|
---|
Category:Inspection Plan
MONTHYEARIR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23118A1032023-04-28028 April 2023 PI&R Inspection Document Request IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) IR 05000354/20220052022-08-31031 August 2022 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2022005) ML22103A0662022-04-13013 April 2022 Information Request to Support Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000354/2022012 IR 05000354/20210062022-03-0202 March 2022 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2021006) ML21300A0222021-10-27027 October 2021 Notification of Conduct of a Fire Protection Team Inspection IR 05000354/20210052021-09-0101 September 2021 Updated Inspection Plan for the Hope Creek Nuclear Generating Station (Report 05000354/2021005) IR 05000354/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000354/2020005) IR 05000354/20190062020-03-0303 March 2020 Annual Assessment Letter for Hope Creek Generating Station, Unit 1 (Report 05000354/2019006) IR 05000354/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000354/2019005) ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency IR 05000354/20180062019-03-0404 March 2019 Annual Assessment Letter for Hope Creek Generating Station, Unit 1 (Report 05000354/2018006) ML18340A2492018-12-0303 December 2018 Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information IR 05000354/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000354/2018005) IR 05000354/20170062018-02-28028 February 2018 Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Reports 05000354/2017006, 05000354/2017402, and 05000354/2017501) IR 05000354/20170052017-08-28028 August 2017 Updated Inspection Plan for Hope Creek Generating Station, Unit 1(Report 05000354/2017005) IR 05000354/20160062017-03-0101 March 2017 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2016006) IR 05000354/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Hope Creek Generating Station Report (05000354/2016005) IR 05000354/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2015006) IR 05000354/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Hope Creek Generating Station (Report 05000354/2015005) IR 05000354/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2014001) IR 05000354/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000354/2014006 IR 05000354/20130012014-03-0404 March 2014 ROP-14 2013 Hope Creek Generating Station Annual Assessment Letter, Report 05000354-13-001, and Inspection Plan IR 05000354/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000354-13-006 IR 05000354/20120012013-03-0404 March 2013 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354-12-001) ML12334A0052012-11-28028 November 2012 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML12248A0422012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Hope Creek Generating Station, Unit 1 IR 05000354/20110012012-03-0505 March 2012 Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Report 05000354/2011001) ML1124113152011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Hope Creek Generating Station IR 05000354/20100012011-03-0404 March 2011 Annual Assessment Letter for Hope Creek Generating Station, EOC-11 (05000354-10-001) ML1024403372010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Hope Creek Generating Station ML1006208502010-03-0303 March 2010 2009 EOC Hope Creek Annual Assessment Letter and Report 22 IR 05000354/20090012009-03-0404 March 2009 Annual Assessment Letter - Hope Creek Nuclear Generating Station (05000354-09-001) ML0824607952008-09-0202 September 2008 2008 Mid-Cycle Performance Review and Inspection Plan - Hope Creek Generating Station IR 05000354/20080012008-03-0303 March 2008 2007 Annual Assessment Letter - Hope Creek (05000354/2008001) ML0724309452007-08-31031 August 2007 Mid-Cycle Review and Inspection Plan IR 05000354/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Hope Creek Generating Station (Report 05000354-07-001) IR 05000354/20060012006-03-0202 March 2006 Annual Assessment Letter - Hope Creek Nuclear Generating Station (Report 05000354/2006001) ML0424402332004-08-30030 August 2004 Hope Creek ROP5 Mid-Cycle Performance Review and Inspection Plan LR-N04-0036, Correction PSEG Letter LR-N04-0036, Risk-Informed Inservice Inspection Submittal2004-03-11011 March 2004 Correction PSEG Letter LR-N04-0036, Risk-Informed Inservice Inspection Submittal ML0406308562004-03-0303 March 2004 2003-04 Annual Assessment Letter - Hope Creek ML0323904242003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Hope Creek Generating Station ML0306207722003-03-0303 March 2003 2003 Annual Assessment Letter - Hope Creek Nuclear Generating Station ML0223501752002-08-23023 August 2002 2002 Hope Creek Mid-Cycle Performance Review and Inspection Plan IR 05000354/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Hope Creek Nuclear Plant (Report 50-354/02-001) 2023-08-31
[Table view] Category:Letter
MONTHYEARIR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 2024-02-01
[Table view] |
Text
March 3, 2003 Mr. Harold W. Keiser Chief Nuclear Officer and President PSEG LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
ANNUAL ASSESSMENT LETTER - HOPE CREEK NUCLEAR GENERATING STATION (Report 50-354/2003-001)
Dear Mr. Keiser:
On February 6, 2003, the NRC staff completed its end-of-cycle plant performance assessment of Hope Creek. The end-of-cycle review for Hope Creek involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
Overall, Hope Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. Plant performance for the most recent quarter and during the previous three quarters was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through March 31, 2004.
Additionally, the staff has identified a substantive cross-cutting issue in the area of problem identification and resolution (PI&R), particularly regarding ineffective problem evaluations and untimely, ineffective corrective actions. Numerous inspection findings documented shortcomings within the problem identification and resolution area, and these shortcomings enabled problems to recur and longstanding problems to go uncorrected. The most noteworthy examples included an inservice test failure of a standby liquid control (SLC) pump in October 2002, which represented a repetition of a similar test failure of the other SLC pump in March 2002, and a February 2002 incident on the standby service water (SW) pump, which represented a recurrence of a similar February 2001 standby SW pump event. Further, there were multiple occasions in which problems were not promptly identified.
Mr. Harold W. Keiser 2 We also note that the same overall corrective action program is concurrently implemented at both Hope Creek and Salem, and that both stations have experienced an adverse PI&R trend. This appears to indicate that program improvements to address these trends will need to be broadly based and site-wide to improve PI&R performance at Hope Creek, as well as at Salem Units 1 and
- 2. We plan to closely monitor your performance in the PI&R area.
The enclosed inspection plan details the inspections scheduled through March 31, 2004. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival on-site. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last six months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.
As you are aware, since the terrorist attacks on September 11, 2001, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness.
We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2003, we plan to continue these inspections, conduct portions of the security baseline inspection program, as well as perform additional inspections to evaluate your compliance with new requirements that may be ordered. Based on our final determinations in this regard, we will notify you of any inspection plan changes.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5211 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Glenn Meyer, Chief Projects Branch 3 Division of Reactor Projects Docket No. 50-354 License No. NPF-57
Enclosure:
Hope Creek Inspection/ Activity Plan
Mr. Harold W. Keiser 3 cc w/encl:
M. Friedlander, Director - Business Support J. Carlin, Vice President - Engineering D. Garchow, Vice President - Projects and Licensing G. Salamon, Manager - Licensing T. O'Connor, Vice-President - Operations R. Kankus, Joint Owner Affairs J. J. Keenan, Esquire Consumer Advocate, Office of Consumer Advocate F. Pompper, Chief of Police and Emergency Management Coordinator M. Wetterhahn, Esquire N. Cohen, Coordinator - Unplug Salem Campaign E. Gbur, Coordinator - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance State of New Jersey State of Delaware
Mr. Harold W. Keiser 4 Distribution w/encl:
Region I Docket Room (with concurrences)
J. Schoppy - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA G. Meyer, DRP S. Barber, DRP DRS Director, Region I J. Furia, DRS G. Smith, DRS N. McNamara, DRS B. Platchek, DRP T. McGinty, OEDO J. Clifford, NRR G. Wunder, PM, NRR R. Fretz, Backup PM, NRR RidsNrrDipmIipb Institute of Nuclear Power Operations (INPO)
DOCUMENT NAME: G:\BRANCH3\ROP3 EOC Information\HC ROP-3 EOC Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE R1/DRP R1/DRP R1/DRP R1/DRP NAME SBarber /GSB/ JSchoppy /GSB for/ GMeyer /GWM/ ABlough /ARB/
DATE 02/28/03 02/28/03 02/28/03 02/28/03 OFFICIAL RECORD COPY
Page 1 of 2 Hope Creek 02/25/2003 10:47:01 Inspection / Activity Plan Report 22 12/29/2002 - 03/27/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 01/06/2003 01/10/2003 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 01/06/2003 01/10/2003 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/06/2003 01/10/2003 Baseline Inspections 7111117B - MODS 3 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/13/2003 01/17/2003 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 01/13/2003 01/17/2003 Baseline Inspections 3/17 EXM - OPERATOR LICENSING LSRO INTIAL EXAMS 3 1 U01494 HOPE CREEK LSRO INITIAL EXAM (3/17/03) 02/02/2003 02/07/2003 Not Applicable 1 U01494 HOPE CREEK LSRO INITIAL EXAM (3/17/03) 03/17/2003 03/21/2003 Not Applicable 7112203 - PUB RAD SAFETY - REMP 1 1 IP 7112203 Radiological Environmental Monitoring Program 02/10/2003 02/14/2003 Baseline Inspections 7111111B - L.O. REQUALIFICAITON PROGRAM (LSRO) 2 1 IP 7111111B Licensed Operator Requalification 02/03/2003 02/06/2003 Baseline Inspections 1 IP 7111111B Licensed Operator Requalification 11/11/2003 11/13/2003 Baseline Inspections 7111108 - INSERVICE INSPECTION 1 1 IP 7111108G Inservice Inspection Activities - BWR 04/21/2003 04/25/2003 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/21/2003 04/25/2003 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/21/2003 04/25/2003 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/21/2003 04/25/2003 Baseline Inspections 6/16 EXM - OPERATOR LICENSING INITIAL EXAMS 4 1 U01499 HOPE CREEK INITIAL EXAM (6/17/03) 05/19/2003 05/23/2003 Not Applicable 1 U01499 HOPE CREEK INITIAL EXAM (6/17/03) 06/16/2003 06/20/2003 Not Applicable 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 08/18/2003 08/22/2003 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 08/18/2003 08/22/2003 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/18/2003 08/22/2003 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/18/2003 08/22/2003 Baseline Inspections 7113003 - RESPONSE TO CONTINGENCIES 2 1 IP 7113003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy) 09/08/2003 09/12/2003 Baseline Inspections 71152B - PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP 71152B Identification and Resolution of Problems 11/17/2003 11/21/2003 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 12/08/2003 12/12/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Hope Creek 02/25/2003 10:47:01 Inspection / Activity Plan Report 22 12/29/2002 - 03/27/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111111B - L.O. REQUALIFICATION PROGRAM 1 1 IP 7111111B Licensed Operator Requalification 11/11/2003 11/12/2003 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 11/17/2003 11/21/2003 Baseline Inspections 71114 - EP PROGRAM INSP & PI VERIFICATION 1 1 IP 7111402 Alert and Notification System Testing 12/07/2003 12/11/2003 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 12/07/2003 12/11/2003 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/07/2003 12/11/2003 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 12/07/2003 12/11/2003 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/07/2003 12/11/2003 Baseline Inspections 71122.02 - RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 12/15/2003 12/19/2003 Baseline Inspections 7111112B - MAINTENANCE RULE 1 1 IP 7111112B Maintenance Effectiveness 01/12/2004 01/16/2004 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/23/2004 02/27/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 02/23/2004 02/27/2004 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/23/2004 02/27/2004 Baseline Inspections 7111107B - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 03/01/2004 03/05/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.