R APPENDIX U. S. NUCLEAR REGULATORY COMMISSION.
REGION IV
NRC Inspection Report:
50-445/89-62 Construction Permits: CPPR-126 50-446/89-62 CPPR-127 Dockets: -50-445 50-446
. Licensee: TU Electric 400 North Olive, L.B. 81
~ Dallas, Texas 75201 Facility Name: Comanche Peak Steam Electric Station (CPSES)
Inspection At: CPSES, Glen Rose, Texas Inspection Conducted: July 31.through August 4, 1989 b
_
Mb4%
Inspector:
I )c1 A O.
). A(F. Kefly, Sr. Physical (Security Specialist Date
~
5epr'ity and Emergency Preparedness Section U
. Approved:
Dr. O. A. Powers, Chief Security and Emergency Date Preparedness Section Inspection Summary Inspection Conducted July 31 througfi August 4,1989 (Report 50-445/89-62)
Areas Inspected:
Routine, announced preoperational inspection of the applicant's physical security program. The areas inspected within the physical security program included security program audits; personnel, package and vehicle access control; protected area detection aids; alarm assessment aids; testing and maintenance; and the security system power supply.
Results: Within the areas inspected, no violations or deviations were identified. The inspector observed that progress continues to be made in all areas of the applicant's security implementation program. The applicant's security program is phasing into hard lockdown and making adjustments as experience is gained.
Vehicular searches, while providing security experience, are causing a considerable drain of resources because enforcement of the 3909210002 890901 ENCLOSURE CONTAINS
{DR ALOCK 0300
UPON SEPARATION THIS PAGE IS DECONTROLIID
. _ _ - _. - _ _ _ _ _ _ _ _
_
_
-
_ _ _ _.__ -_ __. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
-_
,
\\
\\
(
i
]
.
4.
..
+
-
>
.g.
vehicle access authorization program is not yet operational. The emergency power supply tests showed that the electrical diagrams available in the control room need to be updated. The power failure tests demonstrated that emergency security power requirements, as committed to in the Physical Security Plan, were not Deing fully met.
Inspection Summary Ins;,ection Conducted July 31 through August 4,1989 (Report 50-446/89-62)
Areas Inspected: No inspection of unit 2 was conducted.
Res W - Not applicable.
ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED