Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: BVY 06-014, E-mail, Meyer, Entergy, to Ennis, NRR, VY EPU, BVY 06-019, Extended Power Uprate - Regulatory Commitment Information Regarding Steam Dryer Monitoring and FIV Effects, BVY 06-031, To Steam Dryer Monitoring Plan, BVY 06-039, Revision 2 to Steam Dryer Monitoring Plan, BVY 06-051, Summary of Reactor Feedwater Pump Trip Analysis, BVY 06-056, Submittal of Vermont Yankee Report on the Results of Steam Dryer Monitoring, BVY 06-080, Extended Power Uprate - License Amendment No. 229 Clarifications to NRCs Final Safety Evaluation, BVY 06-087, Update to Information Related to 10CFR50.63 Licensing Basis, BVY-06-056, Attachment 1, Vermont Yankee - Steam Dryer Monitoring Plan Rev. 4, ML033140025, ML033160187, ML040080573, ML040090411, ML041810022, ML041810433, ML042180463, ML042650265, ML042680087, ML043020494, ML043150224, ML050060086, ML050280310, ML050450423, ML050940230, ML050940242, ML052080154, ML052630053, ML053490030, ML053530148, ML060330490, ML060390107, ML061290566
|
MONTHYEARML0323403792003-08-31031 August 2003 Technical Assessment of Quad Cities Unit 2, Steam Dryer Failure - Determination of Root Cause & Extent of Condition Project stage: Request ML0325800892003-09-10010 September 2003 Technical Specification Proposed Change No. 263 Extended Power Uprate Project stage: Request ML0328104472003-10-0101 October 2003 Technical Specification Proposed Change No. 263, Supplemental No. 1 Regarding Extended Power Uprate, Technical Review Guidance Project stage: Request ML0331000472003-10-30030 October 2003 Sign-in Sheet for 10/30/2003 Meeting with ENVY and ENO Re to Discuss Arts/Mellla, Alternate Source Term, and Extended Power Uprate Aplications Project stage: Meeting ML0330403972003-10-30030 October 2003 Meeting Handouts for Meeting with Entergy Re Issues for Alternate Source Term, Power Uprate & Acts/Mellla Application Project stage: Meeting ML0331000232003-11-19019 November 2003 Meeting with Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc Regarding Arts/Mellla, Alternate Source Term, and Extended Power Uprate Applications Project stage: Meeting ML0331800882003-12-15015 December 2003 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0331601872003-12-16016 December 2003 Withholding from Public Disclosure, NEDC-33090P, Revision 0, Project stage: Other ML0430204942003-12-24024 December 2003 NRR Work Request to IEPB-A Project stage: Other ML0336401382003-12-30030 December 2003 Draft Request for Additional Information Project stage: Draft RAI ML0400805732004-01-0707 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other ML0400904112004-01-0909 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other BVY 04-009, Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review2004-01-31031 January 2004 Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review Project stage: Supplement ML0404001612004-02-19019 February 2004 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0405003022004-02-20020 February 2004 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0406306032004-02-27027 February 2004 G20040138/LTR-04-0107 - Sen. James Jeffords & Patrick Leahy Ltr Proposed Power Uprate at Vermont Yankee Project stage: Request ML0408500762004-03-15015 March 2004 G20040206/LTR-04-0168 - Ltr. Rep. Michael Dworkin Independent Safety Asessment of Vermont Yankee Project stage: Request ML0404100222004-03-19019 March 2004 Withholding from Public Disclosure, Responses to Request for Additional Information (Attachment 1 to Letter Bvy 04-008) Project stage: RAI ML0411203582004-03-31031 March 2004 Transcription Meeting Summary, 03/31/2004 Category 3 Meeting with Public to Discuss Proposed Power Uprate, Pages 1-124 Project stage: Meeting ML0411007042004-03-31031 March 2004 Enclosure 1, March 31, 2004, Vermont Yankee Annual Assessment Meeting Power Up-Rate Public Meeting Attendance List Project stage: Meeting ML0411201272004-05-17017 May 2004 Category 3 Public Meeting Summary with Entergy Nuclear Operations Inc. to Discuss Proposed Power Uprate for Vermont Yankee Nuclear Power Station Project stage: Meeting ML0411203682004-05-17017 May 2004 Enclosure 14, 03/31/2004 Meeting Summary for Vermont Yankee. Slides Presentation Proposed Power Uprate Project stage: Meeting ML0410603312004-05-17017 May 2004 Enclosures 3 - 13, 03/31/2004 Meeting Summary for Vermont Yankee Project stage: Meeting ML0414500202004-05-28028 May 2004 Request for Additional Information - Extended Power Uprate Project stage: RAI ML0331400252004-06-25025 June 2004 Vermont, Notice of Consideration of Issuance of Amendment to Facility Operating License for Extended Power Uprate and Opportunity for Hearing Project stage: Other ML0418100222004-06-25025 June 2004 Compliance with NRC Regulatory Compliance Project stage: Other ML0418104332004-06-29029 June 2004 06/29/04 E-mail - Compliance with NRC Regulatory Compliance Project stage: Other ML0420804642004-07-0202 July 2004 Letter Transmitting Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 8, Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0417400392004-07-0606 July 2004 Vermont Nuclear Power Station, Request for Additional Information, Extended Power Uprate. TAC No. MC0761 Project stage: RAI ML0422501402004-07-27027 July 2004 Technical Specification Proposed Change No. 263 - Supplement No. 9, Extended Power Uprate - Revised Containment Overpressure Envelope Project stage: Supplement BVY 04-074, Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2,2004-07-30030 July 2004 Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2, Project stage: Supplement BVY 04-081, Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information2004-08-12012 August 2004 Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0424305662004-08-25025 August 2004 Technical Specification Proposed Change No. 263 - Supplement No. 12, Extended Power Uprate - Revised Grid Impact Study Project stage: Supplement ML0421804632004-08-31031 August 2004 Withholding from Public Disclosure, Project stage: Other ML0424405372004-09-0101 September 2004 Request for Additional Information - Extended Power Uprate Project stage: RAI ML0422200222004-09-0202 September 2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting ML0425103952004-09-0202 September 2004 Attachments 1 Through 4 of 07/21/2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting BVY 04-097, Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items2004-09-14014 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items Project stage: Supplement BVY 04-098, Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information2004-09-15015 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement BVY 04-100, Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 22004-09-23023 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 2 Project stage: Supplement ML0505901452004-09-29029 September 2004 Attendance List for Sept. 29, 2004 Meeting Steam Dryer Analysis Project stage: Meeting BVY 04-113, Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides2004-09-29029 September 2004 Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides Project stage: Supplement BVY 04-107, Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline2004-09-30030 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline Project stage: Supplement BVY 04-101, Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-52004-09-30030 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-5 Project stage: Supplement BVY 04-106, Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin2004-10-0505 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin Project stage: Supplement ML0428904102004-10-0707 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 20, Extended Power Uprate - Meeting on Steam Driver Analysis Project stage: Supplement BVY 04-109, Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program2004-10-0707 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program Project stage: Supplement ML0426800872004-10-13013 October 2004 Technical Audit of Steam Dryer Analysis in Support of Extended Power Uprate Request Project stage: Other ML0426502652004-10-15015 October 2004 Extended Power Uprate Review Schedule Project stage: Other ML0431502242004-11-10010 November 2004 EPU SE Input Section 2.10 Project stage: Other 2004-03-15
[Table View] |
Text
t-Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Vermont Yankee P.O. Box 0500 E
t 185 Old Ferry Road En ter y Brattleboro, VT 05302-0500 Tel 802 257 5271 September 26, 2006 BVY 06-087 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)
Update to information Related to 10CFR50.63 Licensing Basis
References:
- 1) Letter USNRC to Entergy "Vermont Yankee Nuclear Power Station -
Issuance of Amendment Re: Extended Power Uprate (TAC No.
MC0761), NVY 06-028 dated March 2, 2006
- 2) Letter Entergy to USNRC, "Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263, Supplement No.
30, Extended Power Uprate - Response to Request for Additional Information," BVY 05-072, dated August 1, 2005 In Reference (1), NRC approved changes to Entergy's licensing bases relative to satisfying the requirements of 10CFR50.63 "Loss of all Alternating Current Power" (Station Blackout). This relied in part on information Entergy supplied in Reference (2).
In Reference (2), Entergy provided a discussion of the agreements between Entergy and other entities that were in place to ensure that alternating current (AC) power would be available following a Station Blackout (SBO). These agreements included an Alternate AC Source Agreement between Entergy and Green Mountain Power (GMP) and an agreement between GMP and TransCanada (TC) owners and operators of the Vernon Hydro Station. Entergy has become aware, through GMP that TC has notified them of their intent to terminate their contract with GMP. It is our understanding that TC is taking this action because it believes that its obligations are appropriately established by ISO New England requirements. Based on this, GMP has notified Entergy that they will no longer be in a position to continue to satisfy the provisions of our agreement. provides a discussion of the transmission service agreements that are in place to provide reasonable assurance that Entergy will be provided the required SBO power consistent with the current licensing basis.
Entergy does not view this change as a change to our regulatory commitments and does not feel that any NRC action is needed. This letter is provided to update information that was previously provided to reflect changes in the SBO licensing basis.
4Coo
BVY 06-087 Docket No. 50-271 Page 2 of 2 There are no new regulatory commitments contained in this submittal.
If you have any questions or require additional information, please contact Mr. James DeVincentis at (802) 258-4236.
Sincerely, Site Vice President Vermont Yankee Nuclear Power Station Attachments (1) cc:
Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Richard B. Ennis, Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08B1 Washington, DC 20555 Mr. James J. Shea, Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08G9A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601
BVY 06-087 Docket No. 50-271 Vermont Yankee Nuclear Power Station Description of Transmission Service Agreements
BVY 06-087 / Attachment 1 / page 1 of 2 Description of Transmission Service Agreements TransCanada (TC) owns the Vernon Hydro Station (VHS) and provides power to the grid in accordance with Federal Energy Regulatory Commission (FERC) approved Independent System Operator Inc. (ISO) transmission tariffs. The VHS output is delivered to the Vernon Vermont substation which is owned and operated by National Grid (formerly New England Power). This power is provided to Green Mountain Power (GMP) who in turns provides the power to Entergy in accordance with the "Service Agreement for Network Integration Transmission Service Between New England Power Company and Green Mountain Power Corporation", dated July 31, 2002 (Reference 1). This agreement is effective until December 12, 2012.
VHS is designated as a "Black Start" facility in accordance with ISO New England's FERC Transmission Tariff No.3 Schedule 16 "System Restoration and Planning Service from Generators" (Reference 2). VHS has been designated as a Black Start facility, therefore, TC has agreed to a number of requirements including:
- 1) VHS has the capability to be started without the need for any outside power sources in such a way that it will meet all of the requirements stated in ISO New England's Operating procedure 11 "Black Start Capability Eligibility & Testing Requirements."
- 2) VHS is designated Black Start Capable, and accordingly is listed as a Black Start unit in Operating Procedure 11 (Reference 3).
- 3) TC committed to maintain and test VHS as a "Black Start" facility for a period of three years from the date of the last annual black start restoration study and agreed that future commitments are for a period of at least three years.
- 4) TC agreed to give at least one-year notice if they will no longer be able to provide black start power and that this notice would not truncate the commitment to provide power for the period of time already committed to unless it is due to a decision to retire the unit.
Following a blackout event the ISO will control and direct the restoration of power in accordance with ISO Operating Procedure No. 6 "System Restoration" (Reference 4). Appendix A to this procedure provides System Restoration Criteria that are used by the ISO to direct restoration efforts. This includes the dispatch of generators and reenergization of substations, lines and loads. This Appendix states in part "... The most critical power requirement after a blackout is the assurance of reliable shutdowns of nuclear generators. The NRC requires these units to have reliable on-site power sources for shutdown operations. The expeditious restoration of alternative off-site AC power sources to nuclear units is imperative to promote the continued reliability of shutdown operations..." These provisions are discussed and emphasized at regular meetings and at the annual system restoration exercises that Entergy and other ISO New England control area units participate in.
The "Service Agreement for Network Integration Transmission Service Between New England Power Company and Green Mountain Power Corporation" provides assurances that the line that provides power to Entergy's Vermont Yankee station will be energized during normal and emergency operations in accordance with good utility practices and reasonable maintenance schedules subject to the conditions of their rules and regulations. Entergy maintains an awareness of the power supply and has administrative controls to assess the risk should the line or multiple VHS generators need to be taken out of service.
BVY 06-087 / Attachment 1 / page 2 of 2 Entergy has a regulatory commitment (accepted by NRC in Reference 5) to conduct once per operating cycle table-top discussion with the parties involved with blackout system restoration and is confident that we would be made aware of any significant changes to the documents that are discussed above. In addition, Entergy also participates in quarterly ISO sponsored coordination meetings.
Based on this, Entergy believes that the above FERC approved system restoration requirements are adequate to provide reasonable assurance that AC power would be restored to Vermont Yankee consistent with the assumptions in our Current Licensing Basis.
References:
- 1. New England Power Company, FERC Electric Tariff, "Service Agreement for Network Integration Transmission Service Between New England Power Company and Green Mountain Power Corporation", dated July 31, 2002
- 2. Independent System Operator New England Inc. (ISO) FERC Transmission Tariff No.3 Schedule 16 "System Restoration and Planning Service from generators", dated February 1, 2005
- 3. ISO New England Operating Procedure No. 11 "Black Start Capability Testing requirements"
- 4. ISO New England Operating Procedure No. 6 "System Restoration"
- 5. Letter USNRC to Entergy "Vermont Yankee Nuclear Power Station - Issuance of Amendment Re: Extended Power Uprate (TAC No. MC0761), NVY 06-028, dated March 2, 2006