IR 05000424/1987029

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-424/87-29 on 870423-24.No Violations or Deviations Noted
ML20236B508
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/08/1987
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20236B513 List:
References
NUDOCS 8707290133
Download: ML20236B508 (3)


Text

- - - - - _ - .

i

. s l

l MAY 0 81987 i i

Docket No. 50-424 License No. NPF-61

feorgiaPowerCompany j

/ ATTN: Mr, James P. O'Reilly 1 Senior Vice President-Nuclear Operations P. O. Box 4545 '

Atlanta, GA 30302 Gentlemen: 1 SUBJECT: NRC INSPECTION REPORT NO. 50-424/87-29 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by W. J. Ross on April 23-24, 198 The inspection included a review of 4 activities autnorized for your Vogtle Unit 1 Plant. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection repor Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progres Within the scope of the inspection, no violations or deviations were identifie In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact the DivisionofReactorProjects,SectionChie ;

Sincerely, ORIG!NAL SIGNED BY DOUGLAS M. COLLINS Douglas M. Collins, Chief 8707290133 870508 Emergency Preparedness and PDR ADOCK 05000424 Radiological Protection Branch G PDR Division of Radiation Safety and Safeguards Enclosure:

Inspection Report

cc w/ encl: (See page 2)

l

!

$ SEol i

- _ _ _ _ - _ _ _ _ _

-

. . l l

Georgia Power Company 2

/ccR.w/ encl: Senior Vice President &

E. Conway,

/. Project DirectorWhitney. r,eneral Manager Project f Support v4. D. Rice, Vice President, Project Engineering jR.H.Pinson,VicePresident, Project

/ Construction v'C. W. Hayes, Vogtle Quality j Assurance Manager

/ G. B. Bockhold, General Manager, Nuclear Operations

/L. Gucwa, Manager, Nuclear Safety and Licensing

/J. A. Bailey, Project Licensing Manager

/B. W. Churchill, Esq. , Shaw, Pittman, Potts and Trowbridge

/J. E. Joiner, Troutman, Sanders, j

,j Lockerman and Ashmore VJ. G. Ledbetter, Commissioner, 7 epartment D of Human Resources v C. H. Badger, Office of Planning and Budget

/D. Kirkland, III, Counsel, Office of the Consumer's Utility j f Council ]

VD. Feig, Georgians Against j

/ Nuclear Energy VM. B. Mcrgulies, Esq. , Chairman, Atomic Safety and Licensing Board

. Panel

/Dr. O. H. Paris, Administrative Judge Atomic Safety and Licensing Board

- Panel

/G. A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel bec w/ enc 1: (Seepage 3)

. .

Georgia Power Company 3 bcc w/ enc 1:

/E. Reis OGC 3 l

41. M. Hill, IE I

/M. Miller, NRR

/W. Brach,- EDO M. Sinkule, RII E. Christnot, RII y 41RC Resident Inspector Document Control Desk State of Georgia 1 l

l I

i i

I l

l

I l

l

/) A'

WJ ss focJKahle )3 Mdinkule t,p1/87 f/ X/V/87 1 s

i

- - - - . .__________.___.__.__._a