IR 05000354/2017005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Hope Creek Generating Station, Unit 1(Report 05000354/2017005)
ML17233A013
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/28/2017
From: Fred Bower
Reactor Projects Branch 3
To: Sena P
Public Service Enterprise Group
References
IR 2017005
Download: ML17233A013 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 August 28, 2017 Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: UPDATED INSPECTION PLAN FOR HOPE CREEK GENERATING STATION UNIT 1 (REPORT 05000354/2017005)

Dear Mr. Sena:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Hope Creek Generating Station Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to baseline inspections, the NRC plans to conduct Inspection Procedure (IP) 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders, as described in Inspection Report 05000354/2017010 (ADAMS Accession No.:

ML17122A282 1). Also, as previously noted in the annual assessment letter dated March 1, 2017 (Report 05000354/2016006; ADAMS Accession No.: ML17058A408), in addition to baseline inspections, the NRC conducted a supplemental inspection in accordance with IP 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, onsite between August 7 and 11, 2017. The results of that inspection and a follow-up assessment letter are expected to be issued within 45 days of the completion of that onsite inspection.

The NRC will also be performing Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket No. 50-354 License No. NPF-57 Enclosure: Hope Creek Inspection Plan cc: Distribution via ListServ

ML17233A013 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/per email MD MDraxton FBower DATE 8/17/17 8/17/17 8/21/17

Page 1 of 2 Hope Creek 08/29/2017 09:29:39 Inspection / Activity Plan Report 22 08/29/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 2/12EXAM - HOPE CREEK INITIAL OL EXAM 5 1 01/08/2018 01/12/2018 U01958 FY18 HOPE CREEK EXAM (FEBRUARY 2018)

1 02/12/2018 02/23/2018 U01958 FY18 HOPE CREEK EXAM (FEBRUARY 2018)

71124 - RAD PROTECTION 1 1 09/18/2017 09/22/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/18/2017 09/22/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 09/18/2017 09/22/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 09/18/2017 09/22/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences T1-191 - FUKUSHIMA LESSONS-LEARNED 4 1 09/18/2017 09/22/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 71124.08 - RADWASTE 1 1 10/16/2017 10/20/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - BASELINE HP 1 1 01/22/2018 01/26/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 01/22/2018 01/26/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 01/22/2018 01/26/2018 IP 71124.04 Occupational Dose Assessment U1 ISI - UNIT 1 INSERVICE INSPECTION 2 1 04/23/2018 04/27/2018 IP 7111108G Inservice Inspection Activities - BWR 71124 - BASELINE HP 1 1 04/30/2018 05/04/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/30/2018 05/04/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 04/30/2018 05/04/2018 IP 71124.04 Occupational Dose Assessment 7111121M - DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1 06/04/2018 06/08/2018 IP 7111121M Design Bases Assurance Inspection (Teams)

1 06/18/2018 06/22/2018 IP 7111121M Design Bases Assurance Inspection (Teams)

71124.07 - REMP 1 1 06/25/2018 06/29/2018 IP 71124.07 Radiological Environmental Monitoring Program REQUAL - HC REQUAL INSP WITH P/F RESULTS 2 1 10/08/2018 10/12/2018 IP 7111111A Licensed Operator Requalification Program - Annual Review 1 10/08/2018 10/12/2018 IP 7111111B Licensed Operator Requalification Program 71124 - BASELINE HP 1 1 11/26/2018 11/30/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/26/2018 11/30/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 11/26/2018 11/30/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Hope Creek 08/29/2017 09:29:39 Inspection / Activity Plan Report 22 08/29/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - BASELINE HP 1 1 11/26/2018 11/30/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 11/26/2018 11/30/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124 - HP 1 1 01/07/2019 01/11/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 01/07/2019 01/11/2019 IP 71124.02 Occupational ALARA Planning and Controls EP - EP PROGRAM INSPECTION 2 1 02/11/2019 02/15/2019 IP 7111402 Alert and Notification System Testing 1 02/11/2019 02/15/2019 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 02/11/2019 02/15/2019 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 02/11/2019 02/15/2019 IP 71151 Performance Indicator Verification 7111105T - TRIENNIAL FIRE PROTECTION 4 1 03/11/2019 03/15/2019 IP 7111105T Fire Protection [Triennial]

1 03/25/2019 03/29/2019 IP 7111105T Fire Protection [Triennial]

71124.06 - RETS 1 1 06/24/2019 06/28/2019 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.