Partially Withheld Preoperational Insp Repts 50-445/89-56 & 50-446/89-26 on 890710-14 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Applicant Physical Security Program,Including Protected Area Physical Barriers
ML20246A802
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/15/1989
From: Caldwell R, Powers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20246A780 List:
References
50-445-89-56, 50-446-89-56, NUDOCS 8908230152
Download: ML20246A802 (2)


Text

-

.-

7 ,.

%; ,

. . ;g-up

-

~

> .

, ..

' APPENDIX

.U.S.. NUCLEAR REGULATORY COMMISSION-

REGION IV

NRC Inspection Report: 50-445/89-56 Construction Permits: CPPR-126'

' '

50-446/89-56 CPPR-127-

~ Dockets: .50-445-50-446

.

Licensee: TU Electric (TUEC)

Skyway Tower 400 North Olive, L.B. 81 Dallas, Texas 75201'

~

Facility Name: Comanche Peak Steam Electric Station (CPSES)

Inspection At: CPSES, Glen Rose, Tenas Inspection Conducted: ~ JulyL 10-14, .1989 M MN

'

Inspector: , 4 .

R. A. Caldwell, Physical SecuMty Specialist Date Security and Emergency. Preparedness Section Approved: [ YD 0. A. Powers, Chief, Security and Emergency- Date-Preparedness.Section

Insoection' Summary

Inspection Conducted July 10-14, 1989 (Report 50-445/89-56]

Areas Inspected: Routine, announced, preoperational inspection of the applicant's physical security progra The areas inspected within the

, physical security program included protected area (PA) physical barriers, vital j area (VA) physical barriers, communications, testing and maintenance, and

'

security system power suppl Results: Within the areas inspected, no violations or deviations were identified. The inspector observed that adequate progress was being made in alli areas of the applicant's security implementation program. The applicant's security implementation schedule requires soft lockdown on August 3, 1989, and hard lockdown on-September 2, 1989. The applicant committed to perform material 'and vehicular searches commencing July 31, 1989, to provide an inspection window for NRC prior to the hard lockdown on August 3, 198 e908230'102 890815 ENCLOSURE CONTAINS PDR ADOCK 05000445 g FDC UPON SEPARATION THIS pacr E OFCONTROLLED

. .- . -

.

-_ _ - _=._ _ ,

  1. p. 2M:7- ,

t _1.;.

,* . *

...

n ; 't

'j . , ..

{ t

'

, ,

A

>

' Inspection Conducted' July:10-14,' 1989 (Report 50-446/89-56)-

' Areas Inspected: No' inspection of Unit'2 was conducte _

. Results: Not ap'plicabl ..