Discusses Insp Rept 50-424/87-71 on 871208-11 & Forwards Notice of Violation.Enforcement Conference Held to Discuss Inability to Implement Alternate Remote Shutdown While Simultaneously Combatting Fire for Control Room Fire
ML20151V514
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/19/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Head G
GEORGIA POWER CO.
Shared Package
ML20151V519 List:
References
NUDOCS 8805030086
Download: ML20151V514 (3)


Text

_- _ _ _ _ _ _ _ . ._ - . _

  • *

.

&ry-

-

ApR 191988 Docket No. 50-424 License No. NPF-68 Georgia Power Company ATTN: Mr. George F. Head Senior Vice President-P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT N0. 50-424/87-71)

This rc#ers to the Nuclear Regulatory Commission (NRC) inspection conducted by G. R. Wiseman on December 8-11, 198 The inspection included a review of activities authorized for your Vogtle facilit The report documenting this inspection was sent to you by letter dated February 2, 198 Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progres Violations were identified during the subject inspection. Subsequent to this inspection an enforcement conference was held in the Region II office on February 10, 1988. A summary of this enforcement conference was sent to you on March 31, 198 A followup inspection, 50-424/88-16, was also conducted at the Vogtle site on March 7-10, 1988, to gather further information to evaluate Violation 424/87-71-04, Inability to Implement Alternate Remote Shutdown While Simultaneously Combatting the Fire For a Control Room Fir Based on the results of this inspection, we agree with your conclusion that plant shutdown from outside the control room can be achieved with three operators. Therefore, Violation 424/87-71-04 did not constitute a violatio Accordingly, we will adjust our records to reflect that no violation of regulatory requirements occurred with respect to this ite The remaining inspection findings indicate that certain activities appeared to violate hRC requirements. The violations, references to pertinent requirements, and elements to be included in your response are described in the enclosed Notice of Violatio PLR ADOCK 05000424 g\

O DCD JEo/ ,

. . .

,.

'D- ..

APR 191988

.

.

Georgia Power Company 2 In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Roo The responses directed by this letter and its enclosure are not subject to the clearance procedures of the Office of Managenent and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No. 96-51 Should you have any questions concerning this letter, please contact u

Sincerely, C

J J. Nelso Grace

,

Regional Administrator Enclosure:

Notice of Violation cc w/ enc 1:

P. D. Rice, Vice President, Project Director

C. W. Hayes, Vogtle Quality Assurance Manager G. Bockhold, Jr. , General Manager, ,

Nuclear Operations

'

L. Gucwa, Manager, Nuclear Safety and Licensing J. A. Bailey, Project Licensing Manager B. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge D. Kirkland, III, Counsel, Office of the Consumer's Utility .

'

Council D. Feig, Georgians Against Nuclear Energy bec w/ enc 1: (Seepage 3)

.

<>

.. APR 191988

,

.

Georgia Power Company 3 bec w/ enc 1:

E. Reis 0GC J. Hopkins, NRR'

M. Sinkule, RII J. Lieberman 0E D. Kubicki, NRR A. Krasonoulos, RI J. Ullie, RIII J. Singh, RIV C. Ramsey, RV R. Wescott, OSP/TVA DRS Technical Assistant NRC Resident Inspector Document Control Desk L State of Georgia

,

I i

d b

RII / RII RI , RII G seman:er TConlon AHerdt AFGi son 04/q/88 04/4/88 04/1/88 04/g 8 RII RI / RII RII O ASinkule LA eyes GRJenk[s rnpt ,

04/p/88 04/3/88 04/j,y/88 04/(V88 i

~. . _ _ _ , _ _ . - _ _ . ..

. _ _ . . _ .-..- . - .. _ . . - - - . - - .