ary 28, 2018

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION UNIT 1 (REPORTS 05000354/2017006, 05000354/2017402, AND 05000354/2017501)

Dear Mr. Sena:

The NRC has completed its end-of-cycle performance assessment of Hope Creek Generating Station Unit 1 (Hope Creek), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP)

Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Hope Creek.

As of August 30, 2017, Hope Creek transitioned to the Licensee Response Column after the successful completion of a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, on August 11, 2017. The results of this inspection are documented in NRC Supplemental Inspection Report 05000354/2017011 (ML17242A220) dated August 30, 2017.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room)

Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

David L. Pelton, Acting Director Division of Reactor Projects Docket No. 50-354 License No. NPF-57 Enclosure: Hope Creek Inspection Plan

ML18058A106 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP JHawkins/per email NAME MDraxton FBower DPelton MD DATE 2/22/18 2/22/18 2/22/18 2/28/18

IP 22 Inspection Activity Plan Report Hope Creek 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count HOPE CREEK INITIAL OL EXAM 5 1 01/08/2018 01/12/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 02/12/2018 02/23/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

BASELINE HP 1 1 01/22/2018 01/26/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 01/22/2018 01/26/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 01/22/2018 01/26/2018 IP 71124.04 000728 Occupational Dose Assessment ACCESS CONTROL, EQUIP PERF, TRAINING 3 1 03/26/2018 03/30/2018 IP 71130.02 000734 Access Control 1 03/26/2018 03/30/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 03/26/2018 03/30/2018 IP 71130.07 000739 Security Training 1 03/26/2018 03/30/2018 IP 71151 001338 Performance Indicator Verification UNIT 1 INSERVICE INSPECTION 1 1 04/23/2018 04/27/2018 IP 71111.08G 000701 Inservice Inspection Activities - BWR BASELINE HP 1 1 04/30/2018 05/04/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 04/30/2018 05/04/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 04/30/2018 05/04/2018 IP 71124.04 000728 Occupational Dose Assessment DBAI - Team 4 1 06/04/2018 06/08/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1 06/18/2018 06/22/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

Hope Creek REMP 1 1 08/27/2018 08/31/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program CYBER FULL IMP 4 1 09/03/2018 09/07/2018 IP 71130.10P 000741 Cyber Security 1 09/17/2018 09/21/2018 IP 71130.10P 000741 Cyber Security This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

2/22/2018 7:12:43 AM

IP 22 Inspection Activity Plan Report Hope Creek 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count HC REQUAL INSP WITH P/F RESULTS 2 1 10/08/2018 10/12/2018 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual 1 10/08/2018 10/12/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial BASELINE HP 1 1 11/26/2018 11/30/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 11/26/2018 11/30/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 11/26/2018 11/30/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 11/26/2018 11/30/2018 IP 71151 000746 Performance Indicator Verification HP 1 1 01/07/2019 01/11/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 01/07/2019 01/11/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls EP PROGRAM INSPECTION 2 1 02/11/2019 02/15/2019 IP 71114.02 000717 Alert and Notification System Testing 1 02/11/2019 02/15/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 02/11/2019 02/15/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 02/11/2019 02/15/2019 IP 71151 001397 Performance Indicator Verification TRIENNIAL FIRE PROTECTION 4 1 03/11/2019 03/15/2019 IP 71111.05T 000696 Fire Protection (Triennial)

1 03/25/2019 03/29/2019 IP 71111.05T 000696 Fire Protection (Triennial)

MC&A 1 1 05/20/2019 05/24/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)

ACCESS CONTROL, PROTECTIVE STRATEGY, TSR 4 1 06/17/2019 06/21/2019 IP 71130.02 000734 Access Control 1 06/17/2019 06/21/2019 IP 71130.05 000737 Protective Strategy Evaluation 1 06/17/2019 06/21/2019 IP 71130.14 000743 Review of Power Reactor Target Sets 1 06/17/2019 06/21/2019 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

2/22/2018 7:12:43 AM

IP 22 Inspection Activity Plan Report Hope Creek 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count PI&R BIENNIAL 4 1 07/15/2019 07/19/2019 IP 71152B 000747 Problem Identification and Resolution 1 07/29/2019 08/02/2019 IP 71152B 000747 Problem Identification and Resolution HOPE CREEK INITIAL OL EXAM 4 1 07/15/2019 07/19/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 08/12/2019 08/23/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

HC RETS 1 1 08/05/2019 08/09/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment HP 1 1 08/19/2019 08/23/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 08/19/2019 08/23/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 08/19/2019 08/23/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 08/19/2019 08/23/2019 IP 71124.04 000729 Occupational Dose Assessment 1 08/19/2019 08/23/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation Radwaste 1 1 10/07/2019 10/11/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 10/07/2019 10/11/2019 IP 71151 000746 Performance Indicator Verification 1R22 ISI INSPECTION 1 1 10/21/2019 10/25/2019 IP 71111.08G 000701 Inservice Inspection Activities - BWR HP 1 1 11/04/2019 11/08/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 11/04/2019 11/08/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

2/22/2018 7:12:43 AM