ML20043A833
Person / Time
Site: Haddam Neck, Millstone  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/15/1990
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B13527, NUDOCS 9005230174
Download: ML20043A833 (2)


Text

rw -

7-... -

n n

~'

,MhEAR s

4

4 -

1 j

n... :iQ Mv

~

h "O

U.CI2c7ETYc5~

P.O. BOX 270

.aven w p nw=cov*"'-

H ARTFORD. CONNECTICUT 06141-0270 k

C ]

  1. E.E,CEI7vco,7,

' (203) 665-5000

+

.g c.

y-May'15,fl990-t 0.ocket-Nos. 50-245 50-336-50-473

+

50-213 B13527

+

1 U-S.: Nuclear Regulatory Commission.

'e Attention:

Document Control Desk

' Washington, DC 20555

. Gentlemen:'

Haddam Neck Plant i

Millstone Nuclear Power Station, Unit Nos.1, 2, and 3 Nuclear Trainina Manual Vodates Gentlemen:

As i per. our
commitment to provide periodic updates to the plant : specific NuclearcTraining Manuals to the NRC Project Managers of-Millstone Unit Nos, l',

2', and!3 and the Haddam Neck Plant, Connecticut Yankee-' Atomic Power Company (CYAPCO) and Northeast-Nuclear Energy Company (NNECO) are providing the 74 following enclosures.

Enclosure No.

Enclosure Title

-Recioient 1

Millstone Unit No. 1 M. L. Boyle, NRC

-Training Manual Update Project Manager, MP1 Package:

2-Millstone Unit No. 2 G. S. Vissing, NRC Training _ Manual Update Project Manager,-MP2 Package 3

Millstone Unit No. 3 D. H. Jaffe, NRC L

Training. Manual Update Project Manager, MP3' Package a

4 Haddam Neck-Plant A. B. Wang, NRC Training ~ Manual Update Project Manager, CY Package A

PMM mum

~

aqjam i

PDC 7-pj. g/- pg g o m -.

p.

w:

l>

,i i,

p

  • , + 3 n.1 e

U.'S, Nuclear Regulatory Commission

.B13527/Page 2 May 15, 1990 Recall that these. manuals are used to augment classroom, simulator, and on-the-job instruction provided by the Nuclear Training Department in the various operator training programs.

Other controlled plant documents and training materials 'are also used as required to cover the total scope of each program.

While a careful effort has been ' directed toward the content accuracy of the manuals and these updates, it should be recognized that these manuals are nat considered QA or design documents.

Also, their update frequencies are based on training delivery needs and other training priorities.. Ther efore, the training inanuals should not be used for researching or evaluating specific design criteria and operating requirements.

We hope the information contained in the manuals and these updates continues to be helpful to the staff.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY NORTHEAST NUCLEAR ENERGY COMPANY FOR: E. J. Mroczka Senior Vice President a

O BY:.

W. D. Romberg O'

Vice President cc: T. T. Martin, Region I Administrator A. B. Wang, NRC Project Manager, Haddam Neck Plant J. T. Shedlosky, Senior Resident Inspector, Haddam Neck Plant M. L. Boyle, NRC Project Manager, Millstone Unit No. 1 G. S. Vissing, NRC Project Manager, Millstone Unit No. 2-D. H. Jaffe, NRC Project Manager, Millstone Unit No. 3

~

W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3

- -