IR 05000424/1987007

From kanterella
Jump to navigation Jump to search
Partially Withheld Preoperational Insp Rept 50-424/87-07 on 870105-08 (Ref 10CFR2.790 & 73.21).Major Areas Inspected: Regulatory Requirements & Licensee Commitments,Security Plan & Implementing Procedures & Security Organization
ML20210C852
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/02/1987
From: Gibson G, Mcguire D, Thompson D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20210C756 List:
References
50-424-87-07, 50-424-87-7, NUDOCS 8702090467
Download: ML20210C852 (1)


Text

-

-_ -____ - - - - _ _ _ - - - _ _ _ - _ - _ - _ - _ - _ - _ - _ - _ _ _ - _ - - -

i;' .

..

3AFEGUARDS INFORMATION UNITE D STATES

[ pug- #o,^

'

NUCLEAR REGULATORY COMMISSION y REGION 18 y j 101 MARIETTA STREET, * 2 ATLANTA, GEORGI A 30323 k,,,/ FEB 0 21987 Report No.: 50-424/87-07 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket No.: 50-424 License No.: CPPR-108 I

Facility Name: Vogtle 1 Inspection Conducted: January 5-8, 1986 Inspectors:e x ).7d n-, nom / -J 7- &~/

K Tillman, P/lysical Security Inspector Date Signed bbrnrMLtY3 )-47-Y1 n Date Signed D.i/Thompsp/

// / , fhysical Security Inspector AMW /-2 7-2 7 i n Ph al Security Inspector Dat Sig ed Approved by:/ . !_ 7 O. R. MtGuire, Chief, Physical Security Section

/ 2FM

' 17 ate [igr(ed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This announced, pre-operational physical security inspection consisted of a review of the status of security program implementation in the following areas: Regulatory Requirements and Licensee Commitments; Security Plan and Implementing Procedures; Management Effectiveness - Security Program; Security Organization; Testing and Maintenance; Physical Barriers - Vital Areas; Lighting; Assessment Aids; Access Control - Personnel; Access Control - Packages; Access Control - Vehicles; Detection Aids - Protected Area; Detection Aids - Vital Areas; Alarm Stations; Personnel Training and Qualification -

General Requirements; Safeguards Contingency Plan Implementation; and Physical Protection Safeguards Informatio Results: The licensee was found to be in compliance with regulatory requirements in the 16 areas inspecte E CsURE COSTAIMS R MOG 0500 4 fouAnas ItwomATIO;l gpop r,EPARATI0tt THIS PAGE IS DEc0NTROI.LEDe ._ . - - - . - -