BVY 04-089, Follow-Up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan

From kanterella
Jump to navigation Jump to search

Follow-Up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan
ML042440242
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 08/27/2004
From: Thayer J
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
BVY 04-089, TAC MC2984
Download: ML042440242 (2)


Text

Entergy Nuclear Northeast AEntergy Nuclear Operations, Inc.

Vermont Yankee 185 Old Ferry Rd.

P.O. Box 500 terffi fBrattleboro, VT 05302 Tel 802-257-5271 SAFEGUARDS INFORMATION August 27, 2004 Vermont Yankee Docket No. 50-271 BVY 04-089 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Follow-up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan (TAC No. MC2984)

References:

(1) USNRC letter Robert J. Fretz to Jay K. Thayer dated June 16, 2004 regarding Request for Additional Information Re: Security Plan Sections 10-19 (TAC No. MC2984), NVY 04-054 (2) USNRC letter Robert J. Fretz to Jay K. Thayer dated June 25, 2004 regarding Request for Additional Information Re: Security Plan Sections 1-9 (TAC No. MC2984), NVY 04-055 (3) USNRC letter Robert J. Fretz to Jay K. Thayer dated July 23, 2004 regarding Request for Additional Information Re: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC No. MC2984), NW 04-072 (4) Entergy Nuclear Operations, Inc. letter to U.S. Nuclear Regulatory Commission dated July 8, 2004 regarding Response to Request for Additional Information Re: Security Plan Sections 10-19 (TAC No.

MC2984), BVY 04-063 (5) Entergy Nuclear Operations, Inc. letter to U.S. Nuclear Regulatory Commission dated July 13, 2004 regarding Response to Request for Additional Information Re: Security Plan Sections 1-9 (TAC No.

MC29841, BVY 04-064 SAFEGUARDS INFORMATION NOTICE: ATTACHMENT 1 CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER AND ATTACHMENT 2, THIS LETTER AND ATTACHMENT 2 BECOME

'DECONTROLLED."

-" DSiAQS

SAFEGUARDS INFORMATION (6) Entergy Nuclear Operations, Inc. letter to U.S. Nuclear Regulatory Commission dated August 12, 2004 regarding Response to Request for Additional Information Re: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC No. MC2984),

BVY 04-082 (7) USNRC letter N. Diaz to J. Colvin dated August 6, 2004 regarding Position on Vehicle Searches and SDent Fuel Sabotage Entergy Nuclear Operations, Inc., (ENO), Vermont Yankee (VY) Nuclear Power Station is in receipt of your requests for additional information (RAls) (References 1, 2, and 3).

Our initial responses to these RAls (References 4, 5, and 6) identified a number of issues which were considered to be generic issues that were to be resolved using the security frequently asked question (FAQ) process.

Those generic issues have now been resolved using the FAQ process. The responses in this letter complete our responses to the NRC RAls by agreeing to adopt the agreed upon language for the generic RAls. Each RAI, for which we are updating our response, is identified by the Physical Security Plan (PSP) or Safeguards Contingency Plan (SCP) section number referenced in the original RAI.

This letter contains one new commitment which is listed in Attachment 2. As noted in references 4, 5 and 6 revised plan pages will be submitted when all RAI questions are resolved.

If you have any questions or require additional information, please contact Mitch McCluskie at (802) 258-4187.

I declare under penalty of perjury that the foregoing is true and correct. Executed on August 27, 2004.

Sincerely, 47 Jay K.Thayer Site Vice President Entergy Nuclear Operations, Inc Vermont Yankee Nuclear Power Station SAFEGUARDS INFORMATION NOTICE: ATTACHMENT I CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT I FROM THIS LETTER AND ATTACHMENT 2, THIS LETTER AND ATTACHMENT 2 BECOME ODECONTROLLED."