IR 05000445/1989041

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-445/89-41 & 50-446/89-41 on 890605-09 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program, Including Protected Area Barriers & Testing & Maint
ML20246D037
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/22/1989
From: Earnest A, Everett R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20246D015 List:
References
50-445-89-41, 50-446-89-41, NUDOCS 8907110222
Download: ML20246D037 (1)


Text

_ _ _ _

'

'

,,

!. . , u i i

)

APPENDIX l i

U.S. NUCLEAR REGULATORY COMMISSION REGION IV ]

NRC Inspection Report: 50-445/89-41 Construction Pcrmits: CPPR-126 50-446/89-41 CPPR-127 Dockets: 50-445 50-446  !

Applicant: Texas Utilities Electric Company (TUEC)

400 North Olive, L.B. 81 Dallas, Texas 75201 Facility Name: Comanche Peak Steam Electric Station (CPSES)

Inspection At: CPSES, Clen Rose, Texas Inspection Conducted: June 5-9, 1989

' Inspector: d2/W A. B. Earnest, Physical Security Specialist Date Security and Emergency Preparedness Section Approved: k22hf R. J. Everett, Chie~f, Security and Emergency Date Preparedness Section Inspection Summary Inspection Conducted June 5-9, 1989 (Report 50-445/89-41)

Areas Inspected: Routine, announced preoperational inspection of the applicant's physical security program. The areas inspected within the physical security program included protected area (PA) barriers, detection aids-PA, access control of personnel, and testing and maintenanc Results: Within the program areas inspected, no violations or deviations were identified. The NRC inspector identified several minor problems that require action prior to licensing. These areas are identified as open items in this report. The applicant appears to be making good progress in the implementation of the security program at CPSES. One area that the NRC inspector viewed with concern was the apparent slowness with which the applicant was removing the numerous vehicles, portable buildings, and other obstructions inside the protected area. Any delay in removing these obstructions may affect the applicant's August 3,1989, schedule for lockdown of the sit Inspection Conducted June 5-9,1989 (Report 50-446/89-41)

Areas Inspected: No inspection of Unit 2 was conducted.

l ENCLOSURE CONTAINS Results: Not applicable. l 89o7110222 890629 UPON SEPARATION THIS