.U.S.. NUCLEAR REGULATORY COMMISSION-
REGION IV
NRC Inspection Report:
50-445/89-56 Construction Permits:
CPPR-126'
'
'
50-446/89-56 CPPR-127-
~ Dockets:.50-445-50-446
.
Licensee: TU Electric (TUEC)
Skyway Tower 400 North Olive, L.B. 81 Dallas, Texas 75201'
~
Facility Name:
Comanche Peak Steam Electric Station (CPSES)
Inspection At: CPSES, Glen Rose, Tenas Inspection Conducted: ~ JulyL 10-14,.1989 Inspector:
'
M
.
MN
,
R. A. Caldwell, Physical SecuMty Specialist Date Security and Emergency. Preparedness Section Approved:
[ YD 0. A. Powers, Chief, Security and Emergency-Date-Preparedness.Section
- Insoection' Summary
Inspection Conducted July 10-14, 1989 (Report 50-445/89-56]
Areas Inspected:
Routine, announced, preoperational inspection of the applicant's physical security program.
The areas inspected within the physical security program included protected area (PA) physical barriers, vital j
,
area (VA) physical barriers, communications, testing and maintenance, and
'
security system power supply.
Results: Within the areas inspected, no violations or deviations were identified. The inspector observed that adequate progress was being made in alli areas of the applicant's security implementation program. The applicant's security implementation schedule requires soft lockdown on August 3, 1989, and hard lockdown on-September 2, 1989. The applicant committed to perform material 'and vehicular searches commencing July 31, 1989, to provide an inspection window for NRC prior to the hard lockdown on August 3, 1989.
-e908230'102 890815 ENCLOSURE CONTAINS PDR ADOCK 05000445 g FDC UPON SEPARATION THIS pacr E OFCONTROLLED
.
.-.
-
.
-_ _ - _=._ _,
- p. 2M:7-t _1.;.
,
,*
. *
...
n ; g.
't
'j.,
..
{ t
'
,,
A
' Inspection Conducted' July:10-14,' 1989 (Report 50-446/89-56)-
>
' Areas Inspected: No' inspection of Unit'2 was conducted.
_
. Results: Not ap'plicable.
..