August 28, 2018
SUBJECT:
HOPE CREEK GENERATING STATION UNIT 1 UPDATED INSPECTION PLAN (INSPECTION REPORT 05000354/2018005)
Dear Mr. Sena:
The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Hope Creek Generating Station Unit 1 (Hope Creek). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects
Docket No. 50-354 License No. NPF-57
Enclosure:
Hope Creek Inspection Plan
cc: Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DRP RI/DRP RI/DRP
NAME CLally/CML via email JHawkins/JRH via email FBower
DATE 8/15/18 8/15/18 8/28/18
Hope Creek 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count Hope Creek REMP
1 08/27/2018 08/31/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program CYBER FULL IMP
1 09/03/2018 09/07/2018 IP 71130.10P 000741 Cyber Security
09/17/2018 09/21/2018 IP 71130.10P 000741 Cyber Security HC REQUAL INSP WITH P/F RESULTS
1 10/08/2018 10/12/2018 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
10/08/2018 10/12/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
BASELINE HP
1 11/26/2018 11/30/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
11/26/2018 11/30/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls
11/26/2018 11/30/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
11/26/2018 11/30/2018 IP 71151 000746 Performance Indicator Verification HP
1 01/07/2019 01/11/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
01/07/2019 01/11/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls EP PROGRAM INSPECTION
1 02/11/2019 02/15/2019 IP 71114.02 000717 Alert and Notification System Testing
02/11/2019 02/15/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
02/11/2019 02/15/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
02/11/2019 02/15/2019 IP 71151 001397 Performance Indicator Verification TRIENNIAL FIRE PROTECTION
1 03/11/2019 03/15/2019 IP 71111.05T 000696 Fire Protection (Triennial)
03/25/2019 03/29/2019 IP 71111.05T 000696 Fire Protection (Triennial)
1 05/20/2019 05/24/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)
8/14/2018 12:16:52 PM Page 1 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Hope Creek 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count ACCESS CONTROL, PROTECTIVE STRATEGY, TSR
1 06/17/2019 06/21/2019 IP 71130.02 000734 Access Control
06/17/2019 06/21/2019 IP 71130.05 000737 Protective Strategy Evaluation
06/17/2019 06/21/2019 IP 71130.14 000743 Review of Power Reactor Target Sets
06/17/2019 06/21/2019 IP 71151 001338 Performance Indicator Verification PI&R BIENNIAL
1 07/15/2019 07/19/2019 IP 71152B 000747 Problem Identification and Resolution
07/29/2019 08/02/2019 IP 71152B 000747 Problem Identification and Resolution HOPE CREEK INITIAL OL EXAM
1 07/15/2019 07/19/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
08/12/2019 08/23/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
HC RETS
1 08/05/2019 08/09/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment HP
1 08/19/2019 08/23/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
08/19/2019 08/23/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls
08/19/2019 08/23/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
08/19/2019 08/23/2019 IP 71124.04 000729 Occupational Dose Assessment
08/19/2019 08/23/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation Unit 1 ISI INSPECTION
1 10/21/2019 10/25/2019 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
10/21/2019 10/25/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls Radwaste
1 12/02/2019 12/06/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
12/02/2019 12/06/2019 IP 71151 000746 Performance Indicator Verification 8/14/2018 12:16:52 PM Page 2 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Hope Creek 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count 50.59 Inspection
1 01/13/2020 01/17/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments HP
1 02/17/2020 02/21/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
02/17/2020 02/21/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls
02/17/2020 02/21/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
02/17/2020 02/21/2020 IP 71124.04 000729 Occupational Dose Assessment
02/17/2020 02/21/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS
1 02/24/2020 02/28/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
03/16/2020 03/20/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing HOPE CREEK EP EXERCISE INSPECTION
1 05/18/2020 05/22/2020 IP 71114.01 000716 Exercise Evaluation
05/18/2020 05/22/2020 IP 71151 001397 Performance Indicator Verification HP
1 06/01/2020 06/05/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
06/01/2020 06/05/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls
06/01/2020 06/05/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
06/01/2020 06/05/2020 IP 71124.04 000729 Occupational Dose Assessment
06/01/2020 06/05/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 8/14/2018 12:16:52 PM Page 3 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.