Emergency Plan Implementing Procedure Changes
ML032120414
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/23/2003
From: Tkaczyk L
Entergy Nuclear Northeast, Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
BVY 03-065
Download: ML032120414 (92)


Text

Entergy Nuclear Northeast Vermont Yankee P.O. Box 0500 185 Old Ferry Road

~Entergy Brattleboro, Vr 05302-0500 Tel 802 257 5271 1

July 23, 2003 BVY 03-065 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-27 1)

Vermont Yankee Emergency Plan Implementing Procedure Changes In accordance with 10 CFR 50.54(q), enclosed are the latest changes to the following Vermont Yankee Emergency Plan Implementing Procedures including the change memos and the 10 CFR 50.54(q)

Evaluation Checklists:

OP 3506, Rev. 43 OP 3505, Rev. 24, LPC#2 OP 3547, Rev. 1, LPC#2 These changes were determined to not need prior NRC review and approval.

If you have any questions, please contact Audra Williams, Emergency Planning Coordinator, in our Brattleboro office at (802) 258-4177.

Sincerely, ENTERGY NUCLEAR NORTHEAST VERMONT YANKEE Lori Tkaczyk c1 Emergency Planning Manager Attachments cc: USNRC Region I Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager - VYNPS (no attachments)

David M. Silk, Senior Emergency Preparedness Specialist, USNRC Region I Vermont Department of Public Service 4cq

S U - S S S TCr: E-Plan Implementing Procedure Controlled Set Holders FToom: Technical Support - DCC - Angela M. Hogan ate: 07/23/2003 e: Entergy Vermont Yankee Emergency Plan Implementing Procedure Change 218, Instruction Sheet A new Table of Contents is included.

LPCs: The following LPC should be incorporated into the appropriate procedures:

Proc/Rev # LPC # Procedure Title OP 3505/24 2 Emergency Preparedness Exercises and Drills OP 3547/1 2 Security Actions During an Emergency REVISIONS: The following Revs should replace the appropriate procedures:

Proc/Rev # Procedure Title OP 3506/43 Emergency Equipment Readiness Check

Il, Vermont Yankee Emergency Plan Implementing Procedures Table of Contents July 23,2003 l l Title Number Revision LPC # Use I, Classification Emergency Plan Classification and Action Level Scheme AP 3125 Rev. 19 "Reference" Emergency Communications OP 3504 Rev. 36 1 "Reference" Emergency Preparedness Exercises and Drills OP 3505 Rev. 24 2 "Information" Emergency Equipment Readiness Check OP 3506 Rev. 43 1 "Reference" Emergency Radiation Exposure Control OP 3507 Rev. 30 "Reference" On-Site Medical Emergency Procedure OP 3508 Rev. 23 "Reference" Environmental Sample Collection During an Emergency OP 3509 Rev. 17 "Reference" Off-Site and Site Boundary Monitoring OP 3510 Rev. 27 "Reference" Off-Site Protective Action Recommendations OP 3511 Rev. 12 "Reference" Evaluation of Off-Site Radiological Conditions OP 3513 Rev. 21 "Reference" Emergency Actions to Ensure Initial Accountability and Security OP 3524 Rev. 20 "Reference"

Response

Radiological Coordination OP 3525 Rev. 10 "Reference" Emergency Call-In Method OP 3531 Rev. 16 "Reference" Emergency Preparedness Organization AP 3532 Rev. 11 "Information" Post Accident Sampling of Reactor Coolant OP 3533 Rev. 6 1 "Continuous" Post Accident Sampling of Plant Stack Gaseous Releases OP 3534 Rev. 4 "Continuous" Post Accident Sampling and Analysis of Primary Containment OP 3535 Rev. 4 "Continuous" In Plant Air Sample Analysis with Abnormal Condition OP 3536 Rev. 2 "Continuous" Control Room Actions During an Emergency OP 3540 Rev. 3 "Reference" Activation of the Technical Support Center (TSC) OP 3541 Rev. 2 "Reference" Operation of the Technical Support Center (TSC) OP 3542 Rev. 2 "Reference" Activation of the Operations Support Center (OSC) OP 3543 Rev. 0 "Reference" Operation of the Operations Support Center (OSC) OP 3544 Rev. 3 "Reference" Activation of the Emergency Operations Facility/Recovery Center OP 3545 Rev. 2 "Reference" (EOF/RC)

Operation of the Emergency Operations Facility/Recovery Center OP 3546 Rev. 3 "Reference" (EOF/RC) -

Security Actions During an Emergency OP 3547 Rev. 1 2 "Reference" Emergency Plan Training OP 3712 Rev. 17 "Information" Page 1of I

N'V PREAPPROVED LPC FORM PART 1- Initiation E Converted to Admin. Revision # LPC No: a A. Procedure No.: OP 3505 Current Revision #: 24

Title:

Emergency Preparedness I Exercises and Drills B. Description of Change:

-* Changed Emergency Planning Dnill/Exercise/Training Coordinator (EPDETC) to Emergency Planning Drill/Exercise Coordinator (EPDEC)

  • Removed Dir of Public Affairs & Human Resources C. Reason for Change: D Result of Design Change, Minor Mod, EDCR El Related ER No.___ _

0 Other: Title changes E Editorial D. Duration: 0 Permanent El One Time Only I; Originator (Print/Sign/Date)

E. Surveillance Database Change? D Yes, change submitted 0No (Use AP 0096, App. A as a reference) 0.ProcedureD Technical Admin. (APPP) (Complete & attach AP 0096 App. C, F. Procedure Type: %3Technical a Admin. (APPP) unless editorial)

G. AP 0091, Risk Assessment ]Yes 0 No Audra Williams 7/1/03 H. Page(s) affected: pgs 6. 9. 13-15 of 17 LUaL A LL 41 PART 2 - Review/Approval (Refer to LPC Criteria of A pendix A)

A. Technical Verification Review (Print/Sign/Date) (Use B. Cross-Discipline Review(s) (Print/Sign/Date)

AP 0096, Appendix B as a reference) [ N/A l N/A Lti A sc~g 4°G ( 1!4 Audra Williams 7/1/03 (May perform Qualified Review) (N/A if editorial change) a t LC-C. Qualified Review (Print/Sign/Date) (Use AP 0096, D. 50.59 review completed type:

Appendix D, as a reference) ] N/A El AD/Screen El Evaluation 0 N/A Audra Williams Ž7t/c/'& ot (N/A if editorial change)

(N/A if editorial change) 050.54(q) (EPIP only)

E. RPO Approval (Print/Sign/Date) F. IF 50.59 Evaluation: 0N/A

a. r .7/7/03 7 J PORC Mtg. Date:

G. Plant Manager (Print/Sign/Date) (SPs only)

N/A H. Training: (Required for Admin Procedures, unless editorial) EN/A 1.Effective Date:

7/23/03 k,~ CDS Initials -7}A U VYAPF 0097.01 AP 0097 Rev. 3 Page 1 of 1

VERMONT YANKEE NUCLEAR POWER STATION OPERA'tINGJROCE1X3RE OP 3505 REVISION 24 EMERGENCY PREPAREDNESS EXERCISES AND DRILLS USE CLASSIFICATION: INFORMATION, except for Appendix A, which is classified as CONTINUOUS LPC Effective No. Date Affected Pages 1 07/26/02 14 of 17; VYOPF 3505.01 Pg 4 of 4 2 07/23/03 6, 9, 13 through 15 of 17 Implementation Statement: N/A Issue Date: 06/06/02 OP 3505 Rev. 24 Page 1 of 17

PROCEDURE A. Emergency Preparedness Exercise/Drill NOTE A full participation exercise shall be conducted every two years. At least one drill involving a combination of some of the principal functional areas of emergency response shall be conducted in the interval between biennial exercises. State and off-site agencies may participate in drills.

1. Working Exercise/Drill Groups
a. The following working groups exist solely to support the planning, conduct, and evaluation of the exerciseldrill:
1) Exercise/Drill Planning Committee a) This group has policy level, broad oversight, and decision-making responsibilities associated with the annual exercise/drill, and is made up of the following members:
  • Director of Safety & Regulatory Affairs
  • Director of Human Resources & Public Affairs
  • Plant Manager rLPCf Emergency Planning Drill/Exercise Coordinator
  • Training Superintendent b) Members of this group have the authority to commit resources from their organizations. Not all members of this group will have access to scenario information other than objectives and other information available to participants, such as extent of play.

c) This group may delegate responsibilities as defined in Section 2 of this procedure to other individuals as warranted.

OP 3505 Rev. 24 Page 6 of 17 LPC #2

2. Individual Responsibilities
a. Director of Human Resources & Public Affairs
1) The Director of Human Resources & Public Affairs (or designated alternate) has overall responsibility for the Emergency Preparedness Program which includes the Emergency Preparedness Exercisesflfrills.
b. Emergency Planning Drill/Exercise Coordinator (EPDEC)

I. z1) The Emergency Planning Drill/Exercise Coordinator's responsibilities include the following:

a) Ensure for a successful drill and exercise through coordination of the activities of the Exercise/Drill Planning and Support Group, the Scenario Development Group, and Exercise/Drill Controller Group.

NOTE For full participation exercises, the selected simulated accident tests the various components of on-site and off-site plans and organizations and calls for the mobilization of off-site agencies.

b) Ensure the Scenario Development Group selects a simulated accident that tests the various elements of the Vermont Yankee Emergency Plan and its implementing procedures.

c) Prepare a list of all events, recognized by plant personnel, that would be accomplished in an actual emergency, but which are not carried out during the exercise/drill.

d) Obtain controllers to evaluate the performance of participating personnel and the adequacy of emergency facilities, equipment and procedures during the exercise/drill.

e) Ensure controllers have had initial controller training as detailed in OP 3712.

f) Ensure that assumed emergency conditions are translated into simulated instrument responses and information for use during the exercise/drill.

OP 3505 Rev. 24 Page 9 of 17 LPC #2

d. Emergency Plan Liaison
1) The Emergency Plan Liaison provides assistance to the off-site response organizations in planning and preparations for the exercise/drill.

a) Assist in determining the off-site objectives for the exercise/drill for each state through active liaison with the States, and FEMA.

b) Contact appropriate off-site agencies to determine their degree of participation. Refer to the listing of off-site agencies on the Emergency Preparedness Exercise/Drill Planning Form.

c) Ensure that all Letters of Agreement stipulated in Appendix E of the Vermont Yankee Emergency Plan are current, by reviewing findings documented on the Emergency Preparedness Exercise/Drill Planning Form (VYOPF 3505.01). If not current, make necessary update action.

B. Drills

1. Medical Drills
a. Conduct at least one drill annually to evaluate the training of the plant's medical response team and off-site medical response personnel. This drill may be performed as part of the required annual emergency preparedness exercise, fire drill, or as a stand alone Medical Drill.
b. The EPDEC and Safety Coordinator develop a drill scenario. Utilize the Medical Drill Planning Form, VYOPF 3505.03, for Medical Drill planning and approval.
c. The Emergency Plan Liaison contacts off-site medical response personnel (ambulance and hospital) to request their participation in the drill.
d. The Emergency Plan Liaison contacts the Vernon Police to notify them of the date and time of the drill.

OP 3505 Rev. 24 Page 13 of 17 LPC #2

e. Prior to the drill, the EPDETC ensures the following are notified:
1) Radiation Protection Manager
2) Operations Manager
3) Security Manager
4) NRC Resident Inspector
5) Safety Coordinator
f. The EPDEC briefs controllers on the drill and issues Emergency Exercise/Drill Controller's Evaluation Form, VYOPF 3505.02.
g. The EPDEC conducts a critique for controllers and participants to present their observations and comments. All weaknesses and deficiencies are documented and resolved as outlined in Section C.
h. All Emergency Exercise/Drill Controller's Evaluation Forms are collected 7 Lct by the EPDEC at the conclusion of the critique.
2. Health Physics Drills
a. A drill is conducted semi-annually which involves response to and PC panalysis of, simulated elevated in-plant airborne and liquid samples, and l~t direct radiation measurements in the environment (inside plant or outside of plant). The semi-annual Health Physics Drills are conducted as

-follows:

1) One of the drills may be performed as part of the required Emergency Preparedness Exercise/Drill.
2) One of the drills is performed separately, and following the guidelines outlined in this procedure.
3) One of the drills should include use of the post-accident sampling system.

NOTE Time frame to conduct the drill should allow enough time for obtaining and counting planned drill chemistry samples.

b. In conjunction with the Chemistry Manager and the Radiation Protection Manager, the EPDEC directs the development of a drill scenario utilizing the Health Physics Drill Planning Form, VYOPF 3505.05.

It C- c. The EPDEC briefs controllers on the drill and distributes Emergency Exercise/Drill Controller's Evaluation Form, VYOPF 3505.02.

OP 3505 Rev. 24 Page 14 of 17 LPC #2

Iwd._ The EPDEC conducts a critique for controllers and participants to present their observations and comments. All weaknesses and deficiencies are documented and resolved as outlined in Section C.

3. Radiological Monitoring Drills
a. At least one drill is conducted each year to evaluate on-site and off-site collection and analysis of airborne sample media. This drill may be performed as part of the required Emergency Preparedness Exercise/Drill.
4. Fire Drills
a. Plant's Fire Brigade A number of drills are conducted annually to test and evaluate the response and training of the plant's fire-brigade. These fire drills are conducted per AP 3700, Fire Training, and 10CFR50 Appendix R.
b. Local Fire Department Participation The Vernon Fire Department is annually offered the opportunity to participate in an onsite fire drill to demonstrate the coordination between the Vernon Fire Department and the plant's fire brigade. The drill is conducted as follows:
1) The Fire Brigade Instructor (FBI) and EPDEC develop a drill scenario utilizing FBTPD, Appendix E, and VYOPF 3505.06, Off-Site Participation Fire Drill Planning Form. Ensure that the proper approval signatures are obtained on form prior to initiating drill.
  • 2) The FBI and EPDEC briefs controllers on the drill and distributes Emergency Exercise/Drill Controller's Evaluation Form, VYOPF 3505.02 and FBTPD.

F i. 3) The FBI and EPDEC conduct a critique for controllers and participants to present their observations and comments. All weaknesses and deficiencies are documented and resolved as outlined in Section C.

OP 3505 Rev. 24 Page 15 of 17 LPC #2

10 CFR 50.54(q) Evaluation Checklist List of Emergency Plan Section(s)/Emergency Plan Implementing Procedure(s) or any other document to be evaluated. (Include Title and Revision No.):

OP 3505, Rev. 24, LPC #2, Emergency Preparedness Exercises and Drills A. Screening Evaluation

  • ~~~-.

Based on a review of the following questions, determine if the change has the potential to affect our ability to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

A "YES" answer to any part of the questions requires that a written evaluation be done to determine whether the effectiveness of the Emergency Plan was decreased as specified in Section B of this checklist.

A "NO" answer to all questions requires no written evaluation as specified in Section B of this checklist.

I YES I NO I Could the proposed change affect our ability to meet the following standards of 10CFR50.47(b):

(1) Assignment of Emergency Response Organization responsibilities X (2) Assignment of on-shift Emergency Response Organization personnel X (3) Arrangements for Emergency Response Support and Resources X (4) Emergency Classification and Action levels, including facility system X and effluent parameters (5) Notification Methods and Procedures X (6) Emergency Communications among principal response organizations X and the public (7) Public Education and Information X (8) Adequacy of Emergency Facilities and Equipment X (9) Adequacy of Accident Assessment methods, systems and equipment X (10) Plume exposure pathway EPZ protective actions x (11) Emergency Worker Radiological Exposure Control X (12) Medical Services for contaminated injured individuals x (13) Recovery and Reentry Plans x (14) Emergency response periodic drills and exercises x (15) Radiological Emergency Response Training x (16) Plan development, review and distribution x VYAPF 3532.01 AP 3532 Rev. 11 Page 1 of 3

10 CFR 50.54(q) Evaluation Checklist (Continued)

YES NO

2. Could the change affect our ability to meet the following requirements of Appendix E to l OCFR50 (I) Section IV. A - Organization X (2) Section IV. B - Assessment Actions X (3) Section IV. C - Activation of Emergency Organizations X (4) Section IV. D - Notification Procedures X (5) Section IV. E - Emergency Facilities and Equipment X (6) Section IV. F - Training X (7) Section IV. G - Maintaining Emergency Preparedness X (8) Section IV. H - Recovery X B. Effectiveness Determination For each applicable (i.e., a "yes" answer specified) standard to IOCFR50.47(b) and Appendix E to IOCFR50 identified from Section A above, complete the evaluation form below to determine whether the change decreases the effectiveness of the Emergency Plan and whether it continues to meet the stated applicable standard or requirement.

A facsimile of the evaluation form may be used as needed and attached to this checklist.

For applicable item IOCFR50. n/a of Section A above, this change Dl DOES 0g DOES NOT decrease the effectiveness of the Emergency Plan and 3 DOES a DOES NOT continue to meet the stated applicable standard or requirement.

BASIS FOR ANSWER:

The changes made were title changes only. The Director of Human Resources and Public Affairs is no longer responsible for the Emergency Preparedness Program as outlined in the procedure. The Emergency Plan Manager has assumed overall responsibility for the Emergency Preparedness Program including exercises and drills. This does not decrease the effectiveness of the plan and continues to meet all standards/requirements.

VYAPF 3532.01 AP 3532 Rev. 11 Page 2 of 3

10 CFR 50.54(q) Evaluation Checklist (Continued)

C. Conclusion (Fill out appropriate information)

%3 The changes made do not decrease the effectiveness of the Emergency Plan and continue to meet the standards of 10CFR50.47(b) and the requirements of Appendix E to 10CFR50.

DI The changes made do decrease the effectiveness of the Emergency Plan and decrease our ability to meet the standards of I OCFR50.47(b) and the requirements of Appendix E to 10CFR50. The following course of action is recommended:

D] Revise proposed changes to meet applicable standards and requirements.

[] Cancel the proposed changes.

LI Process proposed changes for NRC approval prior to implementation in accordance with IOCFR50.54(q).

D. Impact on Other Documents (TRM, Tech Specs)

Keywords used in search:

[1 This change does not affect any other documents.

>3 This change does affect other documents.

Document(s) affected: OP 3712 Section(s) affected:

E. Impact on the Updated FSAR Use AP 6036 to determine if the proposed E-Plan change modifies existing UFSAR information or requires the addition of new UFSAR information and initiate UFSAR change(s) as required.

Keywords used in UFSAR search:

Additional Comments:

Prepared By: Audra Williams _12347 flate: 7/1/03 (Print/Sign)

Reviewed By: 1 IVI A. Okac24z. ea.

(Emergency Plan Coordinator) (Print/Sign)J Date: -1I *kt VYAPF 3532.01 AP 3532 Rev. 11 Page 3 of 3

APPENDIX C CROSS-DISCIPLINE REVIEW CHECKLIST Required to be completed for new procedures, procedure revisions, and LPCs unless they are designated as Editorial.

Procedure Number/Revision OP 3505. Rev. 24. LPC#2.

Reviewer/Date (Print) Audra Williams 7/1/03 GENERAL REVIEW GUIDELINES/SPECIAL REVIEW REQUIREMENTS

  • The Cross-Discipline Review Guidelines below constitute minimum review requirements; other reviews may apply.
  • Determination of reviews should focus on changesmade to a procedure and the potential impact of those changes on the affected group. Changes that are minimally or nonimpacting do not need review by the potentially affected group.

If change impact is unclear, the procedure should be routed to the potentially affected group for review.

  • New or revised Administrative or Program Procedures that significantly impact other departments, shall be reviewed by the appropriate Superintendent or Senior Manager. The PAA maintains a list of these Administrative and Program Procedures.
  • ALL noneditorial changes to Special Process procedures (WP, NE, heat treating, etc.), including Vendor Procedures that address Special Processes, shall be reviewed by. a Welding Engineer (welding procedures) or a NDE Level III certified in the method addressed by the procedure (nondestructive examination procedures), AND the Quality Assurance Manager, AND submitted to the Authorized Nuclear Inservice Inspector (ANII) prior to use.
  • A "YES" indicates that a Cross Discipline Review shall be done by the indicated Department. Document the review on VYAPF 0096.01, VYAPF 0097.01, or VYAPF 0097.02, as applicable.

APPLICABLE YES I NO Chemistry:

  • Potentially affects condensate, feedwater, or reactor water chemistry, or chemistry instruments.
  • Procedures that implement the requirements of the VY Environmental Program.

(see PP 7603, Appendix A)

  • Produces/affects effluents or effluent monitoring (VY/QA 01-015).
  • Affects NPDES limits or method of compliance. X Maintenance (Mech, Elec, I&C):
  • Requires Maintenance personnel to perform activities, such as performance of maintenance procedures, installation of M&TE, lifting and landing of leads and connectors. X Operations:
  • Changed requirements for entry into a Limiting Condition for Operation (LCO) or significantly changes duration of LCO.
  • Requires Operations alignment/restoration of systems or components.
  • Specifies surveillance or post maintenance testing by Operations. X EOPISAG Coordinator:
  • Procedures that have the potential to affect the EOPs/SAGs. X Appendix C AP 0096 Rev. 3 Page I of 3

APPENDIX C (Continued)

APPLICABLE YES NO Quality Assurance:

  • Changes to procedures that implement the requirements of the VOQAM. (see PP 7802, Appendix B)
  • New procedures that have a potential for reduction of VOQAM commitments.

l Obtain and attach a 10CFR50.54(a)(3) evaluation. X Radiation Protection:

  • Involves work that breaches contaminated systems or components.
  • Changes in radwaste or hazardous waste generation. X Emergency Plan Coordinator:
  • Obtain and attach a IOCFR50.54(q) Evaluation.
  • Affects Emergency Plan personnel, facilities or equipment. X Software Quality Assurance Administrator
  • Procedures that define how software is developed. X Reactor Engineering:
  • Could affect core reactivity, thermal power, reactor heat balance, or fuel integrity.
  • Involves refueling operations. X Systems/Project/Design Engineering:
  • Maintenance Rule in-scope systems unavailability time.
  • Involves infrequently performed test or evolution.
  • Changed requirements for entry into a Limiting Condition for Operation (LCO) or significantly changes duration of LCO.
  • Significant changes in system test or operation methodology. X Appendix J Coordinator:
  • Changes that affect App. J leakrates or containment boundaries, or boundary valve manipulation. X Appendix R Coordinator:
  • Appendix R implementing procedures. X Environmental Qualification (EQ) Coordinator:
  • Change in EQ test methodology or component lifetime.
  • Potentially affects area EQ component environment. X Fire Protection Coordinator (FPC):
  • Fire Protection procedures.
  • Affects fire loading
  • Affects fire protection systems or component functionality. X IST Program Coordinator:
  • Inservice Testing Program implementing procedures.
  • All surveillance procedures. X ISI Program Coordinator:
  • Inservice Inspection Program implementing procedures. X Appendix C AP 0096 Rev. 3 Page 2 of 3

APPENDIX C (Continued)

APPLICABLE YES NO Setpoint Coordinator:

Changes that impact setpoints, as-found/as-left tolerances, M&TE or testing methodology. X l Nuclear & PRA

  • Potentially affects IPEEE or ORAM Sentinel Risk Models.
  • Potentially affects plant SSCs reliability.
  • Potentially affects Nuclear or Radiological Safety Analysis. X Security:
  • Proceures that implement the requirements of the VY Physical Security and Training and Qualification Plans.
  • Changes that have a potential for reduction of the VY Physical Security and Training and Qualification Plan commitments.
  • Obtain and attach a 10CFR50.54(P) Evaluation. X Appendix C AP 0096 Rev. 3 Page 3 of 3

PREAPPROVED LPC FORM I PART 1-Initiation F_ Converted to Admin- Revision 4 LPC Nn!0~

I A. Procedure No.: CurrentRevision #:. l Tite: 5e-1I Jso45 Over&$

OP 3547 k 7ui a3c B. Description of Change:

one vc~~ev~w oF 4Aroro¢*

DwluFX evt'j cCLr&t f47C C. Reason for Change: Li Result of Design Change, Minor Mod, EDCR D E] Related ER No._

El Other:

4 Editorial D. Duration: M Permanent L One Time Only I. Originator (PrintlSignfDate)

E. Surveillance Database Change? El Yes, change submitted 29 No (Use AP 0096, App. A as a reference)

F. Procedure Type:

F. roedue ype Technical I Admin.

reTehnialm (APPP)

Arnn. APPP (Complete & attach AP unless editorial)GC x- 0096 App. C,

51. 1 .st G. AP 0091, Risk Assessment El Yes [g]No n 1d toia])

H. Page(s) affected: og 5 Gi PART 2 - Review/Approval (Refer to LPC Criteria of A endix A)

A. Technical Verification Review (PrintlSign/Date) (Use B. Cross-Discipline Review(s) (Print/Sign/Date)

AP 0096, Appendix B as a reference) g N/A -N/A (May perform Qualified Review) (NIA if editorial change)

C. Qualified Review (Print/Sign/Date) (Use AP 0096, D. 50.59 review completed type:

Appendix D, as a reference) r3N/A El AD/Screen El Evaluation E N/A (N/A if editorial change)

(QN/A if editorial change) F50.54(q) (EPIP only)

E. RPO Approval (Print/Sign/Date) /7/0> F. IE 50.59 Evaluation: ,N/A g,- 14, ftA . PORC Mtg. Date:

G. Plant Manager (Print/Sign/Date) (SPs only)

H. Training: (Required for Admin Procedures, unless editorial) NIA

l. Effective Date:

I rCD CDS Initials U -

VYAPF 0097.01 AP 0097 Rev. 3 Page 1 of 1

VERMONT YANKEE NUCLEAR POWER STATION pPEA1pR~~DR OP 3547 REVISION 1 SECURITY ACTIONS DURING AN EMERGENCY USE CLASSIFICATION: REFERENCE NoC Dtee Affected Pages 1 02/19/03 7 of 8 2 07/23/03 5 of 8 I Implementation Statement: N/A I Issue Date: 06/25/02 OP 3547 Rev. 1 Page 1 of 8

REFERENCES AND COMMITMENTS

1. Technical Specifications and Site Documents
a. Vermont Yankee Nuclear Power Station Emergency Plan
2. Codes, Standards and Regulations
a. None
3. Commitments
a. None
4. Supplemental References
a. AP 0009, Event Reports
b. AP 0010, Situational Reporting Requirements
c. AP 0021, Work Orders
d. AP 0156, Notification of Significant Events
e. ENN-OM-105, Fitness for Duty Program
f. AP 3125, Emergency Plan Classification and Action Level Scheme
g. OP 3504, Emergency Communications
h. OP 3507, Emergency Radiation Exposure Control
i. OP 3524, Emergency Actions to Ensure Initial Accountability and Security

Response

j. OP 3531, Emergency Call-in Method
k. OP 3540, Control Room actions During an Emergency
1. OP 3541, Activation of the Technical Support Center (TSC)
m. OP 3542, Operation of the Technical Support Center (TSC)
n. OP 3544, Operation of the Operations Support Center (OSC)
o. OP 3545, Activation of the Emergency Operations Facility/Recovery Center EOFIRC
p. OP 3546, Operation of the Emergency Operations Facility/Recovery Center EOF/RC
q. AP 6807, Collection, Temporary Storage and Retrieval of QA Records PRECAUTIONS/LI M ITATIONS Refer to OP 3504 for alternate methods of communication in the event that primary methods fail.

OP 3547 Rev. 1 Page 5 of 8 LPC #2

10 CFR 50.54(q) Evaluation Checklist List of Emergency Plan Section(s)/Emergency Plan Implementing Procedure(s) or any other document to be evaluated. (Include Title and Revision No.):

OP 3547, Rev. 1, LPCQ, Security Actions During an Emergency A. Screening Evaluation Based on a review of the following questions, determine if the change has the potential to affect our ability to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

A "YES" answer to any part of the questions requires that a written evaluation be done to determine whether the effectiveness of the Emergency Plan was decreased as specified in Section B of this checklist.

A "NO" answer to all questions requires no written evaluation as specified in Section B of this checklist.

YES NO l

1. Could the proposed change affect our ability to meet the following standards of 10CFR50.47(b):

(1) Assignment of Emergency Response Organization responsibilities X (2) Assignment of on-shift Emergency Response Organization personnel X (3) Arrangements for Emergency Response Support and Resources X (4) Emergency Classification and Action levels, including facility system X and effluent parameters (5) Notification Methods and Procedures X (6) Emergency Communications among principal response organizations X and the public (7) Public Education and Information X (8) Adequacy of Emergency Facilities and Equipment X (9) Adequacy of Accident Assessment methods, systems and equipment X (10) Plume exposure pathway EPZ protective actions X (ll) Emergency Worker Radiological Exposure Control X (12) Medical Services for contaminated injured individuals X (13) Recovery and Reentry Plans X (14) Emergency response periodic drills and exercises X (15) Radiological Emergency Response Training X (16) Plan development, review and distribution X VYAPF 3532.01 AP 3532 Rev. 11 Page I of 3

10 CFR 50.54(q) Evaluation Checklist (Continued)

I YES I NO

2. Could the change affect our ability to meet the following requirements of Appendix E to I OCFR50 (1) Section IV. A - Organization , ~~~~~~~~~~~~I' I X 1 (2) Section IV. B - Assessment Actions (3) Section IV. C - Activation of Emergency Organizations X

(4) Section IV. D - Notification Procedures xX (5) Section IV. E - Emergency Facilities and Equipment X

(6) Section IV. F - Training X

(7) Section IV. G - Maintaining Emergency Preparedness X

(8) Section IV. H - Recovery B. Effectiveness Determination For each applicable (i.e., a "yes" answer specified) standard to I OCFR50.47(b) and Appendix E to 10CFR50 identified from Section A above, complete the evaluation form below to determine whether the change decreases the effectiveness of the Emergency Plan and whether it continues to meet the stated applicable standard or requirement.

A facsimile of the evaluation form may be used as needed and attached to this checklist.

For applicable item 10CFR50. N/A of Section A above, this change a DOES ED DOES NOT decrease the effectiveness of the Emergency Plan and

[0 DOES El DOES NOT continue to meet the stated applicable standard or requirement.

BASIS FOR ANSWER:

This change is strictly editorial. The number of the procedure has changed from AP 0864 to ENN-OM-105, content remains the same.

VYAPF 3532.01 AP 3532 Rev. 11 Page 2 of 3

10 CFR 50.54(q) Evaluation Checklist (Continued)

K>_~ C Conclusion (Fill out appropriate information) ful The changes made do not decrease the effectiveness of the Emergency Plan and continue to meet the standards of 10CFR50.47(b) and the requirements of Appendix E to IOCFR50.

D] The changes made do decrease the effectiveness of the Emergency Plan and decrease our ability to meet the standards of 10CFR50.47(b) and the requirements of Appendix E to IOCFR50. The following course of action is recommended:

[] Revise proposed changes to meet applicable standards and requirements.

LI Cancel the proposed changes.

E] Process proposed changes for NRC approval prior to implementation in accordance with 10CFR50.54(q).

D. Impact on Other Documents (TRM, Tech Specs)

Keywords used in search:

s -Thischange does not affect any other documents.

2 This change does affect other documents.

Document(s) affected:

Section(s) affected:

E. Impact on the Updated FSAR Use AP 6036 to determine if the proposed E-Plan change modifies existing UFSAR information or requires the addition of new UFSAR information and initiate UFSAR change(s) as required.

Keywords used in UFSAR search: ____

Additional Comments:

I I Prepared By:Audra Williams G i&U(Ll Date: 7/3/03 .

(Print/Sign)

Reviewed By: Le i

.7) t4 dc Date: 7//c  ?

(Emergency Plan Coordinator) (Print/Sign)

VYAPF 3532.01 AP 3532 Rev. 11 Page 3 of 3

11 REVISED PROCEDURE CONTROL FORM K..ART 1 - Initiation A. Procedure No. New Revision Title OP 3506 No. 43 Emergency Equipment Readiness Check l B. Review Criteria: LI Partial [] Editorial C. Periodic Review Cycle: >32 Year (Event Driven) 3 Complete []N/A D. List DIs & LPCs: #1 E. Description and Reasons for Procedure/Changes: gP -- ).W3-GEN._DI'aCtLk k(s V} Ca~bW3 inf£F 0 Added RTIME computers to surveillance and designated what type. ;a 0 ER-20030793 - Moved High range dosimeters and SAM-2 from E-kit Strage area to AccKpoint.

0 ER-2003-0767_01 - Revised VYOPF 3506.10 to reflect the responsible person for EPIP changes also makes changes to all locations in the OSC/Checkpoint. All OSC procedures were removed from VYOPF 3506.02 for RP quarterly surveillance as .10 will now be responsible for changes.

o Added potassium iodide to VYOPF 3506.03.

O Removed procedures from VYOPF 3506.07 and moved them to VYOPF 3506.10.

0 Added TSC Personnel Sign-In Forms Book procedures to VYOPF 3506.12.

O ER-2003-0768_01 - added statement that VYOPF 3506.XX forms must be returned to EP even if no changes were necessary and within 10 days of issuance.

O Added primary ring down phone headsets to inventory. EP- 2 -L3- ILI4 - 3 IF. Originator Name: (App. A was used as references to create this revision, App. C is Telephone I I completed and attached unless Part 1.B.above is "Editorial".) Extension:

(Print/sign/date) Audra Williams L( u i l/ SIBS 6/25/03 4177 PART 2 - Reviews A. Walk-Through Validation: F] Required Z N/A B. Technical Verification Reviewer E] N/A (App. B used as a reference)

I Field Walk-Through (Print/Sign/Date)

[]Table-Top []Simulator Validation 1. ase I -a ' 6/9o3 C. Cross-Discipline Reviews: 3 N/A Department Name Signature Date D. 50.59 Review Per AP 6002, Preparing 50.59 Evaluations N/A l 3 50.59 AD previously performed and documented in the text of this procedure and is still applicable.

0 50.59 Applicability Determination completed and attached; 50.59 Screening NOT required.

[]50.59 Review Screening completed and attached, 50.59 Evaluation NOT required.

E 50.59 Evaluation completed and attached.

E. QUALIFIED REVIEWER: Use App. D as a reference (May perform 50.59 Applicability Determination)

(Part 2.D) -,65 (Print/Sign/Date) Audra Williams ~F&'A .~L7-~ kl 6/25/03 VYAPF 0096.01 AP 0096 Rev. 3 Page 1 of 2

REVISED PROCEDURE CONTROL FORM (Continued)

' '. ORIGINATOR: W3tComments Resolved rl Re-verify All DIs & LPCs Considered Pi Sent for Final Type (CDS or STC (SPs only)) Initial/Date ff 7/91(pAq) l(Print/Sign/Date) alaAX/C 2Proofread after Final Type PART 3 - Training/Notification Requirements 7/c;4/ Pf I

7021 A. Indicate training or notifications required to implement procedure: (Required for Administrative Procedures)

El Include in formal training (TCR submitted):

l E-Mail notification: to RP I Crew Briefings:

lE Other: a N/A PART 4-PORC Plant Operation Review Committee: LI Required 3 N/A Meeting No: PORC Secretary: Date: Plant Manager:

"-PART 5 - Approval A. Responsible Procedure Owner: (Print/Signature/Date)

B. Plant Manager (Print/Sign/Date) or SPs Only)

N/A C. Special Instructions: [lN/A

[1 Approved for Training 3 Issue on DATE: 7-23-03

[]Submit Surveillance Database Change per AP 4000 El Other:

PART 6 - Issuance Procedure Change No.: Ho:? i8 Date procedure issued: 7/p3/D3 Notes:

Appendix E AP 0096 Rev. 3 Page 2 of 2 LPC #2

APPENDIX C CROSS-DISCIPLINE REVIEW CHECKLIST Required to be completed for new procedures, procedure revisions, and LPCs unless they are designated as Editorial.

Procedure Number/Revision OP 3506. Rev 43 Reviewer/Date (Print) Audra Williams 6/25/03 GENERAL REVIEW GUIDELINES/SPECIAL REVIEW REQUIREMENTS

  • The Cross-Discipline Review Guidelines below constitute minimum review requirements; other reviews may apply.
  • Determination of reviews should focus on changes made to a procedure and the potential impact of those changes on the affected group. Changes that are minimally or nonimpacting do not need review by the potentially affected group.

If change impact is unclear, the procedure should be routed to the potentially affected group for review.

  • New or revised Administrative or Program Procedures that significantly impact other departments, shall be reviewed by the appropriate Superintendent or Senior Manager. The PAA maintains a list of these Administrative and Program Procedures.
  • ALL noneditorial changes to Special Process procedures (WP, NE, heat treating, etc.), including Vendor Procedures that address Special Processes, shall be reviewed by: a Welding Engineer (welding procedures) or a NDE Level III certified in the method addressed by the procedure (nondestructive examination procedures), AND the Quality Assurance Manager, AND submitted to the Authorized Nuclear Inservice Inspector (ANII) prior to use.
  • A "YES" indicates that a Cross Discipline Review shall be done by the indicated Department. Document the review on VYAPF 0096.01, VYAPF 0097.01, or VYAPF 0097.02, as applicable.

APPLICABLE YES I NO Chemistry:

  • Potentially affects condensate, feedwater, or reactor water chemistry, or chemistry instruments.
  • Procedures that implement the requirements of the VY Environmental Program.

(see PP 7603, Appendix A)

  • Produces/affects effluents or effluent monitoring (VY/QA 01-015).
  • Affects NPDES limits or method of compliance. X Maintenance (Mech, Elec, I&C):
  • Requires Maintenance personnel to perform activities, such as performance of maintenance procedures, installation of M&TE, lifting and landing of leads and connectors. X Operations:
  • Changed requirements for entry into a Limiting Condition for Operation (LCO) or significantly changes duration of LCO.
  • Requires Operations alignment/restoration of systems or components.
  • Specifies surveillance or post maintenance testing by Operations. X EOP/SAG Coordinator:
  • Procedures that have the potential to affect the EOPs/SAGs. X Appendix C AP 0096 Rev. 3 Page 1of 3

APPENDIX C (Continued)

Quality Assurance:

  • mpliance with QA Program requirements cannot be readily determined by the Qualified Reviewer.

Radiation Protection:

  • Involves work that breaches contaminated systems or components.
  • Changes in radwaste or hazardous waste generation.

Emergency Plan Coordinator:

  • Obtain and attach a IOCFR50.54(q) Evaluation.
  • Affects Emergency Plan personnel, facilities or equipment. X Software Quality Assurance Administrator
  • Procedures that define how software is developed.

Reactor Engineering:

  • Could affect core reactivity, thermal power, reactor heat balance, or fuel integrity.
  • Involves refueling operations.

Systems/Project/Design Engineering:

  • Maintenance Rule in-scope systems unavailability time.
  • Involves infrequently performed test or evolution.
  • Changed requirements for entry into a Limiting Condition for Operation (LCO) or significantly changes duration of LCO.
  • Significant changes in system test or operation methodology.

Appendix J Coordinator:

  • Changes that affect App. J leakrates or containment boundaries, or boundary valve manipulation.

Appendix R Coordinator:

  • Appendix R implementing procedures.

Environmental Qualification (EQ) Coordinator:

  • Change in EQ test methodology or component lifetime.
  • Potentially affects area EQ component environment.

Fire Protection Coordinator (FPC):

  • Fire Protection procedures.
  • Affects fire loading
  • Affects fire protection systems or component functionality.

IST Program Coordinator:

  • Inservice Testing Program implementing procedures.
  • All surveillance procedures.

ISI Program Coordinator:

  • Inservice Inspection Program implementing procedures.

Appendix C AP 0096 Rev. 3 Page 2 of 3

APPENDIX C (Continued)

Setpoint Coordinator:

  • Changes that impact setpoints, as-found/as-left tolerances, M&TE or testing methodology.

Nuclear & PRA

  • Potentially affects IPEEE or ORAM Sentinel Risk Models.
  • Potentially affects plant SSCs reliability.
  • Potentially affects Nuclear or Radiological Safety Analysis.

Security:

  • Proceures that implement the requirements of the VY Physical Security and Training and Qualification Plans.
  • Changes that have a potential for reduction of the VY Physical Security and Training and Qualification Plan commitments.
  • Obtain and attach a IOCFR5O.54(P) Evaluation.

Appendix C AP 0096 Rev. 3 Page 3 of 3

10 CFR 50.54(q) Evaluation Checklist List of Emergency Plan Section(s)/Emergency Plan Implementing Procedure(s) or any other document to be evaluated. (Include Title and Revision No.):

OP 3506, Rev. 43, Emergency Equipment Readiness Check A. Screening Evaluation Based on a review of the following questions, determine if the change has the potential to affect our ability to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

A "YES" answer to any part of the questions requires that a written evaluation be done to determine whether the effectiveness of the Emergency Plan was decreased as specified in Section B of this checklist.

A "NO" answer to all questions requires no written evaluation as specified in Section B of this checklist.

YES NO

1. Could the proposed change affect our ability to meet the following standards of I OCFR50.47(b):

(1) Assignment of Emergency Response Organization responsibilities X (2) Assignment of on-shift Emergency Response Organization personnel X (3) Arrangements for Emergency Response Support and Resources X (4) Emergency Classification and Action levels, including facility system X and effluent parameters (5) Notification Methods and Procedures X (6) Emergency Communications among principal response organizations X and the public (7) Public Education and Information X (8) Adequacy of Emergency Facilities and Equipment X (9) Adequacy of Accident Assessment methods, systems and equipment X (10) Plume exposure pathway EPZ protective actions X (11) Emergency Worker Radiological Exposure Control X (12) Medical Services for contaminated injured individuals X (13) Recovery and Reentry Plans X (14) Emergency response periodic drills and exercises X (15) Radiological Emergency Response Training X (16) Plan development, review and distribution X VYAPF 3532.01 AP 3532 Rev. 11 Page 1 of 3

10 CFR 50.54(q) Evaluation Checklist (Continued)

I YES I NO I

2. Could the change affect our ability to meet the following requirements of Appendix E to 10CFR50 (I) Section IV. A - Organization .X (2) Section IV. B - Assessment Actions X (3) Section IV. C - Activation of Emergency Organizations X (4) Section IV. D - Notification Procedures X (5) Section IV. E - Emergency Facilities and Equipment X (6) Section IV. F - Training X (7) Section IV. G - Maintaining Emergency Preparedness X (8) Section IV. H - Recovery X B. Effectiveness Determination For each applicable (i.e., a "yes" answer specified) standard to 10CFR50.47(b) and Appendix E to IOCFR50 identified from Section A above, complete the evaluation form below to determine whether the change decreases the effectiveness of the Emergency Plan and whether it continues to meet the stated applicable standard or requirement.

A facsimile of the evaluation form may be used as needed and attached to this checklist.

For applicable item IOCFR50. 47(b)(9) and Appendix E. (5) of Section A above, this change E DOES ED DOES NOT decrease the effectiveness of the Emergency Plan and ED DOES E DOES NOT continue to meet the stated applicable standard or requirement.

BASIS FOR ANSWER:

By adding the RTIME computers that are used by certain personnel during an emergency ensures that they are being surveilled on a quarterly basis to make certain that they are working. Moving the high range dosimeters and SAM-2 from the E-Kit Storage Area to the RP Checkpoint makes itmore efficient as this is where they are used.

Headsets were installed on the primary ring down circuit as requested by personnel. This will allow the person maintaining the phone to be hands free and more comfortable as this will be an open line for long periods of time.

Adding the procedures that are located inthe various kits and locations in the OSC to the OSC Documentation Change Form will ensure that the latest changes to those procedures are filed. Currently there is no mechanism to ensure that the procedures other than the EPIPs, and sometimes those were missed, are being updated in the kits and other locations in the OSC. This form change will require the admin asst to update the procedures in the various locations as well as the EPIP books and forms drawer.

All of the changes made enhance the procedure and provide a more efficient methods ensure up-to-date procedure revisions and quarterly surveillances. None of these changes decrease the effectiveness of the plan and it continues to meet the applicable requirements.

VYAPF 3532.01 AP 3532 Rev. 11 Page 2 of 3

10 CFR 50.54(q) Evaluation Checklist (Continued)

C. Conclusion (Fill out appropriate information)

>3 The changes made do not decrease the effectiveness of the Emergency Plan and continue to meet the standards of 10CFR50.47(b) and the requirements of Appendix E to 10CFR50.

LI The changes made do decrease the effectiveness of the Emergency Plan and decrease our ability to meet the standards of 10CFR50.47(b) and the requirements of Appendix E to 10CFR50. The following course of action is recommended:

[E Revise proposed changes to meet applicable standards and requirements.

[D Cancel the proposed changes.

Li Process proposed changes for NRC approval prior to implementation in accordance with 10CFR50.54(q).

D. Impact on Other Documents (TRM, Tech Specs)

Keywords used in search:_

[] This change does not affect any other documents.

XJ This change does affect other documents.

Document(s) affected: OP 3504 Section(s) affected: N. page 21 of 23 E. Impact on the Updated FSAR Use AP 6036 to determine if the proposed E-Plan change modifies existing UFSAR information or requires the addition of new UFSAR information and initiate UFSAR change(s) as required.

Keywords used in UFSAR search:_

Additional Comments:

Prepared By: Audra Williams T

(ft rint/Sign)

Date: 6/25/03 Reviewed By: A;Ov CtL . Date: Cii (CD (Emergency Plan Coordinator) (Print! ign)

WAPF 3532.01 AP 3532 Rev. 11 Page 3 of 3

VERMONT YANKEE NUCLEAR POWER STATION

  • 1*~i~ OrERATINGPROCE~ut~ ~

OP 3506 REVISION 43 EMERGENCY EQUIPMENT READINESS CHECK USE CLASSIFICATION: REFERENCE LPC Effective No. Date Affected Pages I Implementation Statement: N/A I Issue Date:

OP 3506 Rev. 43 Page 1 of 16

TABLE OF CONTENTS REFERENCES PRERE CH MZTSSAND COMITMENTS...................................................... ....................................... 5 PR O CEDQ RU ............................................................................................................................... ,,,,,,,,,,,,,,,,,,........

,,,,,,,,,,,,6 A. Control Room Emergency Communications Check (Operations) .......................................... 6 B. Quarterly Emergency Equipment Check (RP) ......................................... 10 10................

C. Quarterly Brattleboro Memorial Hospital Emergency Equipment Check (RP).................... 11 D. Quarterly Post Accident Sample Equipment Check (RP)............................................... 12 E. Quarterly Chemistry Emergency Equipment Check ............................................................... 12 F. Vermont Yankee Public Notification System Preventive Maintenance, Testing, and Reporting................................................................................................................................. 13 G. Emergency Response Telephone Number Check.................................................................. 13 H. TSCIEOF FTS and NAS Phone Test,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,......,,,,,,,,,,,,,,,.. 14 I. Emergency Plan Implementing Procedures and Status Form Book Updatest.. 14 J. Power Fail Phone Test.15 FINALL COND MONON ...................................................................................................................................., 16 OP 3506 Rev. 43 Page 2 of 16

PURPOSE To ensure that emergency radiological and communication equipment is periodically inventoried and maintained in an operable condition by assigned plant personnel.

No required Tech. Spec. surveillances are covered in this procedure.

DISCUSSION The Operations Department shall conduct scheduled tests of emergency communications equipment as follows:

1. Test of the Nuclear Alert System (NAS) orange phone.
2. Test of the Unusual Event, Alert, Site Area Emergency and General Emergency Alarms.
3. Test of the Southwest Fire Mutual Aid and Tri-State Mutual Aid radio (Deskon W.).
4. Test of the NRC Emergency Telecommunications System phones.

A Radiation Protection (RP) Technician shall be assigned to perform the following:

1. Physical inventory of Emergency Equipment Kits and Cabinets contents as listed on VYOPF 3506.02 and VYOPF 3506.06 on a scheduled basis and subsequent to each usage.
2. Physical inventory of Emergency Kit equipment contents at Brattleboro Memorial Hospital (BMH) as listed on VYOPF 3506.03.

A Chemistry Technician shall be assigned to perform the following:

1. Physical inventory of the Liquid PASS Sampling kit and the Plant Vent Stack PASS Sampling kit as listed on VYOPF 3506.05 on a scheduled basis and subsequent to each usage.

Quarterly, the Emergency Planning Manager (EPM) will ensure that Emergency Response phone numbers are updated via VYOPF 3506.13.

Monthly, the EPM will ensure the FTS phones in the Technical Support Center (TSC) and the Emergency Operations Facility (EOF), and the NAS phones in the EOF are tested via VYOPF 3506.08.

OP 3506 Rev. 43 Page 3 of 16

NOTES

. The quantities listed in this procedure are to be considered the minimum required. Quantities above those listed are acceptable.

  • Pens, pencils and scratch paper are readily available and therefore will not be maintained in the EOF and TSC kits.

Preventive maintenance and testing of the Public Notification System (PNS) utilized within the Vermont Yankee Emergency Planning Zone is conducted by Northeast Mountain Radio of Rutland, VT, as follows:

1. Monthly preventive maintenance on 21 sirens and 10 generators.
2. Annual siren receiver sensitivity and full decoder tests.
3. Preparation of annual maintenance testing program summary report.

Per Surveillance Test No. 4000, the power fail phone system in Vernon and Brattleboro is tested on a semi-annual basis.

In accordance with AP 6002, Preparing 50.59 Evaluations, the results of an Applicability Determination (AD) has determined that an AD is not required for future changes, provided the scope of the procedure or program is not revised to include a different type of activity. The basis for this conclusion is that this document is an Emergency Implementing Procedure and is subject to 10CFR50.54(q) to determine if the changes decrease the effectiveness of the Emergency Plan and if they have the potential to affect our ability to meet the standards of 1OCER50.47(b) and the requirements of 10CFR50 Appendix E.

ATTACHMENTS

1. VYOPF 3506.01 Control Room Monthly Emergency Communications Checklist
2. VYOPF 3506.02 Emergency Equipment Checklist
3. VYOPF 3506.03 Brattleboro Memorial Hospital Emergency Equipment Checklist
4. VYOPF 3506.04 Deleted
5. VYOPF 3506.05 Chemistry Emergency Equipment Readiness Check
6. VYOPF 3506.06 Post Accident Sampling Kits (RP)
7. VYOPF 3506.07 Procedure/Form Copy Update Worksheet
8. VYOPF 3506.08 TSC/EOF FTS and NAS Phone Checklist
9. VYOPF 3506.09 EOF Emergency Plan Implementing Procedures and Status Forms Book Update I 10. VYOPF 3506.10 OSC Documentation Change Tracking Form
11. VYOPF 3506.11 Control Room Emergency Plan Implementing Procedures and Status Forms Book Update OP 3506 Rev. 43 Page 4 of 16
12. VYOPF 3506.12 TSC Emergency Plan Implementing Procedures and Status Forms Book Update
13. VYOPF 3506.13 Emergency Response Telephone Number Check REFERENCES AND COMMITMENTS
1. Technical Specifications and Site Documents
a. None
2. Codes, Standards, and Regulations
a. None
3. Commitments
a. ER981874_02
4. Supplemental References
a. VYP:317, Purchasing Policy
b. Vermont Yankee EPZ Public Notification System Guide, JPS Communications, Inc.
c. YA-NOG-9101, Procedure for Operation of the Nuclear Alert System (NAS)
d. AP 0156, Notification of Significant Events
e. AP 0506, Personnel Monitoring
f. AP 0525, Dosimetry Processing
g. RP 0537, Contamination Events
h. AP 0546, Planned Special Exposures
i. DP 2521, Operation and Calibration of the Eberline Mobile Continuous Air Monitor
j. OP 2611, Stack Effluent Sampling and Analysis
k. AP 3125, Emergency Plan Classification and Action Level Scheme
1. OP 3504, Emergency Communications
m. OP 3507, Emergency Radiation Exposure Control
n. OP 3508, On-Site Medical Emergency Procedure
o. OP 3510, Off-Site and Site Boundary Monitoring
p. OP 3511, Off-Site Protective Action Recommendations
q. OP 3513, Evaluation of Off-Site Radiological Conditions
r. OP 3524, Emergency Actions to Ensure Initial Accountability and Security

Response

s. OP 3525, Radiological Coordination
t. OP 3533, Post Accident Sampling of Reactor Coolant
u. OP 3534, Post Accident Sampling of Plant Stack Gaseous Releases
v. OP 3540, Control Room Actions During an Emergency
w. OP 3541, Activation of the Technical Support Center (TSC)
x. OP 3542, Operation of the Technical Support Center (TSC)
y. OP 3544, Operation of the Operations Support Center (OSC)

OP 3506 Rev. 43 Page 5 of 16

z. OP 3545, Activation of the Emergency Operations Facility/Recovery Center (EOF/RC) aa. OP 3546, Operation of the Emergency Operations Facility/Recovery Center (EOF/RC) bb. OP 3547, Security Actions During an Emergency cc. OP 4533, Airborne Radioactivity Concentration Determination dd. DP 4562, Calibration and Operation of the SAM-2 ee. DP 4579, Respiratory Protection Equipment Inspection and Maintenance ff. AP 6807, Collection, Temporary Storage and Retrieval of QA Records gg. PP 7019, Severe Accident Management Program PREREQUISITES
1. Apparatus required:
a. Fresh batteries for equipment as required.
b. Recently calibrated and operable survey meters.
c. New seals.
2. Obtain necessary copies of VYDPF 4579.01 and 4579.04 for use in VYOPF 3506.02.

PROCEDURE A. Control Room Emergency Communications Check (Operations)

(Use VYOPF 3506.01)

1. Monthly, the Operations Department shall test the Nuclear Alert System by contacting, and requesting a callback from, each of the three states (Vermont, New Hampshire, Massachusetts) using the following procedure:

NOTE This number initiates a call to each of the three State Police agencies.

However, no audible ringing is present at the transmit station. The station receiver will continue to ring until it is answered even if the transmit station is recradled.

a. Lift handset and dial 213 for VT, 210 for MASS, 212 for NH.
b. Advise each State Police agency that answers of the test of the Nuclear Alert System, and record the results on VYOPF 3506.01.
c. Test the Group Call capability with the three State Police agencies by lifting handset and dialing 111.

OP 3506 Rev. 43 Page 6 of 16

d. Notify the following if any part of the system fails to operate:
1) Communications Department, National Grid, Westboro:

508-389-2104

2) ISO-New England: (Weekends and Off-hours in place of Westboro) 1-413-535-4384
3) Emergency Planning Manager (EPM):

Ext. 4160

e. Notify the affected state Emergency Management office if any part of the system fails to operate:
1) Mass. Emergency Management:

1-508-820-2000

2) New Hampshire Emergency Management:

1-603-271-2231

3) Vermont Emergency Management:

1-802-244-8721 or 1-800-347-0488

2. Monthly the Operations Department shall test the NRC FTS ENS phone in the Control Room as follows:
a. Lift the receiver and listen for the dial tone.
b. After receiving a dial tone, dial the first number listed below (or on the sticker located on the telephone base) using all 11 digits. If the first number is busy, proceed with the second number.

1-301-816-5100 1-301-951-0550

,c. State your name, location, and the fact that you are testing the NRC ENS.

Request that the NRC staff member call back at 700-661-4323.

OP 3506 Rev. 43 Page 7 of 16

3. Monthly, the Operations Department shall test the Southwest Fire Mutual Aid and Tri-State Fire Mutual Aid radio (Deskon II) by contacting the Keene and Shelburne dispatchers as follows:

NOTES The Deskon II phone unit is provided with both a handset and a speaker-microphone. With the handset "on hook", messages may be transmitted by holding the TRANSMIT bar depressed and speaking into the speaker-microphone. With the handset "off hook", messages may be sent by holding the transmit bar on the handset depressed while speaking into it. The red signal light on the control unit will illuminate each time either transmit function is selected.

  • If unable to contact Keene by radio, call (603) 352-1291.
a. Contact the Keene dispatcher using the following message:
1) "KCE-579, this is KCP-596, Remote 2".
2) After Keene responds, inform them that you are performing a radio check.
3) After check is performed report "Thank you. KCP-596, Remote 2 clear".

NOTE If unable to contact Shelburne by radio, call (413) 625-8200.

b. Contact the Shelburne dispatcher using the following message:
1) "Shelburne Control, this is KCP-596, Remote 2".
2) After Shelbume responds, inform them that you are performing a radio check.
3) After check is performed report "Thank you. KCP-596, Remote 2 clear".
c. If either mutual aid radios communications systems malfunction, notify the I/C Department.

OP 3506 Rev. 43 Page 8 of 16

4. Monthly, the Operations Department shall test the Unusual Event/Alert, Site Area/General Emergency Alarms using the following procedure:

NOTE Whenever the Evacuate-Off-Alert selector switch is activated, the page system volume is increased.

a. To test the Alert Alarm (used for Unusual Event and Alert emergencies) and the Evacuation Alarm (used for Site Area and General Emergencies),

perform the following:

1) turn the Page Sys Volume and Alarm Tone Select switch to the ALERT position,
2) make the following announcement over the Gaitronics:

"Attention all personnel, attention all personnel, the following is a test of the Emergency Alert and the Emergency Evacuation Alarms, please disregard." Repeat the announcement.

3) turn the Alarm Tone Control switch to the ON position for three seconds, then return the switch to the OFF position,
4) turn the Page Sys Volume and Alarm Tone Control Select switch to the OFF position,
5) turn the Page Sys Volume and Alarm Tone Control Select switch to the EVACUATION position,
6) turn the Alarm Tone Control switch to the ON position for three seconds, then return the switch to the OFF position,
7) make the following announcement over the page system:

"Testing of the Emergency Alert and the Emergency Evacuation Alarms is complete. Regard all further alarms."

8) turn the Page Sys Volume and Alarm Tone Control Select switch to the OFF position.
b. Contact the on shift Auxiliary Operators and verify that they heard both the alarm announcements and alarm signals.
c. If any alarm malfunctions, notify the I/C Department and initiate corrective action.

OP 3506 Rev. 43 Page 9 of 16

5. Route VYOPF 3506.01 to the Shift Supervisor for review.
6. Forward VYOPF 3506.01 to the Emergency Plan Coordinator (EPC) for review.
7. The EPC will file VYOPF 3506.01 in accordance with AP 6807.

B. Quarterly Emergency Equipment Check (RP)

(Use VYOPF 3506.02)

NOTE VYOPF 3506.07 can be used as an aid in determining the locations of copies of controlled procedures and forms, which are located outside their normal controlled locations.

1. Refer to any control copy and list the current revision and Department Instruction/LPC of the procedures and forms listed on VYOPF 3506.07.
2. Obtain a copy of VYOPF 3506.02.
3. Contact the Emergency Plan Coordinator (EPC) for any special instructions.
4. Inventory Emergency kit and cabinet contents against material listed on VYOPF 3506.02.
5. If necessary, update any copies of procedures or forms specified on VYOPF 3506.02. Refer to VYOPF 3506.07 for current Rev. and LPC Nos.
6. Check operability of telephones and associated phone jacks listed on VYOPF 3506.02.
7. Replace material and instrumentation as required. Materials and instruments whose calibration, expiration, or shelf life will expire prior to the next scheduled performance of this portion of OP 3506 should be replaced.
8. Attach an initialed and dated seal to the kit.
9. Make notes on the status of equipment and correct all deficiencies.

OP 3506 Rev. 43 Page 10 of 16

10. Submit the completed VYOPF 3506.02 to the RP Supervisor, who will ensure the following:
a. Any pending corrective actions are summarized (e.g., Work Request Nos.

are listed) and projected completion dates are specified.

b. All corrective actions have been taken in response to any deficiencies noted.
11. The RP Supervisor will submit VYOPF 3506.02 to the EPC who will do the following:
a. Review any pending corrective actions for appropriateness and timeliness (i.e., is projected completion date reasonable to ensure emergency preparedness).
b. Review corrective actions for appropriateness.
c. Approve status of the emergency kits and cabinets.
12. The EPC will, upon receipt of VYOPF 3506.02, identify any discrepancies, state corrective actions taken in a memo to file, and file in accordance with AP 6807.

C. Quarterly Brattleboro Memorial Hospital Emergency Equipment Check (RP)

(Use VYOPF 3506.03)

1. Refer to any control copy of OP 3508 and list the current revision and limited Procedure Change of the procedure on VYOPF 3506.03, as applicable.
2. Proceed to the BMH Emergency Wing.
3. Inventory the emergency kits contents against those items listed on VYOPF 3506.03.
4. Replace material and instrumentation as required. Materials and instruments whose calibration, expiration, or shelf life will expire prior to the next scheduled performance of this portion of OP 3506 should be replaced.
5. Make notes on the status of equipment and correct all deficiencies.
6. Submit the completed VYOPF 3506.03 to the RP Supervisor, who will ensure all corrective actions have been taken in response to any deficiencies noted.
7. The RP Supervisor will submit VYOPF 3506.03 to the EPC who will review it and approve the status of the emergency kits.
8. The EPC will file VYOPF 3506.03 in accordance with AP 6807.

OP 3506 Rev. 43 Page 11 of 16

D. Quarterly Post Accident Sample Equipment Check (RP)

(Use VYOPF 3506.06)

1. Obtain a copy of VYOPF 3506.06.
2. Inventory the kits as listed on VYOPF 3506.06.
3. Inventory the lead "pigs" as listed on VYOPF 3506.06.
4. Correct any deficiencies.
5. Submit completed VYOPF 3506.06 to RP supervision for approval.
6. RP supervision will submit VYOPF 3506.06 to the EPC who will review it and approve the status of the kits.
7. The EPC will file VYOPF 3506.06 in accordance with AP 6807.

E. Quarterly Chemistry Emergency Equipment Check (Use VYOPF 3506.05)

1. Obtain a copy of VYOPF 3506.05.
2. Inventory the two kits as listed on VYOPF 3506.05.
3. Attach an initialed and dated seal to the kit.
4. Inventory the lead "pigs" as listed on VYOPF 3506.05.
5. Correct any deficiencies.
6. Submit completed VYOPF 3506.05 to Chemistry supervision for approval.
7. Chemistry supervision will submit VYOPF 3506.05 to the EPC who will review it and approve the status of the kits.
8. The EPC will file VYOPF 3506.05 in accordance with AP 6807.

OP 3506 Rev. 43 Page 12 of 16

F. Vermont Yankee Public Notification System PreventiVe Maintenance, Testing, and Reporting

1. Northeast Mountain Radio shall perform monthly and annual preventive maintenance and surveillance services for the sirens and generators according to procedures as specified in the "Vermont Yankee Emergency Planning Zone Public Notification System Guide".
a. On a monthly basis, Northeast Mountain Radio shall provide Vermont Yankee's Emergency Plan Coordinator (EPC) with a maintenance summary for the sirens and generators. This summary shall include a listing of all repairs performed, and any system outages that occurred.

Data sheets from the monthly siren/generator maintenance shall be attached to the summary.

b. On an annual basis, Northeast Mountain Radio shall provide the Vermont Yankee EPC with a maintenance and testing program summary for submittal to the Federal Emergency Management Agency (FEMA). This summary shall document system operability as well as other tests performed to comply with FEMA guidance as defined in FEMA Guidance Memorandum PR-I.

G. Emergency Response Telephone Number Check (Use VYOPF 3506.13)

On a quarterly basis, the Emergency Planning Manager (EPM) will ensure that Emergency Response telephone numbers are updated.

1. An EP staff member will perform the following:
a. Using VYOPF 3506.13, verify that telephone numbers in OP 3504 Appendix B are accurate. If inaccuracies are found, note on VYOPF 3506.13.
b. Verify that telephone numbers within AP 0156 are accurate. If inaccuracies are found, note on VYOPF 3506.13.
c. Verify the phone numbers in the Emergency Response Telephone Directory are accurate.
d. Place the latest Vermont Yankee phone list in the Emergency Response Telephone Directory.
e. Sign and date VYOPF 3506.13.
f. Forward VYOPF 3506.13 to the Emergency Plan Coordinator.

OP 3506 Rev. 43 Page 13 of 16

2. The EPC will do the following:
a. Ensure that the appropriate procedural changes have been initiated to reflect any telephone number inaccuracies determined in Step 1.
b. Sign and date VYOPF 3506.13.
c. The EPC will file VYOPF 3506.13 in accordance with AP 6807.

H. TSCAEOF FTS and NAS Phone Test

1. Monthly, the EPC will ensure the FTS phones in the TSC and EOF, and the NAS phones are tested for operability. Test results are recorded on VYOPF 3506.08.
2. The EPC will file VYOPF 3506.08 in accordance with AP 6807.

I. Emergency Plan Implementing Procedures and Status Form Book Updates (VYOPF 3506.09, .10, .11, or .12)

Whenever an EPIP change is received from the Document Control Center, the cognizant individuals for the EOF, TSC, OSC and Control Room shall update the procedure file and status forms book for their facility.

1. Obtain a copy of VYOPF 3506.09, .10, .11 or .12 as appropriate.
2. Update the EPIP book per the procedure change memo.
3. Update status forms book with any copies of forms specified on VYOPF 3506.09,

.10, .11 or .12 as appropriate.

4. Return, even if no changes were necessary, VYOPF 3506.09, .10, .11 or .12 to the EPC for review within 10 days of Issue date.
5. The EPC shall file the VYOPF 3506 forms in accordance with AP 6807.

OP 3506 Rev. 43 Page 14 of 16

J. Power Fail Phone Test NOTE This test is normally conducted on a Sunday evening to minimize impact on plant operations. Testing is scheduled through Work Management.

Per Surveillance Test No. 4000, the power fail phone system in Vernon and Brattleboro will be tested on a semi-annual basis. A switch in the Definity phone system can force the system into a simulated power fail condition by removing battery power to the normally operated relays. When the relays release, the ten lines wired to the relays are transferred from the normal contacts to the ten assigned Telephone Numbers as specified in Appendix G to OP 3504. This action removes thirteen extensions as designated in Appendix G from the Definity phone system.  ;

The Definity phone system continues to operate normally for the other extension users.

Extensions can call each other and make long distance calls, and make tie line calls to Brattleboro. Since 10 of the 18 outgoing lines are unavailable and the Definity system is "unaware" that 10 of these lines are unavailable, dialing local numbers might be a problem. A connection with a local party might not occur; no busy signal; no denial signal. The caller can try again at which time the Definity system selects the "next" line.

Success cannot be guaranteed, and how many times the caller needs to try is uncertain. It should be noted at this point that the Control Room could use one of their 3 power fail phones to reach a local number.

The test consists of checking each of the 13 power fail phones for call out capabilities. A call is made to each of these phones to test ringing. The approximate time to complete the test is about 20 minutes, assuming all locations are readily accessible.

1. CONSULTMThCHS
a. Contact AT&T Operations Center in Denver and inform them of the impending test.
b. Contact the Control Room for consent to begin the test.
c. Contact the Security Shift Supervisor that the test is beginning.
d. Contact the Control Room, Security Shift Supervisor, and AT&T Operations Center when the test is finished and the Definity system is back to normal.

OP 3506 Rev. 43 Page 15 of 16

2. CONTROL ROOM NOTE In the event that plant activities do not warrant continuation of the test, contact CONSULT/TECHS to activate switch to terminate test and return Definity system back to normal operation.
a. When contacted by CONSULTITECHS that the test is being initiated, make the following Gai-Tronics announcement:

"A TEST OF THE POWER FAIL PHONE SYSTEM IS BEING CONDUCTED. DURING THE TEST, OUTSIDE CALLS WILL BE RECEIVED AND LOGGED BY GATE 2, AND THEY WILL NOT BE TRANSFERABLE."

(Repeat announcement.)

b. When contacted by CONSULT/TECHS that the test has ended, make the following Gai-Tronics announcement:

"THE POWER FAIL PHONE SYSTEM TEST HAS ENDED. PHONE SYSTEM IS BACK TO NORMAL."

(Repeat announcement.)

3. GATE 2 NOTE Incoming calls, dialing 257-7711, ring at Gate 2 and the Main Office for the first three lines (257-7711, 257-7712, and 257-7713), but cannot be transferred.
a. If an outside call is received, take caller's name and number and have VY person to be contacted call the party back.

FINAL CONDITIONS

1. All equipment is complete and in operable condition.
2. All documentation retained in accordance with AP 6807.

OP 3506 Rev. 43 Page 16 of 16

CONTROL ROOM MONTHLY EMERGENCY COMMUNICATIONS CHECKLIST Date Time A. Nuclear Alert System

1. Successful Test with Vermont (213) D Yes 5 No Callback from Vermont successful a Yes a No
2. Successful Test with New Hampshire (212) a Yes 5 No Callback from New Hampshire successful 5 Yes 5 No
3. Successful Test with Massachusetts (210) 5 Yes D No Callback from Massachusetts successful 5 Yes 5 No
4. Successful Group Call Test with VT/NH/MA(111) 0 Yes a No
5. If the test is unsuccessful, note the nature of the discrepancy and the individuals, and agencies contacted.

B. NRC ENS Phone Test

1. Successful Test with the NRC 5Yes DNo
2. Callback from the NRC successful 5 Yes D No
3. If unsuccessful, report the loss as directed per AP 0156.

C. Southwest Fire Mutual Aid and Tri-State Mutual Aid Radio Tests

1. Successful test with Keene Dispatcher 5 Yes D No
2. Successful test with Shelburne Dispatcher 5 Yes a No I/C Department notified of the following discrepancies:

VYOPF 3506.01 OP 3506 Rev. 43 Page 1 of 2

CONTROL ROOM MONTHLY EMERGENCY COMMUNICATIONS CHECKLIST (Continued)

D. Emergency Alert and Emergency Evacuation Alarms

1. Emergency Alert Alarm Test Heard by Auxiliary DJ Yes Q No Operators
2. I/C Department notified of the following-discrepancies:

Testing Performed By /

Operator (Print/Sign) Date Reviewed By_ _ _

Shift Supervisor (Print/Sign) Date Reviewed By /

EPC (Print/Sign) Date VYOPF 3506.01 OP 3506 Rev. 43 Page 2 of 2

MBVkGENCY EQUIPMENT CHE&KLIST ITEMS INITIALS I. Outer Gate Guardhouse A. Inspect respirators (6) (as per DP 4579)

1. Check expiration date on filter canisters (6)
2. Check particulate canisters (6)
3. VYDPF 4579.04 completed and submitted for review B. Mobile UHF System Base Radio Station (Located in locked section of Gate 1)

Performed by: Date:

(Print/Sign)

II. Emergency Operations Facility (EOF) - Brattleboro A. Emergency Equipment Cabinet #1 (Room 124) for use by the Site Recovery Manager

1. Emergency Notepads
2. Redi-Letter Speed Sets
3. Procurement Log Book
4. Magnetic Tags
5. Site Recovery Manager Log
6. Site Recovery Manager Notifications Log
7. Site Recovery Manager Team Badges -_-_-
8. NRC Response Team Badges
9. North American Emergency Response Guidebook (2)
10. Emergency Plan (Copy #12)
11. Emergency Plan Implementing Procedures (Controlled Copy
  1. 35)

VYOPF 3506.02 OP 3506 Rev. 43 Page 1 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

12. ERF Directory
13. Status Forms Book/SRM Manual
14. YA-NOG-9101, Procedure for Operation of the Nuclear Alert System (NAS)(In SRM Manual/Status Forms Book) Rev. /DI/LPC#
15. PP 7019, Severe Accident Management Program (Controlled Copy #5)
16. SAM RPV Cutaway Operator Aid (In front of PP 7019 Binder)
17. Vermont Yankee Mini-Prints (Copy #41)
18. INPO Emergency Resources Manual (2)
19. Media Advisor's Clipboard with Tech. Rep. Escalation Checklist
20. NRC Region I Incident Response Plan (Vols. 1 & 2)

(Uncontrolled)

21. VY Tech Specs (Copy #25)
22. Framatome ANP Emergency Support Plan (Copy #33)
23. Technical Guidelines for EAL Categories & Events (Copy #4)
24. Large EAL Sheets from AP 3125 (2)
25. State Advisor Reference Book
26. Tote with office supplies
27. ENS Telephone Headset
28. Emergency Operating Procedures (Hard Cards EOP1 - EOP6 (in Room 124)
29. AP 3125 EALs - laminated (in Room 124)
30. Personnel Status Board (in Room 124)

VYOPF 3506.02 OP 3506 Rev. 43 Page 2 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

31. OT 3100 Reactor Scram -

Laminated hard card.

NOTE Operability of the FTS and NAS phones is checked by Emergency Planning using VYOPF 3506.08.

32. Telephones in Cabinet #1:
a. #1- (NAS) (Checked by E-Plan monthly)
b. #6
c. #8 - Speakerphone (for Media Advisor)
d. #3A - Alternate Auto Ring Down Phone and EASA-PHONE speaker. (Use to contact Control Room)
33. Telephones, wall mounted in Recovery Planning Area (Room 126):
a. #3 (Primary Ringdown) with headset (not wall mounted)
b. #3A (Alternate Ringdown)
c. #20
d. #19
e. #33
f. #40
g. #41
h. #61 (Powerfail)
i. #69 (FTS) (Checked by E-Plan monthly)
j. #70 (FTS) (Checked by E-Plan monthly)
k. #75 (FTS) (Checked by E-Plan monthly)
34. PC and multi-media computer (2)

(Room 126 & 125)

VYOPF 3506.02 OP 3506 Rev. 43 Page 3 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS B. Emergency Equipment Cabinet #2 for Use By the EOF Coordinator, Manpower &

Planning, ESG

1. Letter trays (3)
2. Emergency Notepads
3. Redi-Letter Speed Sets
4. 3-Hole Punch
5. Emergency Plan (Controlled Copy
  1. 8)
6. Emergency Plan Implementing Procedures (Controlled Copy
  1. 34)
7. EOF Coordinator's Clipboard and Notepad
8. EOF Coordinator's Logbook
9. Purchasing Coordinator's Clipboard and VYP:317, Purchase Order Processing Procedure
10. UFSAR (Controlled Copy #22)
11. ERF Directory (2)
12. Status Forms Book
13. Core Damage Assessment Binder (from PP 7019) (Uncontrolled Copy)
14. Two (2) Totes with office supplies (EOF Staff and ESG)
15. Action Item/Status Board Tags (for use on white board)
16. Fax machines (3)
a. #5 (Hewlett Packard) (Cabinet #2)
b. #6 (Hewlett Packard) (Cabinet #2)
c. (Sharp) (Cabinet #2)

VYOPF 3506.02 OP 3506 Rev. 43 Page 4 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

17. Telephones: (Wall Mounted in Briefing Area (Room 125))
a. #23 (Room 125)
b. #24 (Room 125)
c. #60 (Room 125)
18. Telephones: (Wall Mounted in (Room 122))
a. #11 (Room 122)
b. #25 _________ (Room 122)
c. #58 (Room 122)
d. #79 (Room 122)

C. Emergency Equipment Cabinet #3 for use by the Radiological Supervisor

1. Off-Site Team Road Maps
2. Emergency Plan (Controlled Copy
  1. 30)
3. Emergency Plan Implementing Procedures (Controlled Copy
  1. 38)
4. Guidelines for Projection of Potential Radioactive Material Release During an Emergency
5. Status Forms Book (2)
6. VYOPF 4533.01, Air Sample Forms (in status forms books) Rev.

LPC#

Rev.

7. METPAC floppy disks (3)
8. METPAC User Manual & Technical Description (version 5.4)
9. ERF Directory
10. Radiological Health Handbook (2)
11. Core Damage Assessment Binder (from PP 7019)(uncontrolled copy)
12. Rad Coordinator Notebook -

OP 3525 VYOPF 3506.02 OP 3506 Rev. 43 Page 5 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

13. Emergency Notepads
14. 10 Mile EPZ Maps (2)
15. Rad Supervisor's Clipboard
16. Tote with office supplies and

%What If' dose projection stamp and calculators

17. In/Out trays (7) (3 are for Rad Data for each state)
18. Preprinted Magnetic Labels for Off-Site Teams (team, time, location, air code, and dose rate)
19. Potassium Iodide (KI)
a. Check expiration date (Exp. date)
20. Redi-Letter Speed Sets (1 box)
21. HPN Telephone Headset
22. Thirty-four (34) Small Poly Bags
23. Inspect respirators (12) per DP 4579
a. Check expiration date on filter canisters (12) (Exp. date)
b. Complete VYDPF 4579.04 and submit for review
24. One (1) Box Air Sampler Filters (50 mm)
25. Ten (10) Air Sampler Charcoal Cartridges
26. Nine (9) Two Dram Vials
27. Ten (10) Silver Zeolite Air Sample Cartridges (Sealed in plastic)

VYOPF 3506.02 OP 3506 Rev. 43 Page 6 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

28. Box of non-time critical items
a. Six (6) Air Sampler Environmental Cartridges
b. Twelve (12) Small Poly 23 ml Bottles C. Eight (8) Large Poly Bottles
d. Twelve (12) Medium Poly Bags
29. Distribution Trays (7)
30. Telephones: (Wall Mounted in Rad Assessment)
a. #21 (Powerfail) ___ _ (Room 124)
b. #22 (Room 124)
c. #39 (Room 124)
d. #71 (FTS) (Room 124) (Checked by E-Plan monthly)
e. #72 (FTS) (Room 124) (Checked by E-Plan monthly)
f. #76 (FTS) (Room 124) (Checked by E-Plan monthly)
31. Area Map/Dispersion Wheel (mounted on wall in Room 124)
32. Fax Machine (Room 124)
33. Rulers (2)

D. Emergency Equipment Cabinet #4 for use by Rad Assessment

1. Low Volume Air Sampler (1)
a. Calibration Up-to-Date (Cal. Due Date)
b. Operational Check
c. Left with fresh paper and cartridge in holder
2. "Bull Horn" (1)
a. Operational Check
3. Electrical Extension Cords (3)
4. Dosimeter Charger (1) Check OK VYOPF 3506.02 OP 3506 Rev. 43 Page 7 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

5. High Range Dosimeters (20)
a. Calibration Up-To-Date
6. Gamma Dose Rate Meter (2)
a. Battery Check OK
b. Calibration Up-To-Date (Cal. Due Date)
7. Flashlights (12)
8. Batteries (12)
9. Check Source (Strength >1 mR/hr but <4 mR/hr)
10. Telephones: (mounted in Chem.

& Sample Analysis Lab)

a. #14 (Room 120)
b. #15 (Room 120)
11. SAM-II Ba-133 Source E. Room #118 for Use By Nuclear Regulatory Commission (NRC) Emergency Response Personnel NOTE The Fax machine will be brought to the facility by NRC emergency responders.
1. Telephones: (Wall Mounted unless other wise specified)
a. #16 (Room 118)
b. #17 (Room 118)
c. #18 (Room 118)
d. #57 (Room 118)
e. #73 (FTS) (Checked by E-Plan monthly)
f. #74 (FTS) (Checked by E-Plan monthly)
g. #89 (Room 118)
h. #90 (Room 118)
2. Computer with RTIME operational (PSS)

VYOPF 3506.02 OP 3506 Rev. 43 Page 8 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS F. Room #123 OSMT Communications Area

1. UHF Radio Transmitter/Receiver Systems (2)
2. Area Map/Dispersion "Wheel"
3. 10 Mile EPZ Map
4. Air Sample codes for I-131 Air concentrations
5. Field Sample Thyroid Dose Nomogram
6. Site Boundary Map
7. Decnet Terminal
8. Telephones: (wall mounted)
a. #29 (Powerfail) (Room 123)
b. #30 (Room 123)

G. Room #128 for Use by EOF Engineering Support Group

1. #62 (Room 128)
2. #65 (Room 128)
3. #13 (Room 127)
4. #63 (2) (Room 127)
5. Computer with RTIME Operational (PSS)

VYOPF 3506.02 OP 3506 Rev. 43 Page 9 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS H. The following equipment is located in the Sprinkler Room of the Training Center (Room 118):

1. Sealed decontamination barrel containing non-time critical items If not sealed, inventory contents, ensure the following are available, and reseal.
a. Towels (12)
b. Face Cloths (12)
c. Decon Soap (3)
d. Plastic Bags (12)
e. Poly 6 ml x 6' x 100' (1 roll)
f. Paper Towels (5 boxes)
g. Scissors (1 pair)
h. Blotter Paper (3 10' sections)
i. Masking Tape (5 rolls)
j. Cloth Gloves (2 bundles)
k. Surgeons Gloves (1 box)
1. Plastic Basins (3)
m. Scrub Brushes (12)
n. "Radioactive Material*

Tape (2 rolls)

o. Paper Suits (10 pair)
2. RP 0537, Contamination Events Rev. LPC#
3. (1) VY Emergency Off-Site Dose Rate Nomogram #1 #1
4. (4) EAL Charts - AP 3125 #2 #2
5. (1) Area Map/Dispersion.

"Wheel #4 -_-_- _ #4

6. (1) Plant Parameter Status Board #5 #5
7. (1) 50 Mile Ingestion Pathway Map #9 #9
8. Manpower and Planning Assistant In-Plant Status Board #11A #11 VYOPF 3506.02 OP 3506 Rev. 43 Page 10 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

9. Manpower and Planning Assistant Off-Site Status Board #11B #11
10. (1) Emergency Operations Facility Organization #12 #12
11. (1) Vermont Yankee Emergency Management Organization #13 #13
12. (3) RM-14 with HP-210 Probe
a. Battery Check OK
b. Calibration Up-To-Date (Cal. Due Date)
13. Personnel Monitoring Team Clipboard and Logbook.
14. Wireless Headset (charging) for VY use NRC FTS HPN Phone
15. 'Authorized Personnel Sign for Training Lobby Entrance
16. Tote for Manpower and Planning containing:
a. Emergency Notepads
b. Clipboard and logbook
c. Clipboard containing area maps
d. ERF Directory
e. Small tote with office supplies
17. Fax machine for Engineering Support Group use in room 128.

VYOPF 3506.02 OP 3506 Rev. 43 Page 11 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS I. Miscellaneous Items

1. Test communications with New York State Emergency Management Office by dialing 1-518-457-2200 (backup 518-457-6811). Advise of the test and record name of NY State Official contacted.

(NY State Official)

2. Test data line for Dose Tracking System - Ingress.

Perform the following steps for system operability:

a. DEC terminal plugged into wall module, jack
  1. 28d, in OSMT Communications Area.
b. The system is ready to operate:
1) Type in RWP1 account name and password ID.
2) At the menu, the HIS is ready for access.
3) To log-off the HIS, at the menu:

a) select the EXIT option and press the <RETURN> key,

3. METPAC PC System operational.
a. Log onto the system and record METPAC version. METPAC Version:
4. SAM-II - Perform source check per DP 4562 to verify proper operation (source is located in Cabinet #4, EOF). (Cal. Due Date)

Performed by:_ Date:

- (Print/Sign)

VYOPF 3506.02 OP 3506 Rev. 43 Page 12 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS III. OSC Equipment A. Status Board (located in hallway mounted on wall)

B. RP Office Area

1. OSC Phone Jacks (located in RP Office (ER981874-02)
a. #11 (Primary Ring Down)
b. #27 (Alternate Ring Down)
c. #55
d. #56
2. Computer with RTIME (PSS)
a. Radiation Protection Superintendent's Office operational C. E-Kit Storage Area
1. Air Samplers (4)
a. Operational check (run for about 3 mins.)
b. Calibration date CiTIbration Date
c. Left with fresh filter paper and cartridge in holders
d. Battery on charger (1)

(used for operational checks)

2. RM-14 with HP-210 Probe (4)
a. Battery check OK
b. Calibration up-to-date Calibration Due Date Calibration Due Date VYOPF 3506.02 OP 3506 Rev. 43 Page 13 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

3. Gamma Dose Rate Meter (5)
a. Battery check OK
b. Calibration up-to-date Calibration Due Date Calibration Due Date
4. Inspect respirators (16) per DP 4579
a. Check expiration date on filter canisters (16)
b. VYDPF 4579.04 completed and submitted for review D. Site Boundary Team Kit
1. Site Boundary clipboard
a. OP 3510 (2 copies)
b. Paper pad
2. High range dosimeters (4)
a. Calibration up-to-date (Cal. Due Date)
b. Dosimeter charger operational check
3. Check Source
a. Strength >1 mR/hr. and

<4mR/hr

4. Potassium Iodide (WI)
a. Check expiration date (Exp. Date)
5. Stopwatch
a. Operational check
6. Flashlight (1) operational check
7. Batteries *D" cells (2)

VYOPF 3506.02 OP 3506 Rev. 43 Page 14 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

8. Sealed container of non-time critical items If not sealed, inventory contents, ensure the following are available, and reseal.

Filter paper, air sample (1 box)

Parafilm Tweezers (1 pair)

Surgeons gloves (1 box)

Charcoal filter cartridges (6)

Ten (10) Silver zeolite cartridges (sealed in plastic)

Pencils (approx. 4)

Filter/Cartridge Collection envelopes (6)

E. Off-Site Emergency Kits NOTE During an emergency, off-site teams will be issued portable radios in accordance with procedure OP 3504, Emergency Communications".

Kit 1 Kit 2 Kit 3 (BLUE) (GREEN) (BLACK)

1. OP 3510 (3 copies)
2. High range dosimeters (4)
a. Calibration date Calibration Date
b. Dosimeter charger -

operational check

3. Check Source
a. Strength >lmR/hr. and

<4mR/hr

4. Potassium Iodide (KI)
a. Check expiration date Expiration Date
5. Stopwatch
a. Operational check VYOPF 3506.02 OP 3506 Rev. 43 Page 15 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS Kit 1 Kit 2 Kit 3 (BLUE) (GREEN) (BLACK)

6. Flashlights (2) operational check
7. Batteries "D" cells (6)
8. Pre-Determined Sample Locations Sheet
9. Sealed container of non-time critical items If not sealed, inventory contents, ensure the following are available, and reseal.

Poly bottles (3)

Poly bags (3)

Smear paper (1 box)

Activated charcoal filter cartridges (6)

Ten (10) Silver zeolite cartridges (sealed in plastic)

Marking pen (approx. 4)

Screwdriver Keys to Envir. Stations Filter/Cartridge Collection envelopes (6)

Off-Site Team Clipboard Paper pad Filter paper, air sample (1 box)

Parafilm Tweezers (1 pair)

Surgeons gloves (1 box)

VYOPF 3506.02 OP 3506 Rev. 43 Page 16 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS F. All equipment and materials returned to the kits and the kits sealed G. RP Checkpoint

1. OSC Dosimetry Kit
a. Dosimeters
1) 20 Self Reading Dosimeters (SRDs)
2) 1 SRD Charger (AC)
3) 20 TLDs
4) 2 TLD Controls
5) 6 Extremity TLDs
6) 2 Extremity Controls
7) High Range Dosimeters (13) a) Calibration up-to-date (Cal. Due Date)
b. Procedures
1) AP 0506, Personnel I Monitoring
2) AP 0525, Dosimetry I Processing
3) AP 0546, Planned I Special Exposure
4) OP 3507, Emergency Radiation Exposure I Control
c. Forms
1) NRC Form 4
2) Exposure History Release Forms I 3) General Access RWP
4) VYAPF 0525.06, Pregnant Woman Declaration Form VYOPF 3506.02 OP 3506 Rev. 43 Page 17 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

5) VYAPF 0506.08, Multibadge TLD Location Form
6) VYOPF 3507.01, Personnel Exposure Log -
7) VYAPF 0506.07, Administration Radiation Exposure Control Change Request
8) VYAPF 0525.09, Lost, Damaged or Misused Dosimetry Report
9) VYAPF 0525.08, Visitor/Tour Member Logsheet
10) AF.01, PADs Consent Form
11) VYAPF 0525.07, Reg. Guide 8.13 Logsheet -_-
12) VYAPF 0525.11, RWP Sign-In Sheet
2. SAM Perform source check per DP 4562 to verify proper operation (source is located in RP Checkpoint source locker) (Cal. Due Date)
3. Medical Team Emergency Electronic Dosimeters (5)
a. Calibration Cal Due DAte up-to-date
b. Replace batteries -_-
4. Computer w/RTIME operational (Checkpoint) (Connected to Plant ERFIS)

VYOPF 3506.02 OP 3506 Rev. 43 Page 18 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS H. Maintenance Shop Entrance

1. Medical Team Emergency Electronic Dosimeters (5)
a. Calibration Cal Due DAte up-to-date
b. Replace batteries Performed by: Date:

(Print/Sign)

IV. Inner Gatehouse A. General Equipment

1. RM-14 with HP-210 probe (this can be standby unit for portal monitor)
a. Battery check OK
b. Calibration up-to-date (Cal. Due Date)
2. Inspect respirators (6) as per DP 4579
a. Check expiration date on filter canisters (Exp. Date)
b. Check particulate canisters (Exp. Date)
c. VYDPF 4579.04 completed and submitted for review
3. Verify with Security that a minimum of five (5) bag radios are available for use B. Site Boundary Team Kit
1. Gamma Dose Rate Meter
a. Battery check OK
b. Calibration up-to-date (Cal. Due Date)

VYQPF 3506.02 OP 3506 Rev. 43 Page 19 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

2. Air Sampler (Cal. Due Date)
a. Operational check (run for about 3 min.)
b. Left with fresh filter paper and cartridge in holders
c. Battery on charger for testing only (may use OSC's)
3. Potassium Iodide (KI)
a. Check expiration date (Exp. Date)
4. Stopwatch
a. Operational check I 5. OP 3510
6. Batteries OD" cells (6)
7. Flashlight (1) operational check
8. High range dosimeters (10) (Cal. Due Date)
9. Dosimeter charger (1)
10. Check source
a. Strength >lmR/hr. and

<4mR/hr

11. Sealed box of non-time critical items If not sealed, inventory contents, ensure the following are available, and reseal.

Filter papers (1 box)

Charcoal cartridges (6)

Ten (10) Silver zeolite cartridges (sealed in plastic)

Tweezers (1 pair)

Surgeons gloves (1 box)

Filter/Cartridge Collection envelopes (6)

Performed by: Date:

(Print/Sign)

VYOPF 3506.02 OP 3506 Rev. 43 Page 20 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS V. Main Control Room A. General Equipment

1. Area Map/Dispersion wheel"
2. High range dosimeters (5)
a. Calibration up-to-date (Cal. Due Date)
b. Dosimeter charger operational check
3. Potassium iodide (KI)
a. Check expiration date (Exp. Date)
4. Emergency Plan
5. Emergency Plan Implementing Procedures
6. Emergency Logbook
7. Status Forms Drawer
8. SAM RPV Cutaway Operator Aid B. Inspect Scott-Pacs (6) (as per DP 4579)
1. VYDPF 4579.01 completed and submitted for review Performed by: Date:

(Print/Sign)

VYOPF 3506.02 OP 3506 Rev. 43 Page 21 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS VI. Technical Support Center A. General Equipment - Offices behind TSC Conference Room

1. Mobile UHF System Base Radio Station and ERF Directory
2. Offsite Dose Rate Nomogram
3. Area Map/Dispersion "Wheel_

B. Emergency Equipment Cabinets

1. TSC Primary Position Title Tags (ziplock bag)
2. VYOPF 3542.01, Personnel Accountability Log on 5 clipboards
3. Emergency Notepads,
4. Redi-Letter Speed Sets
5. Tote with office supplies
6. ENS Telephone Headset -
7. Magnetic accountability signs for the doors (3)
8. Emergency Plan (Copy #3)
9. Emergency Plan Implementing Procedures (Copy #3)
10. PP 7019, Severe Accident Management Program (2)

(Controlled Copies 2 and 2A)

(#2 may be located in the TSC area phone room) _

11. SAM RPV Cutaway Operator Aid (in front of PP 7019 book) (2) -
12. Status Forms Book
13. VYOPF 4533.01, Air Sample Form (6) Rev. LPC#
14. Clipboard with: Call-In List, VY Phone List, EAPL, Respirator Qualifications, VY Org. Chart al 15. ERF Directory (3)

VYOPF 3506.02 OP 3506 Rev. 43 Page 22 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

16. TSC Logbook
17. TSC personnel Sign-In Forms Book (white 3-ring binder)
18. Emergency Resources Manual
19. North American Emergency Response Guidebook (2)
20. Reactor Building Phone List
21. Region I Incident Response Vol. I & II
22. ERDS Data Continuous Communicator Book
23. Inspect respirators (4) (as per DP 4579)
a. Check expiration date on filter canisters (Exp. Date)
b. VYDPF 4579.04 completed and submitted for review
24. Potassium iodide (KI)
a. Check expiration date (Exp. Date)
25. High range dosimeter (4) (Cal. Due Date)
26. Gamma dose rate meter (Cal. Due Date)
27. Air sampler, low volume, with charcoal cartridge (1) (Cal. Due Date)
a. Operational Check
b. Left with fresh filter paper and cartridge in holder
28. Box of safety goggles and hearing protection
29. Sealed container of non-time critical items If not sealed, inventory contents, ensure the following are available, and reseal.
a. Charcoal filter cartridges (6)

VYOPF 3506.02 OP 3506 Rev. 43 Page 23 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

b. Six (6) Silver zeolite (sealed in plastic)
c. Filter paper, air sample (1 box)
d. Tweezers (1 pair)
e. Surgeons gloves (1 box)
f. Smear papers (1 box)
30. Perform a functional test on four (4) RM-16's
31. Check cal-due date on TSC Cam (Cal. Due Date)
a. Check TSC Cam for chart paper
b. Check the TSC Cam for filter paper and charcoal cartridge (refer to DP 2521)
c. Turn on the TSC Cam and perform the daily operational checks per DP 2521
1) If any problems are identified, correct the deficiency and notify the RP Supervisor (instruments).
d. Restore the TSC Cam to standby status
32. Dosimeter charger operational check
33. Classification Signs (on top of cabinets)
34. RM-14 with HP-210 Probe (1)

(in conference room) (Cal. Due Date)

35. Laminated charts (in Conference Room):
a. AP 3125 - EALs (2)
b. OT 3100 - Reactor Scram
c. EOPs #1-6 VYOPF 3506.02 OP 3506 Rev. 43 Page 24 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

d. RPV & Containment EOP/SAG Ref and Action Levels NOTE The FTS phones are stored in the EP cabinet outside of the TSC Communications Room, and are plugged into the appropriate wall jacks in the Computer User's Room, TSC Communications Room, and the NRC front office (see Figure 4 of OP 3504).
36. FTS Telephones: (Checked by E-Plan monthly)
a. #39
b. #40 (wall mounted)
c. #41 (wall mounted)
d. #42 (wall mounted)
e. #43
f. #44
g. #45
h. #47 VYOPF 3506.02 OP 3506 Rev. 43 Page 25 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

37. TSC Phone Jacks (ER981874_02)
a. #18
b. #21 I c. #22 with headset
d. #26 (wall mounted)
e. #27 (wall mounted)
f. #28
g. #29
h. #34
i. #55 (copier room)
j. #56 (cordless)

C. Computers with RTIME (connected to Plant ERFIS)

1. General Manager's office operational
2. NRC Resident Inspector's office operational Performed by: Date:

(Print/Sign)

VYOPF 3506.02 OP 3506 Rev. 43 Page 26 of 27

EMERGENCY EQUIPMENT CHECKLIST (Continued)

ITEMS INITIALS

<.Aiscrepancies:

Page Section Remarks Other Comments:

Must be returned to EPC within 14 days of completion by RP Technician.

Reviewed By /

RF supervisor (Print/Sign) Date Approved By_ /

EPC (Print/Sign) Date EPC Comments: Q Memo to File Attached VYOPF 3506.02 OP 3506 Rev. 43 Page 27 of 27

BRATTLEBORO MEMORIAL HOSPITAL EMERGENCY EQUIPMENT CHECKLIST Date_

Directions: Initial inventoried items and note comments in the right-hand column. Replace equipment as required.

Item Initials

1. Instruments and Dosimetry
a. Gamma Dose Rate Survey Meter
1) Instrument VY # (Cal. Due Date)
2) Battery test
b. Beta/Gamma Monitor, RM-14 with HP-210 Probe VY # (Cal. Due Date)
1) Battery test
c. 0-500 mR Self-reading pocket dosimeters (10) (Cal. Due Date)
d. Thermoluminescent dosimeters (10) (Cal. Due Date)
e. Dosimeter Charger
1) Check operability
f. The Vinton ring dosimeters (10)
g. Check Source (located at Nurse's Station)
2. Procedures
a. Brattleboro Memorial Hospital Radiologically Contaminated Casualty Protocol (2)
b. OP 3508, On-Site Medical Emergency Procedure Current Rev. #

LPC # _- Rev LPCt

3. Lead container for high activity samples
4. Packaged disposable table top with inflatable water containers VYOPF 3506.03 OP 3506 Rev. 43 Page 1 of 2

BRATTLEBORO MEMORIAL HOSPITAL EMERGENCY EQUIPMENT CHECKLIST (Continued)

9. Equipment and Supplies
a. Herculite Floor Covering
b. 2-inch Masking tape (4 rolls)
c. Signs OCaution - Radiation Area" (4)
d. Radioactive Material Tags
e. Barrier tape (1 roll)
f. Step-off pads (2)
g. Yellow 30 gal. drum (1)
h. Hose for table top drain
i. Potassium Iodide Performed by: Date:

RP Technician (Print/Sign)

Discrepancies or Comments:

Reviewed By /

RP Supervisor (Print/Sign) Date Approved By /

EPC (Print/Sign) Date VYOPF 3506.03 OP 3506 Rev. 43 Page 2 of 2

CHEMISTRY EMERGENCY EQUIPMENT READINESS CHECK Initials I. Liquid PASS Sampling Kit (Chemistry Lab)

A. 6 syringes with 1.5 inch needles (3 cc)

B. 1 syringe shield C. 12 offgas vials with stoppers D. 12 two-dram vials E. One 500 ml. graduated cylinder (located at PAS panel or Chem Lab)

F. 1 vacuum gauge with needle G. 10 spare offgas vial stoppers H. Large and small tongs I. Flashlight w/batteries (functional)

J. 2 plastic bags for RB 303' samples II. Plant Vent Stack PASS Sampling Kit A. Spare panel needle B. 2 inline cartridge holders in kit C. 1 box of glass fiber filter paper (minimum of 10 filters)

D. 12 envelopes for air samples E. 15 silver zeolite cartridges, sealed in plastic F. 6 CP-100 Charcoal Cartridges G. 12 offgas vials with stoppers H. 1 vacuum pump with needle I. 1 shield for syringe J. 5 copies of VYOPF 2611.03 and 2611.10 and 10 copies of VYOPF 2611.04 in the current revision K. Large tongs VYOPF 3506.05 OP 3506 Rev. 43 Page 1 of 2

CHEMISTRY EMERGENCY EQUIPMENT READINESS CHECK (Continued)

Initials L. 10 copies each of VYOPF 3534.01 and VYOPF 3534.02 in the current revision M. Flashlight w/batteries - Functional Check N. 2 wrenches for PAS needle changeout

0. 9 3cc syringes w/needles P. 1 inline cartridge holder installed at Stack Q. 1 gas marinelli III. Lead Shield "Pigs" A. One lead brick with cutouts for liquid samples B. Two lead "pigs" with handles at the Plant Vent Stack Base.

Performed by: Date:

Chemistry Technician (Print/Sign)

<_\ Discrepancies or Comments:

Reviewed By /

Chemistry Supervision (Print/Sign) Date Approved By /

EPC (Print/Sign) Date VYOPF 3506.05 OP 3506 Rev. 43 Page 2 of 2

POST-ACCIDENT SAMPLING KITS (RP)

ITEMS INITIALS REMARKS I. Containment Sampling (RP Checkpoint)

A. 6 - syringes .

B. 1 - syringe shield I C. 3 - sample bombs w/stoppers D. 6 - spare vial stoppers E. 12 - offgas vials w/stoppers P. 2 - male quick connects G. 1 - vacuum gauge w/needle H. 1 - 5 cc syringe I. High range dosimeters (3) (Cal. Due Date)

J. Large tongs II. Miscellaneous Lead Shields (to be used in Post-Accident Sampling)

A. Two shields for containment sample bombs (located on platform in radwaste hallway)

Performed by: Date:

RP Technician (Print/Sign)

Discrepancies or Comments:

Reviewed B1V /

RP Supervisor (Print/Sign) Date Approved B)Ir /

EPC (Print/Sign) Date VYOPF 3506.06 OP 3506 Rev. 43 Page 1 of 1

PROCEDURE/FORM COPY UPDATE WORKSHEET BRATTLEBORO VERNON PROCEDURE/FORM LOCATIONS _ LOCATIONS No. Rev. LPC# #1 #2 #3 S. Rm TSC 0537 3510 -

4533.01 _ _

7019 0 VYP:3 17 t I I t I t

____________ 1 1 L VYOPF 3506.07 OP 3506 Rev. 43 Page 1 of 1

TSCIEOF FrS AND NAS PHONE CHECKLIST A. Emergency Operations Facility - Brattleboro

1. Test NRC FTS Phones Since all the FTS phones use the same telephone number(s) to contact the NRC Operations Center in Rockville, MD, the ENS phone is tested first to verify the operability of the circuit between Brattleboro and Rockville. The remaining FTS phones can be tested without contacting the NRC Operations Center.
a. ENS Test the Brattleboro NRC FTS ENS line by using phone (#75) in the Site Recovery Manager's Room, and implementing the following steps:
1) Lift the receiver and listen for the dial tone.
2) After receiving a dial tone, dial the first number listed below (or on the sticker located on the telephone base) using all 11 digits. If the first number is busy, proceed on with the second number.

1-301-816-5100 1-301-951-0550 1-301415-0550

3) State your name, location, and the fact that you are testing the Brattleboro EOFIRC ENS.

Request that the NRC staff member call back at 700-661 4329.

4) Results Date:

Successful call to the NRC: E YES O NO NRC

Contact:

Time:_

Successful callback from the NRC: El YES a NO NRC

Contact:

Time:

5) If not completely successful in Step 4), notify the Control Room immediately.
b. Other NRC FTS Phones The remaining FTS phones in Brattleboro are tested by calling each FTS phone from a different FTS phone.

VYOPF 3506.08 OP3506Rev. 43 Page 1 of 3

TSC/EOF FTS AND NAS PHONE CHECKLIST (Continued)

2. Test Nuclear Alert System (NAS) Orange Phone:
a. Place a call to each of the three states NAS extensions as specified below, requesting a call back to ensure system operability.

SRM Office (NAS #1, Ext. 511) Date:

Call Out: Return Call:

Time Time__ _ _

VT (213) __ VT_

Contact Initials Contact Initials NH (212) _ NH Contact Initials Contact Initials MA (210) 1 0 ) MA Contact Initials Contact Initials States Room (NAS #2, Ext. 411) Date:

Call Out: Return Call:

Time Time_

VT (213) VT_

Contact Initials Contact Initials NH (212) NH_ _ _

Contact Initials Contact Initials MA (210) 1 0 ) MA Contact Initials Contact Initials

3. Test performed by:. l (Print/Sign) Date B. Technical Support Center - Vernon
1. Test NRC FTS Phones Since all the FIS phones use the same telephone number(s) to contact the NRC Operations Center in Rockville, MD, the ENS phone is tested first to verify the operability of the circuit between Vernon and Rockville. The remaining FTS phones can be tested without contacting the NRC Operations Center.
a. ENS Test the Vernon NRC FTS ENS line by using phone (#41) in the TSC Communications Room, and implementing the following steps:
1) Lift the receiver and listen for the dial tone.
2) After receiving a dial tone, dial the first number listed below (or on the sticker located on the telephone base) using all 11 digits. If the first number is busy, proceed on with the second number.

1-301-816-5100 1-301-951-0550 1-301-415-0550 VYOPF 3506.08 OP 3506 Rev. 43 Page 2 of 3

TSC/EOF FTS AND NAS PHONE CHECKLIST (Continued)

3) State your name, location, and the fact that you are testing the Vernon ENS. Request that the NRC staff member call back at 700-661-4323.
4) Results Date:

Successful call to the NRC: D YES D NO NRC

Contact:

Time:

Successful callback from the NRC: D YES E NO NRC

Contact:

Time:

5) If not completely successful in Step 4), notify the Control Room immediately.
b. Other NRC FTS Phones
1) The remaining FTS phones in Vernon are tested by calling each FTS phone from a different FTS phone. The following FTS phones should be tested for operability:

Wall mounted in Communications Room

  1. 40 70D-661-4319
  1. 42 700-661-4321
2) Telephones are in the TSC cabinets. Find the phone labeled #39 and plug it into the outlet labeled #39 in the small office behind the communications room. Call that line from one of the wall mounted FTS phones to verify operability.
3) Take two telephones from the TSC cabinets and test the four circuits in the NRC Office by calling each line. The outlets are on the far wall to the right as you walk in the door (OP 3504, Figure 4). They are labeled #43, #44, #45, and #47.
2. Test performed by: -

(Print/Sign) Date Approved BV /

EPC (Print/Sign) Date VYOPF 3506.08 OP 3506 Rev. 43 Page 3 of 3

EOF EMERGENCY PLAN IMPLEMENTING PROCEDURES AND STATUS FORMS BOOK UPDATE Change #

Initials A. Emergency Equipment Cabinet #1 for use by the Site Recovery Manager

1. Update Emergency Plan Implementing Procedures Book per the Procedure Change Memo
2. Update ERF Directory (OP 3504, Emergency Communications)
3. Update status forms book for any changes to the following:
a. AP 3125, Emergency Plan Classification and Action Level Scheme (4 large copies of appendices for Sprinkler Room)
b. OP 3511, Off-Site Protective Action Recommendations
c. VYOPF 3511.01, Protective Action Recommendation Worksheet
d. VYOPF 3546.02, Emergency Classification and PAR Notification Upgrade Form
e. VYOPF 3546.01, Plant Status Briefing Form
f. OP 3546, Appendices: A,B,C,E,F,I,J,K,M,N,O,P,Q B. Emergency Equipment Cabinet #2 for use by the EOF Coordinator I 1. Update Emergency Plan Implementing Procedures Book per the Procedure Change Memo
2. Update ERF Directory (OP 3504, Emergency Communications)
3. Update status forms book for any changes to the following:
a. VYOPF 3542.01, Personnel Accountability Log
b. VYOPF 3504.02, Plant Parameters
c. OP 3511, Off-Site Protective Action Recommendations
d. VYOPF 3511.01, Protective Action Recommendation Worksheet VYOPF 3506.09 OP 3506 Rev. 43 Page 1 of 2

EOF EMERGENCY PLAN IMPLEMENTING PROCEDURES AND STATUS FORMS BOOK UPDATE (Continued)

C. Emergency Equipment Cabinet #3 for use by the Radiological Supervisor I 1. Update Emergency Plan Implementing Procedures Book per the Procedure Change Memo

2. Update ERF Directory (OP 3504, Emergency Communications)
3. Update status forms books for any changes to the following:
a. OP 3513, Evaluation of Off-Site Radiological Conditions
b. OP 3510, Off-Site and Boundary Monitoring
c. OP 3511, Off-Site Protective Action Recommendations
d. VYOPF 3513.01, Dose Assessment Status
e. VYOPF 3513.02, Isotopic Analysis
f. VYOPF 3513.03, Field Data Status Log
g. VYOPF 3513.04, Dose at Selected Locations
h. VYOPF 3511.01, Protective Action Recommendation Worksheet
i. VYOPF 3507.01, Personnel Exposure Log
j. VYOPF 3507.03, Potassium Iodide Administration Record
k. VYOPF 3504.02, Plant Parameters
1. VYOPF 3542.01, Personnel Accountability Log
m. OP 3525, Radiological Coordination .

Discrepancies or Comments:

Performed ByI /

(Print/Sign) Date Reviewed By /

EPC (Print/Sign) Date VYOPF 3506.09 OP 3506 Rev. 43 Page 2 of 2

OSC DOCUMENTATION CHANGE TRACKING FORM Emergency Plan Implementing Procedure Change #

Plant Procedures Program Change #

OSC Status Forms Drawer Update Emergency Plan Implementing Procedures per the Procedure Change Memo for any changes to the following:

Initials A. Update Emergency Plan Implementing Procedures book(s) per the Procedures Change Memo.

B.

1. OP 3507, Emergency Radiation Exposure Control
2. VYOPF 3507.01, Personnel Exposure Log _
3. VYOPF 3507.02, Emergency Radiation Exposure Briefing/Debriefing
4. VYOPF 3507.03, Potassium Iodide Administration Record
5. OP 3544, Operation of the Operations Support Center
6. OP 3544, Appendix A - Alert - Radiological Habitability Assessment
7. VYOPF 3544.01, Emergency Conditions Radiological Assessment Form
8. VYOPF 3544.02, OSC Team Work Status Form Performed By /

(Print/Sign) Date Site Boundary Team Kit Update per Procedure Change Memo any change to the following: Initials

1. OP 3510, Off-Site and Site Boundary Monitoring (2 copies),

I Performed By /

(Print/Sign) Date VYOPF 3506.10 OP 3506 Rev. 43 Page 1 of 3

OSC Documentation Change Tracking Form (Continued)

Inner Gbtehouse Site Boundary Team Kit Update per Procedure Change Memo any change to the following: Initials

1. OP 3510, Off-Site and Site Boundary Monitoring (2 copies)

Performed By /

(Print/Sign) Date Off-Site Emergency Kits Update per Procedure Change Memo any change to the following: Initials

1. OP 3510, Off-Site and Site Boundary Monitoring
a. Blue Kit (3 copies)
b. Green Kit (3 copies)
c. Black Kit (3 copies)

Performed By /

(Print/Sign) Date OCS Dosimetry Kit (RP Checkpoint)

Updat e per Procedure Change Memo any change to the following: Initials

1. AP 0506, Personnel Monitoring
2. VYAPF 0506.07, Administration Radiation Exposure Control Change Request
3. VYAPF 0506.08, Multibadge TLD Location Form
4. AP 0525, Dosimetry Processing
5. VYAPF 0525.06, Pregnant Woman Declaration Form
6. VYAPF 0525.07, Reg. Guide 8.13 Log Sheet
7. VYAPF 0525.08, Visitor/Tour Member Log Sheet
8. VYAPF 0525.09, Lost, Damaged or Misused Dosimetry Report
9. VYAPF 0525.11, RWP Sign In Sheet VYOPF 3506.10 OP 3506 Rev. 43 Page 2 of 3

OSC Documentation Change Tracking Form (Continued)

10. AP 0546, Plahned Special Exposure
11. OP 3507, Emergency Radiation Exposure Control
12. VYOPF 3507.01, Personnel Exposure Log Performed By /

(Print/Sign) Date Discrepancies or Comments:

Must be returned to EPC within 10 days of Issue date.

Reviewed By /

EPC (Print/Sign) Date VYOPF 3506.10 OP 3506 Rev. 43 Page 3 of 3

CONTROL ROOM EMERGENCY PLAN IMPLEMENTING PROCEDURES AND STATUS FORMS BOOK UPDATE Change #

Initials A. Update Emergency Plan Implementing Procedures per the Procedure Change Memo B. Update status forms drawer for any changes to the following:

1. OP 3540, Control Room Actions During an Emergency
2. VYOPF 3504.02, Plant Parameters
3. VYOPF 3540.06, Emergency Classification.and PAR Notification Form
4. VYOPF 3508.01, Medical Emergency Medical Status Record Sheet
5. VYOPF 3511.01, Protective Action Recommendation Worksheet
6. VYOPF 3513.01, Dose Assessment Status Form Discrepancies or Comments:

Performed By /

(Print/Sign) Date Must be returned to EPC within 10 days of Issue I Idate.

Reviewed By /

EPC (Print/Sign) Date VYOPF 3506.11 OP 3506 Rev. 43 Page 1 of 1

TSC EMERGENCY PLAN IMPLEMENTING PROCEDURES AND IMPLEMENTING FORMS BOOK UPDATE Change _

l A. Update Emergency Plan Implementing Procedures Book(s) per the Procedure C2hange Memo B. Update status forms book for any changes to the following:

1. OP 3542, Operation of the Technical Support Center
2. VYOPF 3542.01, Personnel Accountability Log
3. VYOPF 3524.02, Initial Site Accountability Check In Form
4. VYOPF 3504.02, Plant Parameters
5. VYOPF 3540.06, Emergency Classification and PAR Notification Form C. Update five (5) clipboards for any changes to the following:
1. VYOPF 3542.01 Personnel Accountability Log.

D. Update (1) clipboard for any changes to the following:

1. VYOPF 3524.02, Initial Site Accountability Check In Form E. Update TSC personnel Sign-In Forms Book
1. VYOPF 3524.02, Initial Site Accountability Check In Form
2. VYOPF 3542.01, Personnel Accountability Log Discrepancies or Comments:

Performed By /

(Print/Sign) Date I Must be returned to EPC within 10 days of Issue date.

Reviewed By /

EPC (Print/Sign) Date VYOPF 3506.12 OP 3506 Rev. 43 Page 1 of 1

EMERGENCY RESPONSE TELEPHONE NUMBER CHECK A. Verify that telephone numbers listed in OP 3504, Appendix B, are accurate. (This verification covers telephone numbers listed in OP 3508, OP 3540, and OP 3542.)

Discrepancies:

B. Verify that telephone numbers listed in AP 0156 are accurate.

Discrepancies:

C. Verify telephone numbers in the Emergency Response Telephone Directory under tabs: Control Room, OSC, TSC, EOF/RC, Incoming and Outgoing Fax are accurate.

Discrepancies:

D. Verify telephone numbers in OP 3546, Table 2 are accurate.

Discrepancies:

E. Place the latest VY phone list in the Emergency Response Telephone Directory.

Performed BIVJ. I EP Staff Member (Print/Sign) Date Reviewed By l EPC (Print/Sign) Date VYOPF 3506.13 OP 3506 Rev. 43 Page 1 of 1