March 1, 2017
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2016006)
Dear Mr. Sena:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Hope Creek Generating Station Unit 1 (Hope Creek), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Hope Creek during the most recent quarter was within the Regulatory Response Column (Column 2) of the NRCs Reactor Oversight Process (ROP)
Action Matrix in Inspection Manual Chapter 0305, Operating Assessment Program. This conclusion was based on a single inspection finding related to maintenance of the high-pressure coolant injection system having low-to-moderate safety significance (i.e., White) in the Mitigating Systems Cornerstone, and all PIs within the expected range (i.e., Green). As stated in our final significance determination and follow-up assessment letter (Report 05000354/2016008; ML17033B5411) dated February 06, 2017, the NRC has assessed Hope Creek to be in the Regulatory Response column, retroactive to the third calendar quarter of 2016 when this performance issue was identified. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, after you notify the NRC of your readiness for this inspection. This inspection is conducted to provide assurance that the root causes and contributing causes of any performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.
The enclosed inspection plan lists the inspections scheduled through December 31, 2018.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the
1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. inspection plan are tentative and may be revised. In addition to baseline inspections, the NRC will perform IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, and Temporary Instruction 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Michael L. Scott, Director Division of Reactor Projects
Docket No.: 50-354 License No.: NPF-57
Enclosure:
Hope Creek Inspection/Activity Plan
cc w/encl: Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DRP RI/DRP RI/DRP
NAME RBarkley FBower MScott
DATE 2/22/17 2/27/17 2/27/17/17
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 01/01/2017 - 12/31/2018 Page 1 of 2 02/02/2017 15:25:29 71152B
- PI&R BIENNIAL
1 IP Problem Identification and Resolution 71152B 01/30/2017 02/03/2017
IP Problem Identification and Resolution 71152B 02/13/2017 02/17/2017 ISFSI
- ISFSI LOADING CAMPAIGN INSPECTION
1 IP Operation Of An ISFSI 60855 03/06/2017 03/10/2017
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 03/06/2017 03/10/2017 71124
- RAD PROTECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/27/2017 03/03/2017
IP Occupational ALARA Planning and Controls 71124.02 02/27/2017 03/03/2017
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/27/2017 03/03/2017
IP Radiation Monitoring Instrumentation 71124.05 02/27/2017 03/03/2017 50.59
- EVALS OF CHANGES, TESTS, & EXPERIMENTS
1 IP screenings and/or applicability determinations 7111117T-5059scrn 03/27/2017 03/31/2017 EP
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 06/05/2017 06/09/2017
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/05/2017 06/09/2017
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/05/2017 06/09/2017
IP Performance Indicator Verification 71151 06/05/2017 06/09/2017 7111121N
- EQ PROGRAM
1 IP Component Design Bases Inspection (Programs)
7111121N 05/08/2017 05/12/2017
IP Component Design Bases Inspection (Programs)
7111121N 05/22/2017 05/26/2017 71124.06
- RETS
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/12/2017 06/16/2017 7111107T
- TRIENNIAL HEAT SINK
1 IP Heat Sink Performance 7111107T 06/19/2017 06/23/2017 2/12EXAM
- HOPE CREEK INITIAL EXAM
1 FY18 HOPE CREEK EXAM (FEBRUARY 2018)
U01958 01/08/2018 01/12/2018
FY18 HOPE CREEK EXAM (FEBRUARY 2018)
U01958 02/12/2018 02/23/2018 71124
- RAD PROTECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/31/2017 08/04/2017
IP Occupational ALARA Planning and Controls 71124.02 07/31/2017 08/04/2017 71124
- RAD PROTECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/18/2017 09/22/2017
IP Occupational ALARA Planning and Controls 71124.02 09/18/2017 09/22/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 01/01/2017 - 12/31/2018 Page 2 of 2 02/02/2017 15:25:29 71124
- RAD PROTECTION
1 IP Occupational Exposure Control Effectiveness 71151-OR01 09/18/2017 09/22/2017
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 09/18/2017 09/22/2017 71124.08
- RADWASTE
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/16/2017 10/20/2017 71124
- BASELINE HP
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/22/2018 01/26/2018
IP Occupational ALARA Planning and Controls 71124.02 01/22/2018 01/26/2018
IP Occupational Dose Assessment 71124.04 01/22/2018 01/26/2018 U1 ISI
- UNIT 1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - BWR 7111108G 04/23/2018 04/27/2018 71124
- BASELINE HP
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/30/2018 05/04/2018
IP Occupational ALARA Planning and Controls 71124.02 04/30/2018 05/04/2018
IP Occupational Dose Assessment 71124.04 04/30/2018 05/04/2018 71124.07
- REMP
1 IP Radiological Environmental Monitoring Program 71124.07 06/25/2018 06/29/2018 7111121M
- DESIGN BASES ASSURANCE INSPECTION (TEAM)
1 IP Component Design Bases Inspection (Teams)
7111121M 07/16/2018 07/20/2018
IP Component Design Bases Inspection (Teams)
7111121M 07/30/2018 08/03/2018 REQUAL
- HC REQUAL INSP WITH P/F RESULTS
1 IP Licensed Operator Requalification Program - Annual Review 7111111A 10/08/2018 10/12/2018
IP Licensed Operator Requalification Program 7111111B 10/08/2018 10/12/2018 71124
- BASELINE HP
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/26/2018 11/30/2018
IP Occupational ALARA Planning and Controls 71124.02 11/26/2018 11/30/2018
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/26/2018 11/30/2018
IP Occupational Exposure Control Effectiveness 71151-OR01 11/26/2018 11/30/2018
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/26/2018 11/30/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.