IR 05000445/1997007

From kanterella
Jump to navigation Jump to search
Insp Repts 50-445/97-07 & 50-446/97-07 on 970324-27.No Violations Noted.Major Areas Inspected:Plant Support
ML20137W304
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/16/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20137W301 List:
References
50-445-97-07, 50-445-97-7, 50-446-97-07, 50-446-97-7, NUDOCS 9704180078
Download: ML20137W304 (11)


Text

.

. _ _.

_.... _..... _.

. _ _ _..._ _ _ __

_ _ _ _ _ _ _ _

-. _.... _ _. _ _.

_

.

ENCLOSURE U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket Nos.:

50-445 50-446

)

License Nos.:

NPF-87 i

NPF-89 Report No.:

50-445/97-07

50-446/97-07 i

l Licensee:

TU Electric I

Facility:

Comanche Peak Steam Electric Station, Units 1 and 2 j.

Location:

FM-56 Glen Rose, Texas j

Dates:

March 24-27,1997 Inspector:

Gilbert L. Guerra, Jr., Radiation Specialist Approved By:

Blaine Murray, Chief, Plant Support Branch j

ATTACHMENT:

Supplemental Information

,

!

l l

l l

,

l

!

i

!

9704180078 970416

!

PDR ADOCK 05000445

'

G PDR

_

i

_ _ _. _ _ _.

,_

,,

_ -.

,

.

>

l

  • I l-2-

!

l

!

f EXECUTIVE SUMMARY l

Comanche Peak Steam Electric Station, Units 1 and 2 NRC Inspection Report 50-445/97-07;50-446/97-07 j

.

Plant Suocort i

l An excellent radiological environmental monitoring program was imolemented in

accordance with Offsite Dose Calculation Manual requirements (Section R1.1).

l-An effective meteorological monitoring program was implemented (Section R1.2).

  • l Environmental monitoring stations were properly maintained with operable and

t calibrated equipment (Section R2.1).

The meteorological towers were properly maintained with allinstrumentation

calibrated at the proper frequencies. Data recovery was greater than 90 percent

,

(Section R2.2).

Radiological environmental monitoring implementing procedures containing sufficient

,

detail were used (Section R3.1).

{

,

Personnel responsible for implementing the monitoring program were properly

trained and qualified (Section R51).

Adequate staffing was maintained, and management provided good support for the

radiological environmental monitoring program (Section R6.1).

.

Comprehensive audits were performed. The audits identified items for improvement

and evaluated the performance and implementation of the radiological environmental monitoring program (Section R7.1).

  • .

The Annual Radiological Environmental Operating and Annual Radioactive Effluent Release Reports were submitted in a timely manner. The reports contained the required information (Section R8.1).

!

ia.

?

I

!

!


,s,-

.

--

,--,w-

,- ---

a-

, -

,

, -,

-

-

--

.

. _ - -

... -. - - _ ~. -

.. -. -

-. -...... - -. -. _ _

.

- _,

. -. -

'

.

-3-Report Details

l Summary of Plant Status

!

Units 1 and 2 were operating at power during the inspection. There were no operational occurrences that impacted the results of the inspection.

IV. Plant Supp_g_d

'

R1 Radiological Protection and Chemistry Controls R1.1 Radioloaical Environmental Monitorina Proaram (84750)

a.

Insoection Scooe The inspector reviewed the radiological environmental monitoring program to determine compliance with the requirements in the Offsite Dose Calculation Manual.

b.

Observations and Findinas

!

The Offsite Dose Calculation Manual and appropriate procedures were used. These documents contained sufficient detail for conducting the radiological environmental monitoring program. The licensee had made minor changes to the Offsite Dose Calculation Manual for clarification of sample analysis frequencies. -The inspector

'

noted that the changes did not decrease the effectiveness of the Offsite Dose i

Calculation Manual. Environmental technicians were knowledgeable of the sampling j

procedures and the Offsite Dose Calculation Manual.

Licensee staffing was adequate and management controls were appropriate. All i

environmental sampling was conducted as required. Sample analyses were performed by an outside vendor. The annual land use census was performed as

)

required. The licensee's annual reports were written and submitted to the NRC as i

required, j

l The inspector noted that the radiological environmental monitoring program was fully implemented in accordance with the requirements in the Offsite Dose Calculation Manual. Based on observations during this inspection and review of j

previous NRC findings in this program area, the inspector determined that performance continued to be excellent.

c.

Conclusiong Overall, an excellent radiological environmental monitoring program was

l implemented in accordance with Offsite Dose Calculation Manual requirements.

i.

I

_ _ - _ _ _ _ _ _ _ _ _.. _. _ _ _ _ _ _ _.,-- --

.

. - -

r

--

-

.

- - --

- -.

-.. - -

.

. - _ -.

.

~ -

...

-

--.

i.

.

I

i i

.

R1.2 Meteoroloaical Monitorina Proaram (84750)

l a.

Insoection Scope The inspector reviewed the meteorological monitoring program to determine agreement with the recommendations in NRC Regulatory Guide 1.23 and compliance with the commitments in the Updated Final Safety Analysis Report, Section 2.3. Also, the inspector reviewed data collection and review procedures, l

and discussed the data results with licensee personnel.

.

b.

Observations and Findinas l

The licensee utilized meteorological towers equipped with the required l

instrumenta, tion. This instrumentation conformed to commitments documented in the Updated Final Safety Analysis Report, Section 2.3 and Regulatory Guide 1.23.

Signals from the instrumentation were collected by the plant computer and displays of meteorological data were available to the operations staff and at the emergency I

facilities. Licensee procedures for the collection and review of meteorological data

!

were used.

i i

i

!

C.

Conclusions i

An effective meteorological monitoring program was implemented. The inspector l

determined that a proper data collection and review program was in place. The

.{

performance of the meteorological monitoring program satisfied the commitments of l

the Update Final Safety Analysis Report, Section 2.3 and agreed with the guidance

'

contained in Regulatory Guide 1.23.

l l

R2 Status of Radiological Protection and Chemistry Facilities and Equipment R2.1 Environmental Monitorina Eauioment and Facilities (84750)

a.

Insoection Scoce l

The inspector visited selected environmental sampling stations to verify that stations were properly maintained and equipment was operable and properly calibrated. Sample preparation and storage facilities were inspected to verify that sufficient supplies and spare equipment were available.

b.

Observations and Findinas The inspector observed the facilities used for environmental media sample storage and preparation. The sample preparation / storage area was equipped with the necessary spare equipment and supplies to perform the required radiological environmental monitoring program sampling activities.

l

'

_.

._. _

.

.

-5-The inspector toured the environmental sampling locations, which included sampling stations for the collection of air, broadleaf vegetation, milk, and water samples with an environmental specialist. The location of thermoluminescent dosimeters was also noted. The inspector noted that air sampler equipment in use was properly calibrated and operational. A timing device was used on each air sampler to track operation history. Samples were properly prepared for shipment to a vendor laboratory for analyses.

c.

Conclusions The licensee maintained sufficient supplies and spare environmental sampling equipment to perform the activities described in the Offsite Dose Calculation Manual. Environmental monitoring stations were properly maintained with operable and calibrated equipment.

R2.2 Meteoroloaical Monitorina Eauioment (84750)

a.

Inspection Scooe The inspector observed the meteorological instrumentation at the meteorological towers and reviewed the associated calibration records to ensure that the meteorological instrumentation on the towers was operable, calibrated, and maintained in accordance with written procedures, the guidance in Regulatory Guide 1.23, and Updated Final Safety Analysis Report, Section 2.3.

b.

Observations and Findinas i

The inspector toured the meteorological tower with licensee technicians responsible for performing periodic calibrations of the monitoring equipment on the towers. The licensee maintained a primary tower with monitoring instrumentation at the 10 and 60 meter levels, and a backup tower with instrumentation located at the 10 meter level. The instrumentation at these levels included wind speed, wind direction, and temperature sensing instrumentation. Instrumentation, including recording and transmitting equipment, was noted to be in good operating condition. Daily channel checks, physical inspections, and semi-annual calibrations were performed on the rneteorological instruments.

The inspector noted that the instrumentation agreed with Regulatory Guide 1.23 recommendations and the licensee's Update Final Safety Analysis Report, l

Section 2.3. The inspector noted that allinstrumentation was operable and properly l

calibrated. Calibration records indicated that the instrumentation was maintained

~

'

properly and calibrations were performed at the proper frequencies. Daily channel checks were performed in accordance with operations procedure requirements.

Operation of the meteorological towers resulted in data recovery rates of 93.8 percent for 1995, and 93.5 percent for 199 _

_. _ __

. __ _._

.

. _ _ _

. _ _ _... _ _ _. _ _

_ _ _ _

._ _

.

l

.

-6-c.

Conclusions

i j

The meteorological towers were properly maintained with allinstrumentation

'

calibrated at the proper frequencies. Data recovery was greater than 90 percent.

I R3 Radiological Protection and Chemistry Procedures and Documentation

'

'

R3.1 Chanaes in the Offsite Dose Calculation Manual and Radioloaical

'

Environmental Monitorina lmolementina Procedures (84750)

j a.

Insoection Scoce.

'

The inspector reviewed changes made to the Offsite Dose Calculation Manual and implementation procedures regarding the radiological environmental monitoring

'

program.

l b.

Observathns and Findincs

)

Revisions 13 and 14 to the Offsite Dose Calculation Manual had been issued since the last inspection. The changes affecting the radiological environmental monitoring program were only to clarify sample analysis frequencies. The inspector noted that the changes did not result in a decrease of the effectiveness of the Offsite Dose Calculation Manual. The implementing procedures described the responsibilities for collection, documentation, and shipment of environmental media samples collected around the Comanche Peak site. The licensee's procedures were written with sufficient detail for conducting the required radiological environmental monitoring program activities. No concerns were identified in the review of the environmental procedures.

c.

Conclusions The licensee had made minor changes to the Offsite Dose Calcolation Manual.

However, these changes did not decrease the effectiveness of the radiological environmental monitoring program. Radiological environmental monitoring program implementing procedures containing sufficient detail were used.

R4 Staff Knowledge and Performance a.

Insoection Scoce (84750)

The inspector observed and held discussions with personnel involved with the implementation of the radiological environmental monitoring program to determine their knowledge of environmental sampling and implementing procedures.

. - -

-

-

.

.-

..

..---- -

..-.

-.--

---

-. - -.

.

.

b-7-b.

Observations and Findinas The inspector noted that good practices were used by the environmental specialist in maintaining sample integrity. All activities observed were conducted in an orderly fashion. The inspector noted that the licensee's staff knowledge of sampling procedures, the Offsite Dose Calculation Manual, and NRC requirements was excellent.

c.

.C_Qnclusions Licensee staff had an excellent understanding of the radiological environmental monitoring program, the Offsite Dose Calculation Manual, and regulatory requirements.

,

R5 Staff Training and Qualification a.

Insoection Scoce (84750)

The training and qualification programs for the technical staff responsible for implementing the radiological environmental monitoring program were reviewed.

b.

Observations and Findinas The licensee's training records revealed that the current staff implementing the radiological environmental monitoring program were properly trained and qualified.

These individuals had several years of experience with Offsite Dose Calculation Manual requirements. The licensee stated that alternate / backup personnel would be trained to perform sampling required by the radiological environmental monitoring program. To this effect, the licensee was working on updating on-the-job-training and qualification card requirements. The licensee was making good progress in this effort.

c.

Conclusions Personnel responsible for implementing the monitoring program were properly l

trained and qualified.

!

!

R6 Radiological Protection and Chemistry Organization and Administration R6.1 Environmental Monitorina (84750)

,

a.

Insoection Scooe f.

}

The organization, staffing, and assignment of the radiological environmental l

monitoring program responsibilities were reviewed.

l

.

.

.

.

_ _, _

_

.

-

'

l

.

,

.

-8-i b.

Observations and Findinos

,

Management of the radiological environmental monitoring program was performed by the radioactive materials control group of the radiation protection department.

'

No significant changes in the organization were noted since the last inspection; however, the licensee expected changes to occur in the near future. Two individuals were responsible for the majority of the collection and preparation of the

)

environmental samples, including the review of the sample analysis results and

,

preparation of the annual reports. As a result of a planned future re-organization of the radiation protection department, other personnel are to be designated as having l

responsibilities in the radiological environmental monitoring program. These j

individuals would be trained in accordance with licensee procedures.

!

c.

Conclusions l

The present organization maintained adequate staffing and provided management I

support for implementing the radiological environmental monitoring program, R7 Quality Assurance in Radiological Protection and Chemistry Activities R7.1 Audits (84750)

a.

Insoection Scope Quality assurance audit reports concerning the radiological environmental monitoring i

and meteorological programs were reviewed for scope, thoroughness, and timely followup of identified deficiencies.

b.

Observations and Findinos The inspector reviewed the results of audits performed by the licensee during 1995

{

and 1996. The inspector noted that audits were comprehensive, thorough, and i

provided management with the appropriate oversight of the radiological envircr$ mental monitoring program. Audit findings were corrected in a timely l

manner.

The licensee's contractor laboratory participated in aa intercomparison program and results were forwarded to the licensee. Acceptable results were noted in the intercomparison data.

l c.

Conclusions i

!

Thorough, comprehensive audits were performed. The audits identified items for l

improvement and evaluated the performance and implementation of the radiological environmental monitoring program. Audits were performed at the required frequency.

I

<

l t

.

m

--.

-

t

}

d

.

-9-J R8 Miscellaneous Radiological Protection and Chemistry issues R 8.1 Annual Environmental Ooeratina and Effluent Release Reoorts (84750)

a.

Insoection Scope The inspector reviewed the annual reports concerning radiological environmental monitoring program activities to determine compliance with the requirements of Technical Specifications 6.9.1.3 and 6.9.1.4, and the Offsite Dose Calculation Manual. These documents were reviewed for omissions, obvious mistakes, anomalous measurements, observed biases, trends in the data, and laboratory inter-comparisons.

b.

Observations and Findinas Sampling results included in the 1994,1995, and 1996 (draft) Annual Radiological Environmental Operating Reports indicated that sampling was performed as required. Discrepancies or missed samples were reported as required. The inspector noted that sampling, analyses, and reporting requirements were met. The annual land use censuses were conducted as required, and the results were included in the report.

.

The 1994 and 1995 Annual Radioactive Effluent Release Reports included meteorological data as required.

c.

Conclusions The Annual Radiological Environmental Operating and Annual Radioactive Effluent Release Reports were submitted in a timely manner. The reports contained the required information.

V. Manaaement Meetinos X1 Exit Meeting Summary The inspector presented the results of the inspection to members of licensee management

._at the conclusion of the inspection on March 27,1997. The licensee acknowledged the

findings presented. No proprietary information was identified.

.-. -

..

.

. -.

.

.

-

.

.-

. ~ -.

- - - -.

.

_

.

._

_.

.

.

.

ATTACHMENT SUPPLEMENTAL INFORMATION PARTIAL LIST OF PERSONS CONTACTED Licensee S. Bradley, Radiation Protection Supervisor J. Curtis, Radiation Protection Manager E. Floyd, Staff Health Physicist B. Knowles, Radiation Protection Technician R. Ramsour, Radiation Protection Technician C. Welch, Senior Nuclear Specialist, Nuclear Overview C. Wilkerson, Senior Engineer, Regulatory Aff airs

'

NRC H. Freeman, Resident inspector l

in addition to the personnel listed above, the inspector contacted other personnel during this inspection.

INSPECTION PROCEDURE USED IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring LIST OF DOCUMENTS REVIEWED PROCEDURES STA-714 Meteorological Monitoring Program, Revision 3, March 12,1993 RPI-309 Routine Operation of the Meteorological Computer System, Revision 6, March 15,1996 RPI-710 Radiological Environmental Monitoring Program, Revision 6, November 22,

'

1995 RPI-712 Radiological Environmental Sampling / Analysis Program, Revision 1, December 20,1996 i

RPI-713 Collection, Preparation, and Shipment of Radiological Environmental Samples, l

Revision 1, December 20,1996 RPI-714 Land Use Census, Revision 0, November 22,1995

,

l l

...

_

. _ _

--

- --

.

_

. - -

.

.

-2-AUDITS NOE-EVAL-95-000169 " Effluent and Environmental Monitoring Program," August 16, 1995 NOE-EVAL-96-000141

"Radwaste and Effluent / Environmental Monitoring Program,"

September 12,1996 REPORTS Annual Radioactive Effluent Release Reports - 1994,1995,1996 (draf t)

Annual Radiological Environmental Operating Reports - 1994,1995,1996 (draf t)

OTHER Offsite Dose Calculation Manual, Revision 14 Radiation Protection department training records Organizational Charts Meteorological Tower Instrumentation Calibration Records

,

.