IR 05000445/1988030
| ML20153C178 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/28/1988 |
| From: | Baer R, Nicholas J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20153C176 | List: |
| References | |
| 50-445-88-30-MM, 50-446-88-26, NUDOCS 8805060176 | |
| Download: ML20153C178 (3) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _
-
.
.
.
MPENDIX U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-445/88-30 Construction Permits:
CPPR-126 50-446/88-26 CPPR-127 Dockets:
50-445 50-446 Licensee:
TV Electric 400 North Olive, L.B. 81 Dallas, Texas 75201 Facility Name:
Comanche Peak Steam Electric Station (CPSES)
Inspection At:
'
Inspection Conducted:
April 7, 1988 Inspector:
-
4/26/d56 2 B. Nicholas, Jenior Radiation Specialist Date Facilities Radiological Protection Section
7.pproved:
[-
/4 CL
//fB/d6 R( E. Baer, Acting Chief, Facilities Date Radiological Protection Section Inspection Summary Inspection Conducted April 7, 1988 (Report 50-445/88-30: 50-446/88-26)
Area Inspected:
Meeting requested by the licensee to discuss the licensee's proposed relocation and modifications to the backup meteorological tower and associated monitoring systems.
Results: Within the scope of the meeting, no violations or deviations were identified.
$[
Q
___
,_
_
.
- - _ _
_,_
. _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _
n
..
.
t.
,
DETAILS 1.
Persons Attending TV Electric K. Abbamonte, CPSES Engineer - Nuclear R. S. Berk, Licensing Engineer S. E. Bradley, Radiation Protection C. G. Creamer, Manager, Instruments and Controls (I&C)
D. L. Davis, Manager, Results Engineering E. T. Floyd, Radiation Protection Technician T. Gosdin, Nuclear Operations Administrative Support S. E. Johnson, Senior Engineer, Results Engineering R. N. Lilleston, I&C Engineer C. W. Rickgauer, Engineering Supervisor, Results Engineering L. A. Wojcik, Supervisor, Nuclear Engineering D. R. Woodlan, Licensing Engineer NRC S. Burris, NRC Resident Inspector, Preoperational Tests, CPSES-J. S. Wiebe, NRC Senior Lead Operations Inspector, CPSES R. F. Warnick, NRC Assistant Director for Inspection Programs, CPSES 2.
Meetina Summary On April 7, 1988,. representatives of TU Electric met with representatives of the NRC to discuss the licensee's reasons and justifications to relocate and modify the backup meteorological tower and associated monitoring systems.
The meeting was held at the request of TV Electric.
The following items were discussed during the meeting:
a.
Moving the backup meteorological tower near the primary meteorological tower (1) Initiating events and background information (2) Changes to the area around the present backup meteorological tower and observations as a result of these changes (3) Data from a comparison study and new building influence conclusions (4) Options available and considerations (a) Maintain backup meteorological tower at current location
...._ _ _ - -.
..
- -
- .
..
s
. *
.
1)
Effluent concentrations 2)
fransport time 3) l Human factors (b) Move backup meteorological tower 1)
Tornado / Fire / Lightning 2)
Correction factor development and maintenance 3)
Feedback of equipment problems (5) Conclusions
.
(6) Schedule for relocation of the backup meteorological tower and
'
system operability b.
. Removal of both dewpoint channels and redundant precipitation channel from the backup meteorological tower At the conclusion of the meeting, the NRC representatives informed the licensee that the proposed changes to the meteorological monitoring system would have to be submitted to and approved by the site NRC Project Manager and the appropriate division of the NRC-Office of Nuclear Reactor Regulation prior to any changes being made to the present backup meteorologica1' tower.
i
W
'
T
-
-