B12449, Part 21 Rept Re Noryl Plastic Insulation Deterioration on Bus Bars in Certain Metaclad Switchgear at Facility. Switchgears Used in safety-related Circuits Will Be Inspected & Repaired During Refueling Outage in Nov 1987

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Noryl Plastic Insulation Deterioration on Bus Bars in Certain Metaclad Switchgear at Facility. Switchgears Used in safety-related Circuits Will Be Inspected & Repaired During Refueling Outage in Nov 1987
ML20207R583
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/04/1987
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-87, REF-PT21-87-072-000 B12449, PT21-87-072-000, PT21-87-72, NUDOCS 8703170403
Download: ML20207R583 (1)


Text

g General Officas

en*s avr=* *" P.O. box 270 HARTFORD. CONNECTICUT 06141-0270 L L J [,[, [ [,2,"w ~. (203) 665-5000 March 4,1987 Docket No. 50-423 B12449 Re: 10 CFR 21 U. S. Nuclear Regulatory Commission Atto: Document Control Desk Washington, D. C. 20555

Reference:

(1) 3. F. Opeka letter to Dr. T. E. Murley, Millstone Unit No. 2, Report of Substantial Safety Hazard, dated November 19, 1986.

Gentlemen:

Millstone Nuclear Power Station, Unit No. 3 Inspection of Noryl Plastic Insulation in 4KV & 6.9 KV Meta! clad Switchgear In conformance with applicable requirements of 10CFR21, Northeast Nuclear Energy Company (NNECO) provided a report of a Substantial Safety Hazard concerning Noryl plastic insulation deterioration on bus bars in certain metalclad switchgear at Millstone Unit No. 2 (Reference 1). It was also indicated that similar switchgear is installed at Millstone Unit No. 3 and that NNECO intends to inspect such switchgear used in safety related circuits and make any necessary repairs in the next maintenance outage for Millstone Unit No. 3. The Millstone Unit No. 3 switchgear has been energized for a short period of time (approximately 3-4 years) and all the insulation was dry-wiped before being energized. The upcoming March 1987 outage is of insufficient duration to complete the inspection in light of the workscope already planned. We anticipate accomplishing this task during the first refueling outage currently scheduled to begin in November,1987.

If there are any questions, please contact our licensing representative directly.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY s M/

E. 3. ()

Senio$tfoczka r Vice President cc: Dr. Thomas E. Murley, Region I -

3. T. Shediosky, Sr. Resident Inspector, Millstone Unit No. 3 E. L. Doolittle, NRC Project Manager - Millstone Unit No. 3 [