March 2, 2022

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2021006)

Dear Mr. Carr:

The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Hope Creek Generating Station, reviewing performance indicators (PIs),

inspection results, and enforcement actions from January 1, 2021 through December 31, 2021.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Hope Creek Generating Station during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e.,

Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Hope Creek Generating Station.

The enclosed inspection plan lists the inspections scheduled through December 31, 2023.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions and as discussed in our November 2, 2021 memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ADAMS Accession No. ML21295A302), it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.

For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5312 with any questions you have regarding this letter.

Sincerely, Digitally signed by Brice A.

Bickett Brice A. Bickett Date: 2022.03.02 09:15:18-05'00'

Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety Docket No. 05000354 License No. NPF-57 Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

ML22060A094 x Non-Sensitive x Publicly Available x SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DORS RI/DORS NAME GWalbert BBickett DATE 3/1/22 3/1/22

Site Inspection Activity Plan Hope Creek 01/01/2022 - 12/31/2023 Unit Start End Activity CAC Title Staff Count Fire Protection - Hope Creek 3 1 2/14/2022 2/18/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1 2/28/2022 3/4/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

RP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 1 1 2/22/2022 2/25/2022 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Annual PIR Sample - RWCU Leaks due to flow Accelerated Corrosion 1 1 3/7/2022 3/11/2022 IP 71152A 001790 Annual Follow-up Problem Identification and Resolution EP EXERCISE INSPECTION - HOPE CREEK 4 1 5/9/2022 5/13/2022 IP 71114.01 000716 Exercise Evaluation 1 5/9/2022 5/13/2022 IP 71151 001397 Performance Indicator Verification RP Rad Airborne / Dose Assessment 71124.03/.04 1 1 6/6/2022 6/10/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 6/6/2022 6/10/2022 IP 71124.04 000728 Occupational Dose Assessment Access Control, Protective Strat, TSR, SPR, PI- HC 4 1 6/6/2022 6/10/2022 IP 71130.02 000734 Access Control 1 6/6/2022 6/10/2022 IP 71130.05 000737 Protective Strategy Evaluation 1 6/6/2022 6/10/2022 IP 71130.09 001656 Security Plan Changes 1 6/6/2022 6/10/2022 IP 71130.14 000743 Review of Power Reactor Target Sets 1 6/6/2022 6/10/2022 IP 71151 001338 Performance Indicator Verification Design Basis Assurance Inspection - Power Operated Valves - Hope Creek 3 1 7/11/2022 7/15/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1 7/25/2022 7/29/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements RP Rad Environmental Monitoring Program 71124.07 1 1 7/25/2022 7/29/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program FY22 Hope Creek Initial Licensing Examination 4 1 6/26/2022 7/1/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 8/7/2022 8/19/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Cyber Security - Hope Creek 4 1 8/29/2022 9/2/2022 IP 71130.10 000741 Cybersecurity Hope Creek Requal Inspection with P/F Results 2 1 9/12/2022 9/16/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance Prepared on 2/23/2022 12:21:42 PM 1 of 3 Enclosure

Site Inspection Activity Plan 1 9/12/2022 9/16/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Inservice Inspection - Hope Creek 1 1 10/3/2022 10/7/2022 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP Rad Hazard Assessment; Performance Indicator Verification 71124.01/71151 1 1 10/3/2022 10/7/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 10/3/2022 10/7/2022 IP 71151 000746 Performance Indicator Verification ISFSI Operational Inspection (60855) - HC 2 1 1/30/2023 2/3/2023 IP 60855 001001 Operation Of An ISFSI Triennial Heat Sink Inspection - Hope Creek 1 1 2/26/2023 3/4/2023 IP 71111.07T 000700 Heat Exchanger/Sink Performance FORCE-ON-FORCE PLANNING AND EXERCISE - SL/HC 4 1 2/27/2023 3/3/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 3/20/2023 3/24/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP Rad Hazard Assess & Control 71124.01 1 1 3/6/2023 3/10/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls EP PROGRAM INSPECTION - HOPE CREEK 1 1 6/5/2023 6/9/2023 IP 71114.02 000717 Alert and Notification System Testing 1 6/5/2023 6/9/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 6/5/2023 6/9/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 6/5/2023 6/9/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 6/5/2023 6/9/2023 IP 71151 001397 Performance Indicator Verification PI&R Team Inspection - HC 4 1 6/12/2023 6/16/2023 IP 71152B 000747 Problem Identification and Resolution 1 6/26/2023 6/30/2023 IP 71152B 000747 Problem Identification and Resolution 50.59 Team Inspection - Hope Creek 3 1 7/9/2023 7/15/2023 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments RP Rad Instrumentation 71124.05 1 1 7/17/2023 7/21/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation RP Rad Waste Processing and Transportation 71124.08 1 1 9/4/2023 9/8/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Material Control and Accountability - Hope Creek 1 1 9/11/2023 9/15/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)

Access Control, Equipment, Sec Trng, Sec Plan Review, PI-HC 3 1 9/18/2023 9/22/2023 IP 71130.02 000734 Access Control 1 9/18/2023 9/22/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance Prepared on 2/23/2022 12:21:42 PM 2 of 3

Site Inspection Activity Plan 1 9/18/2023 9/22/2023 IP 71130.07 000739 Security Training 1 9/18/2023 9/22/2023 IP 71130.09 001656 Security Plan Changes 1 9/18/2023 9/22/2023 IP 71151 001338 Performance Indicator Verification RP PI Verification IP71151 1 1 11/27/2023 12/1/2023 IP 71151 000746 Performance Indicator Verification Prepared on 2/23/2022 12:21:42 PM 3 of 3