IR 05000445/1989062

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-445/89-62 & 50-446/89-62 on 890731-0804 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program, Including Security Program Audits & Testing & Maint
ML20247J802
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/24/1989
From: Joseph Kelly, Powers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20247J799 List:
References
50-445-89-62, 50-446-89-62, NUDOCS 8909210002
Download: ML20247J802 (2)


Text

- - _ . . _ __ _ __ _ -. . _ . -- . - _ _ _ _ _ _ _ - _ _ _ -.

, v.1,...- ..

R APPENDIX U. S. NUCLEAR REGULATORY COMMISSIO REGION IV NRC Inspection Report: 50-445/89-62 Construction Permits: CPPR-126 50-446/89-62 CPPR-127 Dockets: -50-445 50-446

. Licensee: TU Electric 400 North Olive, L.B. 81

~ Dallas, Texas 75201 Facility Name: Comanche Peak Steam Electric Station (CPSES)

Inspection At: CPSES, Glen Rose, Texas Inspection Conducted: July 31.through August 4, 1989 Inspector: I )c1 A b _

). A(F. Kefly, Sr. Physical (Security Specialist Mb4%

~

Date 5epr'ity and Emergency Preparedness Section

. Approved: U Dr. O. A. Powers, Chief Security and Emergency Date Preparedness Section Inspection Summary Inspection Conducted July 31 througfi August 4,1989 (Report 50-445/89-62)

Areas Inspected: Routine, announced preoperational inspection of the applicant's physical security program. The areas inspected within the physical security program included security program audits; personnel, package and vehicle access control; protected area detection aids; alarm assessment aids; testing and maintenance; and the security system power suppl Results: Within the areas inspected, no violations or deviations were identified. The inspector observed that progress continues to be made in all areas of the applicant's security implementation program. The applicant's security program is phasing into hard lockdown and making adjustments as experience is gained. Vehicular searches, while providing security experience, are causing a considerable drain of resources because enforcement of the 3909210002 890901 ENCLOSURE CONTAINS ALOCK 0300 5

{DR UPON SEPARATION THIS PAGE IS DECONTROLIID

. _ _ - _ . - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ .__ -_ __ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -_

,

\ \

i ( . . . +

]

- >

. vehicle access authorization program is not yet operational. The emergency power supply tests showed that the electrical diagrams available in the control room need to be updated. The power failure tests demonstrated that emergency security power requirements, as committed to in the Physical Security Plan, were not Deing fully me Inspection Summary Ins;,ection Conducted July 31 through August 4,1989 (Report 50-446/89-62)

Areas Inspected: No inspection of unit 2 was conducte Res W - Not applicabl ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED

__-_-_____-_-__ _