Correction to Technical Specification Page
ML062160066
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/27/2006
From: Ted Sullivan
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 06-067, TAC MC5243
Download: ML062160066 (4)


Text

Entergy Nuclear Operations, Inc.

Vermont Yankee P.O. Box 0500 Enter y 185 Old Ferry Road Brattleboro, VT 05302-0500 Tel 802 257 5271 July 27, 2006 BVY 06-067 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)

Correction to Technical Specification Page

References:

(1) Letter, VYNPS to USNRC, Technical Specification Proposed Change No. 270, "Administrative Changes," BVY 04-118, dated December 6, 2004.

(2) Letter, USNRC to VYNPS, "Issuance of Amendment Re:

Administrative Changes (TAC No. MC5243)," NVY 05-099, dated August 15, 2005.

As part of our request for change (Reference 1) a text line was inadvertently omitted from an unrelated paragraph (6.1.C) on Technical Specification (TS) page 255. License Amendment No. 226 (Reference 2) approved our request. The attached pages provide a marked-up version of TS page 255 showing the text line that was omitted and a new page restoring that wording.

We regret any inconvenience this has caused and request that you re-issue TS page 255 for License Amendment 226.

There are no new commitments being made in this submittal.

If you have any questions or require additional information, please contact me at (802) 258-4236.

Sincerely, Site Vice President Vermont Yankee Nuclear Power Station cc list (next page)

BVY 06-067 Page 2 of 2 cc: Mr. James J. Shea, Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Mail Stop 0 8 C2A Washington, DC 20555 Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601

VYNPS 6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY A. The plant manager shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during absences.

B. The plant manager or designee shall approve, prior to implementation, each proposed test, experiment, or modification to systems or equipment that affect nuclear safety.

C. The shift supervisor shall be responsible for the control room command function. During any absence of the shift supervisor from the control room while the unit is in plant startup or normal

  • operation, an individual with an active Senior Reactor Operator (SPRO* icense shall be designated to assume the control room command cno function. During any absence of the shift supervisor from the -

control room while the unit is in col snutaown or retueln with i~~ W0J5 fuel in the reactor, an individual with an active SRO license or Reactor Operator license shall be designated to assume the control room command function.

6.2 ORGANIZATION A. Onsite and Offsite Organizations Organizations shall be established for unit operation and corporate management. These organizations shall include the positions for activities affecting safety of the nuclear power plant.

1. Lines of authority, responsibility, and communication shall be established and.defined for the highest management levels through intermediate levels to and including all operating organizational positions. These relationships shall be documented and updated, as appropriate, in the form of organizational charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documentei e j Ar mont Y ee Ope Iona Quality Assurance Manual. The ' j plant-specific titles ot those personnel fulfilling the ---.

responsibilities of the positions delineated in these Technical Specifications shall be documented in the Technical Requirements Manual.

2. The plant manager shall be responsible for overall unit safe operation and shall have control over those on-site activities necessary for safe operation and maintenance of the plant.
3. The site vice president shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.

Amendment No. "6, :7-5,4-1, 4*-l, 24-25 255

VYNPS 6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY A. The plant manager shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during absences.

B. The plant manager or designee shall approve, prior to implementation, each proposed test, experiment, or modification to systems or equipment that affect nuclear safety.

C. The shift supervisor shall be responsible for the control room command function. During any absence of the shift supervisor from the control room while the unit is in plant startup or normal operation, an individual with an active Senior Reactor Operator (SRO) license shall be designated to assume the control room command function. During any absence of the shift supervisor from the control room while the unit is in cold shutdown or refueling with fuel in the reactor, an individual with an active SRO license or Reactor Operator license shall be designated to assume the control room command function.

6.2 ORGANIZATION A. Onsite and Offsite Organizations Organizations shall be established for unit operation and corporate management. These organizations shall include the positions for activities affecting safety of the nuclear power plant.

1. Lines of authority, responsibility, and communication shall be established and defined for the highest management levels through intermediate levels to and including all operating organizational positions. These relationships shall be documented and updated, as appropriate, in the form of organizational charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Quality Assurance Program Manual. The plant-specific titles of those personnel fulfilling the responsibilities of the positions delineated in these Technical Specifications shall be documented in the Technical Requirements Manual.
2. The plant manager shall be responsible for overall unit safe operation and shall have control over those on-site activities necessary for safe operation and maintenance of the plant.
3. The site vice president shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.

Amendment No. ", 4*---, 44-l, 244, 226 255