-18018 May 1989 Insp Repts 50-445/89-24 & 50-446/89-24 on 890405-0502. Violations Noted.Major Areas Inspected:Followup on Violation/Deviation,Action on 10CFR50.55(e) Deficiencies,Nrc Bulletins,Preoperational Test Program & TMI Action Items 1990-09-11
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19993011999-07-16016 July 1999 Exam Repts 50-445/99-301 & 50-446/99-301 on 990618-24.Exam Results:Six Applicants for Senior Operator Licenses Passed Exams IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam ML20236G9321998-07-0202 July 1998 Notice of Violation from Insp on 980329-0509.Violation Noted:Four Examples Were Identified,Where Licensee Failed to Meet Requirement for Design of ECCS Switchover from Refueling Water Storage Tank to Containment Recirculation IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217F6051998-04-24024 April 1998 Notice of Violation from Insp on 980215-0328.Violations Noted:Corrective Actions Were Not Sufficient to Identify That Excessive Leakage in ECC Sys Check Valves During Unit 1 Cycle 6 Required Unit 1 Safety Injection Pumps Be Started ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20248L8831998-03-19019 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Licensee Failed to Document Heat Related Degredation of Unit 2,Train B Solid State Safeguards Sequencer IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 07100012/20110221998-01-16016 January 1998 Notice of Violation from Insp on 971012-1122.Violation Noted:Procedure IPO-005B,rev 2,not Appropriate to Circumstances in That Procedure Did Not Require Pressure Be Maintained Below Rc System Pressure & Temp Limits ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198R6571998-01-16016 January 1998 Notice of Violation from Insp on 970922-25.Violation Noted: on 961029,licensee Made Changes to Emergency Plan,W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20198N2071998-01-14014 January 1998 Notice of Violation from Insp on 970608-0719 & Subsequent Inoffice Reviews Concluded on 971114.Violation Noted: Procedures OPT-102A & 102B Did Not Include Appropriate Quantitative Acceptance Criteria ML20199H0131997-11-21021 November 1997 Notice of Violation from Insp on 970831-1011.Violation Noted:Thermometer IC1473,was Used During Performance of Procedure PPT-SX-7505A on 970807 ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-IV-97-067, on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee1997-11-17017 November 1997 PNO-IV-97-067:on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee PNO-IV-97-066, on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed1997-11-17017 November 1997 PNO-IV-97-066:on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle PNO-IV-97-061, on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed1997-10-30030 October 1997 PNO-IV-97-061:on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20211A0691997-09-19019 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970507,while Performing Procedure OPT-457B,licensed Operator Failed to Close Valve 2-8812A Per Step 8.8 ML20198G1821997-09-12012 September 1997 Notice of Violation from Investigation on 970606.Violation Noted:Mn Shook Submitted Falsified Info to NRC Re Being Denied Access to Nuclear Power Plant as Result of fitness-for-duty Policy 1999-09-14
[Table view] |
Text
{{#Wiki_filter:. . _ _ _ _ _ _ _ _ _ _
.
.
.
. .. .
.
.
., . .. .
..
. .
-
-t
-
.
,
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF SPECIAL PROJECTS NRC Inspection Report: 50-445/88-45 Permits: CPPR-126
-
50-446/88-41 CPPR-127 Dockets: 50-445 Category: A2 50-446-Construction Permit Expiration Dates:
Unit 1: August 1, 1988 Unit 2: Extension request submitte Applicant: TU Electric Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Facility Name Comanche Peak Steam Electric Station (CPSES),
Units 1 & 2 Inspection At: Comanche Peak Site, Glen Rose, Texas Inspection conducted: June 8 through July 6, 1988 Inspector: (Ad64 A P. C. Wagner,\ Reactor Inspector 7/13/96 Date Consultant: J. Taylor, (paragraphs 6 and 7)
Reviewed by: N# s' '7 -/Y- W H. H. Livermore, Lead Senior Inspector Date hbh kDbbk h>5bObk45 Q PDC
- - - _ _ _ _ _ _ _ - _ _ - _ - _ _ _
_ _ . .
,.
, . .
.
[V . .
2 ,
Inspection' Summary:
'
Inspection Conducted:-June 8 through July 6 1988 (Report 50-445/88-45; 50-445/88-41)
Areas! Inspected: Unannounced, resident safety inspection of applicant's actions on previous inspection findings, follow-up on violations / deviations, follow-up on 50.55(e) reports, follow-up on allegaticas, the Corrective Action Program (CAP), and' general plant (tours).
Results: Within the areas inspected, no significant strengths or weaknesses were noted. During the inspection, no significant safety matters, violations, deviations, or unresolved items were identifie .
I-
, , . .-- . .
'
.
. -
c . .
I DETAILS l . Persons ~ConJacted
*R. P. Baker, Licensing Compliance Manager, TU Electric
* L. Barker, Manager, Engineering. Assurance, TU Electric
*M. R. Blevins, Manager, Technical Support, TU Electric
- *J.- Conly, APE-Licensing, Stone and Webster Engineering Corporation (SWEC)
*W. G. Counsil, Executive Vice President, TU Electric
*G. G. Davis, Nuclear Operations Inspection Report Item Coordinator, TU Electric
*D. E. Deviney, Deputy. Director, QA, TU Electric
*W.-G..Guldemond, Executive Assistant, TU Electric
*P. E. Halstead, Manager, Quality Control (QC), TU Electric
*T. L. Heatherly, Licensing Compliance Engineer, TU Electric
*R. T. Jenkins, Manager, Mechanical Engineering, TU Electric
*S. D. Karpyak, CPRT, TU Electric
*J. J. Kelley, Manager, Plant Operations, TU Electric
* O . .W . Lowe, Director:of Engineering, TU Electric
* W. Maffett, Manager of Civil Engineering, TU Electric
* M.' Reynerson, Director of Construction, TU Electric
* J..Riggs, Plant Evaluation Manager, Operations, TU Electric
* E. Scott, Manager, Startup, TU Electric
* C. Smith, Plant Operations Staff, TU Electric
* L. Stamm, Project Engineering Manager, SWEC
* B. Stevens, Manager, Electrical Engineering, TU Electric
* L. Terry, Unit 1 Project Manager, TU Electric
* R. Waters,' Licensing Compliance Engineer, TU Electric
* E. Watters, QA Program Manager, SWEC The NRC inspectors also interviewed other applicant employees
.during this inspection' perio '* Denotes personnel present at the July 6, 1988, exit meetin . Applicant's Action on Previous Inspection Findings (92701) (Closed) Open Item (445/8511-0-25): Incomplete cablo routing information. During a NRC witnessed third-party inspection of CPRT Verification Package I-E-CABLO45, the ERC inspector noted that a through-wall-conduit-sleeve (TWS) was not listed on the cable routing schedul Review by the NRC inspector disclosed proper processing of a CPRT deviation report (DR) and project nonconformance report (NCR). NCR CE 87-6885 had been dispositioned to add the TWS to the cable routing schedul Project effort is underway to properly identify and physically label all of the TWSs.
L
'
.
.. .
.. .
Since the listing of the TWS on the routing schedule has B no impact on the safety function of the cable and since the applicant has implemented a program to correct problems with the conduit sleeves (see NRC Inspection Report 50-445/87-23; 50-446/87-17), the NRC inspector considers this item close b. (Closed) en Item (445/8511-0-31): Damaged electrical s"
cable jac... During a NRC witnessed CPRT inspection of Verification Package I-E-CABLO40, the ERC inspector identified a cut in the outer jacket of Cable EO12294 The NRC inspector verified that the DR and NCR were initiated for the problem. NCR E85-101048 has been
. dispositioned to repair the cable with an approved heat shrinkable insulation sleev Since the cable jacket provides cable protection during installation and is not required for insulation purposes and since the damage will be repaired, the NRC inspector considers this item to be close c. (Open) Open Item (445/8513-0-23): Improper conduit installation. During a NRC witnessed inspection of CPRT Verification package I-E-CDUT027, the ERC inspector identified four problems associated with Emergency Lighting System Conduit ESB6-5. The NRC inspector verified that a DR and NCR were written for the observed l_ conditions. NRC review of NCR CE87-10192, which was L
dispositioned on October 10, 1987, disclosed the l following:
(1) The flexible conduit connector does not require a bushing; therefore, this deviation is not a
- nonconforming condition, l
i (2) the loose three-piece union was to be ti9.tened, ind
!
(3) and (4) no separation was required for lighting system conduits.
l The NRC inspector found the' disposition of items (1) and l (2) to be acceptable but questioned items (3) and (4).
The deletion of separation requirements for lighting conduits by Design Change Authorization (DCA) 42335 was reconsidered by the applicant following a meeting with the NRC staff on March 16 and 17, 1988.
l
. The applicant agreed to handle the separation of lighting L system conduits as they would other low-voltage power i system conduits. Subsequently, the applicant issued
! Revision 7 to DCA 69730 dated May 19, 1988, which l
l
- _ _ - - _ _ _ _ . __
a ..
. .
*
g .
incorporated this change into the Electrical Erection Specification, ES10 The NRC inspector reviewed the applicable pages of
', DCA 69730-(pages 54 and 202 thru 205) to verify that the changes had been incorporated and to evaluate the basis and backfit' requirements. The DCA indicated that
"PCHV-FVM-088 shall be changed to cover this change."
j The~NRC inspector questioned the adequacy of relying on a future walkdown.to identify separation problems already j
documente The inspector was informed, by applicant
- personnel, that the specific NCR would be revised and l that a re.lew would be conaucted for similar instances.
'
If other instances are detected, the applicant agreed to check the adequacy of the Post Construction Hardware
' Validation Program (PCHVP).by verifying that, for those areas already walked-down, that the noted problems were
. identified.
I This issue. remains open pending completion of the applicant's check (Closed) Open Item (445/8513-0-38): Flexible hose anti-torque indicators misaligned. During a NRC inspection of CPRT Verification Package I-E-ININ005 for Level Switch lLS4795, the flexible instrumentation hose was observed to have misaligned anti-torque indicator (The purpose of the indicators, which consist of an etched line on each end of the flexible hose, is to provide the installer an indication that the hose is not cwisted.) The NRC inspector noted that the required CPRT DR and project NCR had been writte NRC inspector review of the closed NCR (CI87-8072X)
disclosed a use-as-is disposition with an engineering justification that the alignment of the anti-torque indicators is no longer an inspection attribute. While the.NRC inspector found this engineering justification to lack an acceptable basis, he had earlier reviewed the revision to the flexible hose installation requirements (see NRC Inspection Report 50-445/88-09; 50-446/88-07)
and found them acceptabl In addition, the NRC inspector reinspected the installation in question and determined that it meets the revised installation requirement Therefore, this item is closed, (Closed) Open Item (445/8514-0-03): Cable routing not per schedule. During a NRC witnessed inspection of CPRT Verification Package I-E-CABL-037, the ERC inspector identified two problems with the routing of Cable EGll3538. The NRC inspector verified that the conditions i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _
.
. .
.
V, -
'"
were documented on both a DR and a N' NCR CE87-6884 was dispositioned use-as-is becaase the routing would not result in.a condition adverse to safety. The NRC inspector agreed with the above determination and verified-that the cable routing schedule was revised to reflect the actual cable route. Therefore, this item is close (Closed) Open Item (445/8514-0-04): Cable not routed per schedule. During a NRC witnessed inspection of CPRT Verification Package I-E-CABL-084, the ERC inspector
~
identified a deviation in the cable route from that sh-on the raceway schedule. The NRC inspector verified that a DR and NCR were initiated and reviewed the NCR disposition. Since NCR CE87-4778 was dispositioned to correct the raceway schedule, the NRC inspector considers this item closed, (Closed) Open Item-(445/8514-0-13): Slope of inctrument tubing and location of the instrument not in accordance with drawings. During the inspection of CPRT Verification Package I-E-ININ-072, the NRC inspector identified the above problems. The tubing was found to have a slope of 1/2" over a 9" length (or_2/3" per foot)
while the then existing requirement war 1" per foot of ru This requirement was revised in Specification CPES-I-1018, to be 1/2" per foot; therefore,.the noted condition meets present requirements. The other problem was the instrument (lPIS4251) was found to be located 5'
from the auxiliary building wall versus 6' as shown on the applicable drawing. The NRC inspector observed no
,
problem with the location and noted that if it were located an-additional foot from the wall, that it would obstruct the passageway. In addition, there were no other instruments in the vicinity which would cause a usage or identification proble Therefore, the NRC inspector determined that the original issues are not significant problems and that this open item can be closed.
! (Closed) Unresolved Item (445/8604-U-06; 446/8603-U-06):
Adequacy of equipment qualification (EQ) reviews related
'
to the Bunker Ramo Corporation (BRC) electrical
, penetration assemblies (EPAs). The NRC inspector
! identified inconsistencies in the EQ records for the EPAs and wrote the above unresolved item pending further revie Subsequently, the applicant committed to, and implemented the replacement of the BRC EPAs with a different desig The inspector documented the replacement program in a number of inspectJ n reports; see paragraph 2.p of 50-445/87-16, 50-446/8/-1 ^
.
L I
,
o, .
.
,
Therefore, the adequacy of the EQ records for the original EPAs is a moot poin In addition, the applicant has implemented a program to ensure that proper EQ records exist for all applicable equipment. The details of this program are presented in the EQ Project Status Report (PSR) which was submitted to the NRC by' letter dated January 8, 1988. NRC ovaluation of the; applicant's program is continuing and will be documented separatel N On the basis of the replacement of the equipmentsi_n question and a program to address the generic conc 6rnys ~s the inspector considers this item resolve 'x
- (Closed) Open Item (445/8730-0-04; 446/8722-0-04):
Revised electrical separation requirements. The NRC inspector questioned the acceptability of revisions to the electrical separation criteria implemented by the applicant in Revision 3 to the Electrical Erection Specification ES-100. The revisions deleted the requirements for lighting system conduits and allowed the
~
use of protective wrap (silicon dioxide) as being equivalent to the protection of a condui Recent NRC inspector review determined that the use of the protective wrap has been proposed as a part of Amendment 65 to the FSAR; as such, the technical staff will evaluate the acceptability of this change as part of the FSAR review. The inspector also determined that DCA 69730, Revision 7 dated May 19, 1988, to Revision 7 of ES-100 revised the separation requirements for the lighting system conduits and cables to be the same as those-for any other non-Class 1E, low-power system (see paragraph 2.c, above). Therefore, the inspector's questions are resolved and this item is close . Follow-up on Violations / Deviations (92702)
y (closed) Violation (445/8604-V-04; 446/8603-V-04):
- Equipment qualification adequacy of specified field rework of cable splice The applicant was unable to demonstrate that the rework which the vendor (BRC)
i stipulated would have produced a qualified splice.
l However, rework of the vendor installed splice was never implemented.
!_ As discussed in paragraph 2. above, the EPAs on which these splices were installed have been replaced. The l replacement EPAs are of a different design and do not
! incorporate the pigtail extension splices which were determined to be not qualified on the BRC EPA em u
--
gx: -
'F Mk .}
'
, ,
, u su - <
,
. 3 1 <=
lg; - ,
*
i < . 8- >
.
l-;',
f [[ s , since:the:EPAs were replaced.And a program.is bein implemented to ensure;all applicable equipment is.
. . .
1 properly. qualified,tthe inspector determinei that:this
.
< violation can be closed.- -
#
'In addition,.this. violation was also designated as- -
<
'
Item-I.B.6;in NRQ Report EA 86-09. This item-issalso X_ ,
' closed.-
(Closed): Violation (445/8604-V-07;. 446/8603-V-07):
'
b .'
' Adequacy of-the~ receiving inspection reports (RIRs) fo .various BRC.EPAs. The NRC inspector identified a number
:r of. problems.with the RIRs fo; some BRC EPAs. As stated
.- .above,.however,.the BRC EPAs have been replaced with a
. 'different vendor's EPA ' ' In addition, the. applicant implemented, improvements to m -the receiving inspection process and evaluated additional components as part of the third-party revie The results'of the-third-party program were presented in the Issue-Specific Action Plan (ISAP) VII.'a.9, "Adequacy of Purchased and Safety-Related Material and Equipment" Results Report. This report was submitted to.the NRC by letter dated February 29, 1988. The NRC evaluation of L .the report will be. documented in separate correspondence.
), Based on -the replacement of the EPAs in question and the applicant's program, the inspector considers-this violation to be close In addition, this violation was also designated as Item I.B.3 in NRC Report EA 86-09. This item is close c' . (closed) Deviation (445/8604-D10; 446/8603-D10):. Failure-to submit analysis. The applicant had not submitted an
'.,
> analysis of the4 acceptability of electrical cable splices
*
in raceways as required by their commitment to Regulatory-Guide (RG)-1.75, Revision 1.- Subsequent to the NRC inspection which pointed out this deviation'of their
^
commitment, the applicant submitted an analysis as part-of the FSAR (new Appendix 8A). The submittal of the analysis fulfills the RG commitment. This deviation is close '
The NRC-technical staff's review of the FSAR change (Amendment 60, dated November 3, 1986) will be documented
,
in< separate correspondenc In addition, this deviation was designated as Item I.B.l'.d in NRC Report EA 86-09. This item is
< close _ _
I]
-
1'
.
_._________m__-._-m
- __
W
, . .
, .
,
~
9 Action on 10 CFR Part 50.55(e) Deficiencies Identified by the Applicant (92700)
f (Open) SDAR CP85-39: Equipment / conduit interfac The applicant reported deficiencies involving conduits not installed in accordance with design documents on
,
September 18, 1985. By Letter TXX-98035 dated
-
January 11, 1988, the applicant provided additional information on the deficienc Based on a self-initiated evaluation, the applicant determined that the conduit interface concerns encompassed three issues:
(1) Cable slack adequacy (2) Conduit-to-equipment interfaces (3) Conduit orientation The applicant stated in TXX-88035 that issue (3) was not reportable as. discussed in TXX-6521 dated June 19, 198 A_ review of TXX-6521, however, provided no basis for that determination. Therefore, issue (3) remains open pending further NRC evaluatio Issue (1) was the subject of a meeting between the involved NRC and applicant personnel on June 21, 1988, and will be discussed in separate correspondenc Issue (2) was discussed in TXX-88035 in detail. The applicant's evaluation consisted of configuration walkdowns involving 516 pieces of equipment. A total of 112 components did not conform to design documents and 11 were found to be unacceptable. Of these 11, 2 were 480V power centers-requiring further seismic analyses, 4 were motor control centers (MCCs) with damage to structural members and 5 were lighting system panel Therefore, issue (2) also remains open pending NRC evaluation of the repair to the MCC structural members and the completion of the seismic analyse (The lighting panels have been downgraded t6 nonsafety related status.) (closed) SDAR CP87-06: Seismic qualification of as-built 480 volt power centers. The applicant informed the NRC of a potentially reportable deficiency concerning the routing of power cables to power center transformer The vendor (Westinghouse) seismic qualification was performed assuming bottom entry of the power cables whereas some installations have top enclosure entry. The applicant, therefore, had a new seismic analysis performed utilizing the as-built configuratio The
.results of this (finite element) analysis showed that the stresses, locally and globally, comply with the AISL manuals of steel construction limits.
t
.
,
'
..
. . .
,
.
'6:
R
,
-The above analysis results were in agreement with preliminary vendor evaluation discussed in their letters dated July 17 and August 17, 198 On the basis of the results of the reanalyses performed using as-built configurations, the NRC inspector
, considers this SDAR to be close . Allegation Follow-up (99014)
In order to ensure that some older allegations had been fully considered and completely addressed, the staff requested that TU Electric provide an assessment of some open items from previously discussed allegations. The response to NRC's January 21, 1988, request was provided by TU Electric Letter TXX-88-294 dated March 25, 1988. The following two allegations.and the TU Electric assessments of them were evaluated by the NRC' inspector: (Closed) Allegation (OSP 84-A-0016): Electrical cable terminations. The staff identified two open issues in the January 21, 1988, letter for the applicant te assess:
"(1) Reconcile differences between Specification 2323-ES-17B and the vendor's informatio "(2) Assure that the concerns raised by Allegation AE-57 are addressed by actions taken in response to the concerns stated in Item 5 (first bullet) on page J30 of SSER-7."
.The applicant assessed these cpen issues and determined that the differences had been reconciled and that the l present requirements were in agreement with vendor
- information. Therefore, no corrective actions were
'
require The applicant's assessment of the second issue which deals with the acceptability of electrical butt splic s also concluded that no further corrective actions were _equired, but referenced the NRC approval of the use l of the splices and the CPRT program related to the
! further qualification of these splices.
N
! N s_ '
The NRC acceptance of the butt splices was documented in
' ~ NRC letter dated September 14, 198 The NRC inspection l
'
of the CPRT program implementation was documented in NRC Inspection Report 50-445/86-07; 50-446/86-05. The l
Unresolved Item from that report was closed in NRC
'
Inspection Report 50-445/88-38; 50-446/88-32.
I Based on the above, the NRC inspector agrees that no l further corrective actions are needed and that this allegation can be closed.
l l
-9 e a y
n - -
'
11- :(Parti'al Closure) Allegation (OSP 84-A-0022): The portion.of this allegation related to the Emergency Diesel Generator (EDG) Wattmeters and varmeters. In addition to some other pending issues, there were two open issues identified in the staff's letter related to the above meters; these were:
"(1) Provide adequate design controls to. properly certify the EDG wattmeters and varmeter ,
"(2) Establish the equipment qualification status of the wattmeters for Unit 1."
The applicant's assessment of these open issues determined that: (1) adequate requirements have been established to ensure that design controls are in place to utilize commercial grade items as allowed by regulatory requirements, and (2) that procurement requirements will ensure that any future procurements of Class 1E electrical meters will be in accordance with a quality Code A for the nuclear grade assigned. In
_
addition,~ the applicant committed to replacing the noncertified wattmeters in Unit 1 with the certified Unit 2 wattmeters prior to hot functional testing of Unit-1 and to procure new Class 1E qualified wattmeters for Unit Based on the NRC inspector's review of the applicant's assessment, the requirements now in place will provide adequate assurance of proper procurement of future Class lE meters. The inspector, therefore, finds that L
this allegation can be closed provided the Unit 1 meters
- are properly replaced. The replacement of the Unit 1 meters is an open item (445/8845-0-01).
l
L Corrective Action Plan (CAP)
The NRC inspector continued to evaluate implementation of the PCHVP by accompanying SWEC engineers during performance of various Field Verification Methods procedures (FVMs) and by review and walkdown of activities previously completed by these walkdown engineers. Follow-up on previously reported items and additional inspections were performed as detailed below: Electrical Components (51053 and 51063)
A follow-up of previously reported minor problems with Packages 88-El-135-CP1-ECPRCB02 and -11 was made. For CB-11, DCA 75038, Revision 0 was provided to add the missing Servicair barrier to the "as-built" drawings; for CB-02, SWEC determined that the unlisted Servicair
. _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _
e-
.
., .
*
6 i
barrier found by the NRC inspector had been noted, but it had "typo" errors in the cable designator and destination device.. These were corrected in the packag The NRC inspector observed cable pulling of 8kV power cables from the startup transformer,. 1ST to the 6.9kv
,
switchgea The cable pulling procedure was available at the scene, ES-100 specification was available at the foreman's office, adequate manpower was available, and particular care was taken to prevent cable damage at bend A departure from ES-100 using white "Ty-wraps" outside'instead of black had already been addressed by the craft and a DCA to allow the change was being processed. The cables are non- Additionally, on a plant tour, the inspector inquired into work being done on a non-Q cable tray, 14KSDN7 Inspection of the available package, Traveler l- ECE007088904 revealed the tray was being removed for cable repair (Cable NK1268794, NQNR U1-88-00010). The NRC inspector determined that the documentation was in order and the jobsteps were being properly followed.
I The inspector accompanied SWEC engineers on walkdowns for l Procedure CPE-SWEC-FVM-EE-064, Revision 2, "Heat Shrinkable Sleeve Installations." Packages were provided for each cable terminating at a particular piece of i
equipment and included 53 cables at MCC-XEB-2 and 2 cables at CP1-ELDPEC-08. The SWEC engineer recorded the results of the inspections on package covers for later transfer to FVM attachment sheets and NCRs. The NRC inspector, additionally, walked down SWEC previously completed packages for Panels cpl-ECDPEC-11 and t CPK-ECPRTC-04A. No violations or deviations were identifie The NRC inspector also walked down FVM-088 packages for electrical separation for Panels CP1-EPBCND-02 and CP1-ELDPEC-04. No violations or deviations were identifie The inspect'r accompanied SWEC engineers on walkdowns of FVM-89 for Sork Panel CP1-ECPRCR-13 and for flexible conduit installations included in Packages 89-E5-121, 89-ES-119, 89-E5-151B, and 89-E5-152. SWEC personnel were kneyledgeable and thorough on FVM implementatio )~
The NRC 1Rspector noted that several SWEC engineers had oeen borro4qd from the mechanical discipline to perform these walkdohns. Discussions indicated they had been adequately tra'13 ed for the task, but a follow-up check of training recordsswill be performe N
's
\
. . . . . . _ _ _ o > -
-
w .,
-The NRC inspector also accompanied SWEC engineers on walkdowns of four cable trays included in FVM-89 for as-built' cable grips. Packages are based on construction operational travelers and the number of grips indicated in a tray and the number of cables in a bundle did not always match the documentation. All discrepancies were adequately noted for later transfer to NCRs. Further NRC inspection of the processing of the FVM results will be performed in later inspections. No violations or deviations were identifie . plant Tours (51053)
At various times during this report period, the NRC inspectors conducted inspections of the Unit i reactor, safeguards emergency diesel generator, auxiliary, and electrical / control buildings. These inspections were conducted to observe work in progress, equipment protection and storage and general housekeeping activities. No significant observations were made during this report period and no violations or deviations were identifie . Open Items open items are matters which h' ave been discussed with the applicant, which will be reviewed further by the inspector, I and which involve some action on the part of the NRC or the applicant or both. An open item disclosed during the inspection is discussed in paragraph . Exit Meeting (30703)
l l
An exit meeting was conducted July 6, 1988, with the i-applicant's representatives identified in paragraph 1 of this L repor No written material was provided to the applicant by the inspectors during this reporting period. The applicant did not identify as proprietary any of the materials provided to or reviewed by the inspectors during this inspection.
l During this meeting, the NRC inspectors summarized the scope l and findings of the inspection.