BVY 04-115, Second Updated Submittal of Security Plan

From kanterella
Jump to navigation Jump to search

Second Updated Submittal of Security Plan
ML042940628
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/18/2004
From: Thayer J
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
BVY 04-115, EA-03-086, NEI-03-12, TAC MC2984
Download: ML042940628 (3)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

- Vermont Yankee A=En tergy 185 Old Ferry Rd.

P.O. Box 500 Brattleboro, VT 05302 Tel 802-257-5271 SAFEGUARDS INFORMATION October 18, 2004 Vermont Yankee Docket No. 50-271 BVY 04-115 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Second Updated Submittal of Security Plan (TAC No. MC2984)

References:

(1) Entergy Nuclear Operations, Inc. letter to U.S. Nuclear Regulatory Commission dated September 9, 2004 regarding Re-submittal of Security Plan (TAC No. MC2984), BVY 04-094 Entergy Nuclear Operations, Inc., (ENO), Vermont Yankee (VY) Nuclear Power Station has re-submitted the VY Security Plan in its entirety (Reference 1) incorporating changes made in response to your requests for additional information (RAIs). Further communication with the NRC Review Team has resulted in the need for additional changes to the plan. These changes are limited to Physical Security Plan Section 7 and Appendix A, and Safeguards Contingency Plan Sections 7.4.1 and 7.5.

The updated version of the VY Physical Security Plan, Security Guard Training and Qualification Plan and Safeguards Contingency Plan is provided in its entirety as Attachment 1 to this letter. The submittal consists of this letter and a single CD-ROM.

The CD-ROM contains four files, each of which is presented in .pdf format:

001 Transmittal Letter.pdf (-95,700 bytes) 002 Attachment 1, Security Plan.pdf (892,684 bytes) 003 Signed Security Plan Cover Page.pdf (89,436 bytes)

SAFEGUARDS INFORMATION NOTICE: ATTACHMENT 1 CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."

_) Slgd5

SAFEGUARDS INFORMATION In order to standardize our fleet approach with the NRC-approved industry approach, ENO's responses to Order EA-03-086 and requests for additional information were strictly based on NEI-03-12, "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan' Revision I and subsequent guidance provided by NEI and approved by the staff.

If you have any questions or require additional information, please contact Mitch McCluskie at (802) 258-4187.

I declare under penalty of perjury that the foregoing is true and correct. Executed on October 18, 2004.

Jay K. Thayer Site Vice President Entergy Nuclear Operations, Inc Vermont Yankee Nuclear Power Station Attachments:

1. Vermont Yankee Physical Security Plan, Security Guard Training and Qualification Plan and Safeguards Contingency Plan w/o attachments cc: Mr. Richard B. Ennis, Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Mail Stop 0 8 B1 Washington, DC 20555 SAFEGUARDS INFORMATION NOTICE: ATTACHMENT 1 CONTAINS "SAFEGUARDS INFORMATION' AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES -DECONTROLLED."

SAFEGUARDS INFORMATION Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Governor Hunt Road (for package delivery)

P.O. Box 157 (for mail delivery)

Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601 SAFEGUARDS INFORMATION NOTICE: ATTACHMENT 1 CONTAINS 'SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES 'DECONTROLLED."