August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2016005)

Dear Mr. Sena:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Hope Creek Generating Station (Hope Creek). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Hope Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, (ADAMS Accession No. ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects

Docket Nos. 50-354 License Nos. NPF-57

Enclosure: Hope Creek Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML16242A052

SUNSI Review

Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE R1/DRP R1/DRP R1/DRP R1/DRP

NAME RVadella/RB for MDraxton/MD JHawkins/JH FBower

DATE 08/22/16 08/18/16 08/18/16 08/31/16

Letter to Mr. Peter P. Sena, III from Fred L. Bower dated August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2016005)

DISTRIBUTION w/encl:

DDorman, RA DLew, DRA

MScott, DRP DPelton, DRP RLorson, DRS PKrohn, DRS FBower, DRP RBarkley, DRP MDraxton, DRP RVadella, DRP JHawkins, DRP, SRI SHaney, DRP, RI RMcKinley, DRS JNoggle, DRS MGray, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO COtt, DRP, AA JBowen, RI, OEDO RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource RidsNrrDirslpab Resource ROPassessment Resource

Page 1 of 3 08/12/2016 09:09:07 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 07/01/2016 - 06/30/2018 EXM8/15

- HOPE CREEK INITIAL EXAMINATION

1 FY16-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U01925 07/18/2016 07/22/2016

FY16-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U01925 08/22/2016 09/02/2016 71124

- RADIATION PROTECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/11/2016 07/15/2016

IP Occupational ALARA Planning and Controls 71124.02 07/11/2016 07/15/2016

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 07/11/2016 07/15/2016

IP Occupational Dose Assessment 71124.04 07/11/2016 07/15/2016

IP Radiation Monitoring Instrumentation 71124.05 07/11/2016 07/15/2016 7111111B

- HOPE CREEK REQUAL INSP W/ P/F RESULTS

1 IP Licensed Operator Requalification Program 7111111B 09/26/2016 09/30/2016 71124

- RADIATION PROTECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/12/2016 09/16/2016

IP Occupational ALARA Planning and Controls 71124.02 09/12/2016 09/16/2016

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/12/2016 09/16/2016

IP Occupational Dose Assessment 71124.04 09/12/2016 09/16/2016

IP Radiation Monitoring Instrumentation 71124.05 09/12/2016 09/16/2016 7111108G

- INSERVICE INSPECTION

1 IP Inservice Inspection Activities - BWR 7111108G 10/17/2016 10/21/2016 71124

- RADIATION PROTECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/17/2016 10/21/2016

IP Occupational ALARA Planning and Controls 71124.02 10/17/2016 10/21/2016

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/17/2016 10/21/2016

IP Occupational Dose Assessment 71124.04 10/17/2016 10/21/2016

IP Radiation Monitoring Instrumentation 71124.05 10/17/2016 10/21/2016 71124

- RADIATION PROTECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/12/2016 12/16/2016

IP Occupational ALARA Planning and Controls 71124.02 12/12/2016 12/16/2016

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 12/12/2016 12/16/2016

IP Occupational Dose Assessment 71124.04 12/12/2016 12/16/2016

IP Radiation Monitoring Instrumentation 71124.05 12/12/2016 12/16/2016

IP Occupational Exposure Control Effectiveness 71151-OR01 12/12/2016 12/16/2016

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/12/2016 12/16/2016 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 08/12/2016 09:09:07 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 07/01/2016 - 06/30/2018 71152B

- PI&R BIENNIAL

1 IP Problem Identification and Resolution 71152B 01/30/2017 02/03/2017

IP Problem Identification and Resolution 71152B 02/13/2017 02/17/2017 MODS

- PERMANENT PLANT MODIFICATIONS

1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 03/13/2017 03/17/2017

IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 03/27/2017 03/31/2017 EP

- EP PROGRAM INSPECTION

1 IP Alert and Notification System Testing 7111402 05/15/2017 05/19/2017

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/15/2017 05/19/2017

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/15/2017 05/19/2017

IP Performance Indicator Verification 71151 05/15/2017 05/19/2017 7111107T

- TRIENNIAL HEAT SINK

1 IP Heat Sink Performance 7111107T 06/19/2017 06/23/2017 71124

- RADIATION PROTECTION - EFFLUENTS

1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/10/2017 07/14/2017 2/12EXAM

- HOPE CREEK INITIAL EXAM

1 FY18 HOPE CREEK EXAM (FEBRUARY 2018)

U01958 01/08/2018 01/12/2018

FY18 HOPE CREEK EXAM (FEBRUARY 2018)

U01958 02/12/2018 02/23/2018 71124

- RADIATION PROTECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/24/2017 07/28/2017

IP Occupational ALARA Planning and Controls 71124.02 07/24/2017 07/28/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 07/24/2017 07/28/2017

IP Occupational Dose Assessment 71124.04 07/24/2017 07/28/2017

IP Radiation Monitoring Instrumentation 71124.05 07/24/2017 07/28/2017 ISFSI

- ISFSI LOADING CAMPAIGN INSPECTION

1 IP Operation Of An ISFSI 60855 08/07/2017 08/11/2017

IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 08/07/2017 08/11/2017 71124

- RADIATION PROTECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/02/2017 10/06/2017

IP Occupational ALARA Planning and Controls 71124.02 10/02/2017 10/06/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/02/2017 10/06/2017

IP Occupational Dose Assessment 71124.04 10/02/2017 10/06/2017

IP Radiation Monitoring Instrumentation 71124.05 10/02/2017 10/06/2017 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 08/12/2016 09:09:07 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 07/01/2016 - 06/30/2018 71124.08

- RADWASTE

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/04/2017 12/08/2017 71124

- RADIATION PROTECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/04/2017 12/09/2017

IP Occupational ALARA Planning and Controls 71124.02 12/04/2017 12/09/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 12/04/2017 12/09/2017

IP Occupational Dose Assessment 71124.04 12/04/2017 12/09/2017

IP Occupational Exposure Control Effectiveness 71151-OR01 12/04/2017 12/09/2017

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/04/2017 12/09/2017 U1 ISI

- UNIT 1 INSERVICE INSPECTION

1 IP Inservice Inspection Activities - BWR 7111108G 04/16/2018 04/20/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.