F-1 Docket No. 50-336 B17824 Millstone Nuclear Power Station, Unit No. 2 Facility Operating License No. DPR-65 Monthly Operating Report i
Revised Operating Data Report for May 1999 l
9907210122 990713 July 1999 PDR ADOCK 05000336 R
a U.S. Nuclear Regul: tory Commission B17824\\ Attachment 1\\Page 2 OPERATING DATA REPORT UNIT NAME: Millstone Unit 2 DATE: 07/01/99 COMPLETED BY:
S. Stark TELEPHONE: (860)447-1791 EXT: 4419 OPERATING STATUS
- 1. Docket Number 50-336
- 2. Reporting Period June 1999 Notes: Items 22 and 23
- 3. Utility Contact S. Stark cumulative are weighted 4.
Licensed Thermal Power (MWt):
2700 averages. Unit operated at
- 5. Nameplate Rating (Gross MWe):
909 2560 MWTH prior to its
- 6. Design Electrical Rating (Net MWe):
870 uprating to its current
- 7. Maximum Dependable Capacity (Gross MWe):
901.63 2700 MWTH power level.
- 8. Maximum Dependable Capacity (Net MWe):
870.63
- 9. If Changes Occur in Capacity Ratings (items Number 4 Through 8) Since Last Report, Give Reasons: N/A
- 10. Power Level To Which Restricted, if any (Net MWe): N/A
- 11. Reasons For Restrictions, if Any: N/A This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 720.0 4343.0 206111.0
- 13. Number Of Hours Reactor Was Critical 720.0 1159.7 123071.4
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
- 15. Hours Generator On-Line 720.0 1063.1 117675.0
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 17. Gross Thermal Energy Generated (MWH) 1942497.0 2648041.5 303510547.9
- 18. Gross Electrical Energy Generated (MWH) 648561.0 869347.5 99578807.5
- 19. Net Electrical Energy Generated (MWH) 629262.0 812083.9 95409781.6 j
- 20. Unit Service Factor 100.0 24.5 57.1
- 21. Unit Availability Factor 100.0 24.5 57.3
- 22. Unit Capacity Factor (Using MDC Net) 100.4 21.5 54.0
- 23. Unit Capacity Factor (Using DER Net) 100.5 21.5 53.3
- 24. Unit Forced Outage Rate 0.0 75.5 29.3
- 23. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: N/A
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
U.S. Nuclerr Regulatory Commission e
B17824\\ Attachment 2\\Page 1 OPERATING DATA REPORT UNIT NAME: Millstone Unit 2 DATE: 07/01/99 COMPLETED BY:
S. Stark TELEPHONE: (860) 447-1791 EXT: 4419 OPERATING STATUS
- 1. Docket Number 50-336
- 2. Reporting Period May 1999 (Revised *)
Notes: ltems 22 and 23
- 3. Utility Contact S. Stark cumulative are weighted 4.
Licensed Thermal Power (MWt):
2700 averages. Unit operated at
- 5. Nameplate Rating (Gross MWe):
909 2560 MWl'H prior to its
- 6. Design Electrical Rating (Net MWe):
870 uprating to its current
- 7. Maximum Dependable Capacity (Gross MWe):
901.63 2700 MWTH power level.
- 8. Maximum Dependable Capacity (Net MWe):
870.63
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, j
Give Reasons: N/A
- 10. Power Level To Which Restricted, if any (Net MWe): N/A
- 11. Reasons For Restrictions, if Any: N/A This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 744.0 3623.0 205391.0
- 13. Number Of Hours Reactor Was Critica!
439.7 439.7 122351.4
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
- 15. Hours Generator On-Line 343.1 343.1 116955.0
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 17. Gross Thermal Energy Generated (MWH) 705544.5
- 705544.5
- 301568050.9 *
- 18. Gross Electrical Energy Generated (MWH) 220786.5 220786.5 98930246.5
- 19. Net Electrical Energy Generated (MWH) 202409.5 182821.9 94780519.6
- 20. Unit Service Factor 46.1 9.5 56.9
- 21. Unit Availability Factor 46.1 9.5 57.2
- 22. Unit Capacity Factor (Using MDC Net) 31.2 5.8 53.8
- 23. Unit Capacity Factor (Using DER Net) 31.3 5.8 53.2
- 24. Unit Forced Outage Rate 53.9 90.5 29.4
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 26. If Unit Shutdown At End Of Report Period Estimated Date of Startup: N/A
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICRY N/A N/A COMMERCIAL OPERATION N/A N/A
!