2009 EOC Hope Creek Annual Assessment Letter and Report 22
ML100620850
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/03/2010
From: Arthur Burritt
Reactor Projects Branch 3
To: Joyce T
Public Service Enterprise Group
BURRITT, AL
References
IR-10-001
Download: ML100620850 (5)


Text

UNITED ST.~TES NUCLEAR REGULATORY COMMISSION REGION I 475 AllENDALE ROAD KING 01" PRUSSIA, PENNSYLVANIA 19406.1415 March 3, 2010 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUB~IECT: ANNUAL ASSESSMENT LETTER - HOPE CREEK GENERATING STATION (05000354/2010001 )

Dear Mr. Joyce:

On February 9, 2010, the NRC staff completed its performance review of Hope Creek Generating Station (Hope Creek). Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspE~ction plan.

Overall, Hope Creek operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and aU Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The staff identified that there were four green inspection findings for the current 12-month assessment period in the area of human performance with a documented cross-cutting aspect of procedural compliance (H.4{b>>1. This theme was first identified in May 2009. In evaluating your scope of efforts and progress in addressing this cross-cutting theme, the staff determined that you identified the problem with procedural compliance, recognized that the problem affected multiple areas, performed a common cause evaluation, and initiated appropriate corrective actions. The staff judged these actions to be effective based on no new NRC findings related to procedure compliance in the last six months as well as a reduction in the number of less significant issues as tracked by your human performance related metrics. Therefore, the staff has concluded that a substantive cross-cutting issue in human performance does not exist at this time.

1 This is a descriplorthat correlates to this Cfoss-eutting aspect in Inspection Manual Chapter 0310. "Components Within the Cross-Cutting Areas'

T. Joyce 2 The enclosed inspection plan details the inspections, fess those related to physical protection scheduled through June 30, 2011. In addition to the baseline inspections, we plan to conduct an inspection related to license renewal. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last ninE~ months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.govlreading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57 cc: w/encls: Distribution via ListServ Hope Creek Generating Station Inspection/Activity Plan

T. Joyce 3 The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2011. In addition to the baseline inspections, we plan to conduct an inspection related to license renewal. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http:/twww.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan. we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely.

IRAJ Arthur L Burritt. Chief Division of Reactor Projects Projects Branch 3 Oistribution w/encl:

S. Collins, RA R. Moore, DRP N. Sheehan, PAO M. Oapas, ORA B. Welling, DRP, SRI R. Barkley, ORA D. Lew. DRP A. Patel, DRP, RI John Thompson, NRR J. Clifford, DRP DRS Director L Troclne, RI OEDO A. Burritt, DRP DRS Deputy Dir RidsNRRPMHopeCreek Resource L. Cline, DRP DRS Branch Chiefs (o) RldsNrrQlrslpabRes@nrc.gov A. Turilin, DRP D.Silk, DRS ROPreportsResource@nrc.gov D. Serenci, PAO SUNSI Review Complete: ALB (Reviewer's Initials) ML100600850 DOC NAME: S:\ROP-10 EOC REVIEw\BRANCH 3\LETTERS\2009 EOC - HOPE CREEK ASSESSMENT LETTERREV1.DOC After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: 'C'" Copy without a<<achmenlfenclosure 'EO =Copy wi1h atlachmentlenclosure 'N"" No copy OFFICE RIIDRP I RI/DRP I RI/DRP I NAME BWelling! ALB for LCline/ ALB for ABurrittl ALB DATE 02/24/09 02124/09 03/02/09 OFFICIAL RECORD COpy

Page 1 of2 Hope Creek 0212412010:,-,7 11:18:11 Inspection I Activity Plan Report 22 01/01{2010 - 06/30/2011 Planned Dates Start End Title 71124

  • RETS 1 01/25{2010 01/29/2010 IP 71124.05 Radiation Monitoring Instrumentation 01/25/2010 0112912010 IP 71124.06 Radioactive Gaseous and liquid Effluent Treatment TI.180 - PROCEDURES & PROCESSES* MANAGING FATIGUE 1 02/2312010 0212312010 IP 2515/180 Inspection of Procedures and Processes for Managing Fatigue 71124
  • HP 1 03/0112010 03/05/2010 IP 71124.01 Radiological Haz.ard Assessment and Exposure Controls 03/01/2010 03105/2010 IP 71124.02 Occupational ALARA Planning and Controls 03/0112010 03/05/2010 IP 71124.04 Occupational Dose Assessment TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 4 03/22/2010 03/26/2010 IP 7111105T Fire Protection [Triennial]

04/05/2010 04'09/2010 IP 7111105T Fire Protection [Triennial]

8/23EXAM

  • INITIAL OPERATOR LICENSING EXAM 4 07/2612010 07/30/2010 U01788 FY10 - HOPE CREEK OPERATOR LICENSING EXAM 0812312010 09/03/2010 U01788 FY10 - HOPE CREEK OPERATOR LICENSING EXAM EPEX
  • EP EXERCISE EVALUATION 4 05/1712010 05/21/2010 IP 7111401 Exercise Evaluation 05117/2010 05/2H2010 IP 7111404 Emergency Action level and Emergency Plan Changes 05/1712010 05/21/2010 IP 71151-EP01 Dri11lExercise Pertormance 05/17/2010 OS/2112010 IP 71151-EP02 ERO Drill Participation 05/17(2010 05/21/2010 IP 11151-EP03 Alert & Notification System 7111111 - REQUAL INSP WITH P/F RESULTS 3 09/20/2010 09/24/2010 IP 7111111 B Licensed Operator Requalification Program 71002
1. 08/2312010 08/27/2010 IP 71002 License Renewal Inspection TI*177
  • MANAGING GAS ACCUMULATION IN ECCS 3 08/30/2010 09/0312010 IP 251S/1n Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 71124 *HP 1 09113/2010 09/1712010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 09/13/2010 09/17/2010 IP 71124.02 Occupational ALARA Planning and Controls 09/13/2010 0911712010 IP 71124.05 Radiation Monitoring Instrumentation 09/1312010 09/17/2010 lP 71151-0R01 Occupational Exposure Control Effectiveness 09/13/2010 0911712010 IP 71151-PR01 RETS/ODCM Radiological Effluent his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 20f2

.. 1.

Hope Creek 0212412010 11:18:11 Inspection I Activity Plan '.'

Report 22 01/01/2010

  • 06/30/2011 Planned Dates Start End Title
  • &t!BW . . . . . .'" 5!¥t!.&jf 71124 -HP 1 1 10/1812010 10/2212010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 10/18/2010 10/2212010 IP 71124.02 Occupational ALARA Planning and Controls 7111108G -INSERVICE INSPECrlON 1 10/25/2010 1Of29i201 0 IP 7111108G Inservice Inspection Activities - BWR 71152 - PI&R 01/10/2011 01/14/2011 IP 711528 Identification and Resolution of Problems 01/24/2011 01/2812011 IP 711528 Identification and Resolution of Problems 71124 - HP 02/28/2011 03/0412011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 02/2812011 03104/2011 IP 71124.02 Occupational ALARA Planning and Controls 02/28/2011 03/0412011 IP 71124.03 In*Plant Airborne Radioactivity Control and Mitigation EP PROGR - EP PROGRAM INSPECTION 03114/2011 03/18/2011 IP 7111402 Radiological Environmental Monitoring Program 03/1412011 03/1812011 IP 7111403 Emergency Response Organization Augmentation Testing 03(1412011 03/18/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/14/2011 03/1812011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03i14i201 i 03/1812011 IP 71151-EP01 Drill/Exercise Performance 03/1412011 03118/2011 IP 71151*EP02 ERO Drill Participation 03/14/2011 03/1812011 IP 71151*EP03 Alert & Notification System 7111117 - PERMANENT PLANT MODIFICATIONS 3 04/04/2011 04/08/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 04/18/2011 04/22/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111107T - TRIENNIAL HEAT SINK 1 05/16/2011 05/20/2011 IP 7111107T Heat Sink Performance 71124 - HP 1 05/1612011 05/20/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 05116/2011 05/2012011 IP 71124.04 Occupational Dose Assessment 0511612011 05/2012011 IP 71124,05 Radiation Monitoring Instrumentation his report-does not Include INPO and OUTAGEactlvltles.

This report shows only on-site and announced inspection procedures.