IR 05000354/2018006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Hope Creek Generating Station, Unit 1 (Report 05000354/2018006)
ML19064B374
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/04/2019
From: Brice Bickett
Reactor Projects Branch 3
To: Sena P
Public Service Enterprise Group
References
IR 2018006
Download: ML19064B374 (6)


Text

rch 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION UNIT 1 (REPORT 05000354/2018006)

Dear Mr. Sena:

The NRC has completed its end-of-cycle performance assessment of Hope Creek Generating Station Unit 1 (Hope Creek), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP)

Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Hope Creek.

The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. Furthermore, all the inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5312 with any questions you have regarding this letter.

Sincerely,

/RA/

Brice Bickett, Chief Project Branch 3 Division of Reactor Projects Docket No. 50-354 License No. NPF-57 Enclosure:

Hope Creek Inspection Plan

ML19064B374 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/MH MHenrion BBickett DATE 2/25/19 2/25/19 2/27/19

IP 22 Inspection Activity Plan Report Hope Creek 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count HP 1 1 01/07/2019 01/11/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 01/07/2019 01/11/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 01/07/2019 01/11/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation EP PROGRAM INSPECTION 2 1 02/11/2019 02/15/2019 IP 71114.02 000717 Alert and Notification System Testing 1 02/11/2019 02/15/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 02/11/2019 02/15/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 02/11/2019 02/15/2019 IP 71151 001397 Performance Indicator Verification TRIENNIAL FIRE PROTECTION 4 1 03/11/2019 03/15/2019 IP 71111.05T 000696 Fire Protection (Triennial)

1 03/25/2019 03/29/2019 IP 71111.05T 000696 Fire Protection (Triennial)

MC&A 1 1 05/19/2019 05/25/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)

ACCESS CONTROL, PROTECTIVE STRATEGY, TSR 4 1 06/17/2019 06/21/2019 IP 71130.02 000734 Access Control 1 06/17/2019 06/21/2019 IP 71130.05 000737 Protective Strategy Evaluation 1 06/17/2019 06/21/2019 IP 71130.14 000743 Review of Power Reactor Target Sets 1 06/17/2019 06/21/2019 IP 71151 001338 Performance Indicator Verification PI&R BIENNIAL 4 1 07/15/2019 07/19/2019 IP 71152B 000747 Problem Identification and Resolution 1 07/29/2019 08/02/2019 IP 71152B 000747 Problem Identification and Resolution HOPE CREEK INITIAL OL EXAM 4 1 07/15/2019 07/19/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 08/12/2019 08/23/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

HC RETS 1 1 08/05/2019 08/09/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

2/11/2019 5:43:49 AM

IP 22 Inspection Activity Plan Report Hope Creek 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count HP 1 1 08/19/2019 08/23/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 08/19/2019 08/23/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 08/19/2019 08/23/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 08/19/2019 08/23/2019 IP 71124.04 000728 Occupational Dose Assessment 1 08/19/2019 08/23/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation Unit 1 ISI INSPECTION 1 1 10/20/2019 10/26/2019 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

HP 1 1 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 10/21/2019 10/25/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls Radwaste 1 1 12/02/2019 12/06/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 12/02/2019 12/06/2019 IP 71151 000746 Performance Indicator Verification 50.59 Inspection 3 1 01/13/2020 01/17/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments HP 1 1 02/17/2020 02/21/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 02/17/2020 02/21/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 02/17/2020 02/21/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 02/17/2020 02/21/2020 IP 71124.04 000728 Occupational Dose Assessment 1 02/17/2020 02/21/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS 7 1 02/24/2020 02/28/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 03/16/2020 03/20/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing HOPE CREEK EP EXERCISE INSPECTION 5 1 05/18/2020 05/22/2020 IP 71114.01 000716 Exercise Evaluation 1 05/18/2020 05/22/2020 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

2/11/2019 5:43:49 AM

IP 22 Inspection Activity Plan Report Hope Creek 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count HP 1 1 06/01/2020 06/05/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 06/01/2020 06/05/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 06/01/2020 06/05/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 06/01/2020 06/05/2020 IP 71124.04 000728 Occupational Dose Assessment 1 06/01/2020 06/05/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation Access Control, Equip Perf, Training 3 1 07/06/2020 07/10/2020 IP 71130.02 000734 Access Control 1 07/06/2020 07/10/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 07/06/2020 07/10/2020 IP 71130.07 000739 Security Training 1 07/06/2020 07/10/2020 IP 71151 001338 Performance Indicator Verification PROGRAM INSPECTION 3 1 08/03/2020 08/07/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1 08/17/2020 08/21/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

REMP 1 1 08/03/2020 08/07/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program TRIENNIAL HEAT SINK 1 1 09/21/2020 09/25/2020 IP 71111.07T 000700 Heat Sink Performance -Triennial Hope Creek Requal Inspection with P/F Results 2 1 10/05/2020 10/09/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

1 10/05/2020 10/09/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

HP 1 1 11/30/2020 12/04/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 11/30/2020 12/04/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 11/30/2020 12/04/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 11/30/2020 12/04/2020 IP 71124.04 000728 Occupational Dose Assessment 1 11/30/2020 12/04/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

2/11/2019 5:43:49 AM