ML20211A675
| ML20211A675 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/30/1999 |
| From: | Stark S NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20211A652 | List: |
| References | |
| NUDOCS 9908240100 | |
| Download: ML20211A675 (3) | |
Text
r-
-3, Docket No. 50-336 B17854 Millstone Nuclear Power Station, Unit No. 2 Facility Operating License No. DPR-65 Monthly Operating Report Revised Average Daily Unit Power Level for June 1999 Revised Operating Data Report for June 1999 1
i l
August 1999 9908240100 990014 PDR ADOCK 05000336 PDR R
l L:
E j.
l U.S. Nuclear Regulatory Comrmssion B17854%ttachment 3/Pa081 l
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-336 UNIT:
Millstone Unit 2 DATE:
08/03/99 COMPLETED BY:
S. Stark
)
TELEFHONE:
(860)447 1791 EXT:
4419 MONTH: June 1999 (Revised *)
DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 871
- 17 868 2
872
- 18 867 I
3 871
- 19 870 4
869
- 20 870 5
871*
21 869 6
871
- 22 870 7
871
- 23 870 8
871
- 24 869 9
870
- 25 869 10 870
- 26 870 11 871
- 27 870
.12 871
- 28 869 13 871
- 29 869 14 871
- 30 870 15 871
- 31 16 870
- 4 i
INSTRUCTIONS
' On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l L
fiJ l *;
.S. Necisar Regulatory Commission l
U 317854Wttachment 3/Page 2 I
OPERATING DATA REPORT UNIT NAME: Millstone Unit 2 DATE 08/03/99 COMPLETED BY:
S. Stark TELEPHONE: (860) 447-1791 EXT: 4419 OPERATING STATUS l
l~
- 1. Docket Number 50-336
- 2. Reporting Period June 1999 (Revised *)
Notes: Items 22 and 23
- 3. Utility Contact S. Stark cumulative are weighted
- 4. Licensed Thermal Power (MWt):
2700 averages. Unit operated at
- 5. N:meplate Rating (Gross MWe):
909 2560 MWTH prior to its j-.
- 6.. Design Electrical Rating (Not MWe):
870 uprating to its current l
- 7. - Maximum Dependable Capacity (Gross MWe):
901.63 2700 MWTH power level.
- 8. Maimum Dependable Capacity (Not MWe):
870.63 1
9.' If Changes Occur in Capacity Ratings (items Number 4 Through 8) Since Last Report,
. Give Reasons: N/A
- 10. Power Level To Which Restricted, if any (Not MWe): N/A 11, Reasons For Restrictions, if Any: N/A I
l This Month Yr.-To-Date Cumulative l
[
12.- Hours in Reporting Period 720.0 4343.0 206111.0
- 13. Number Of Hours Reactor Was Critical 720.0.
1159.7 123071.4
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
- 15. Hours Generator On-Line 720.0 1063.1 117675.0
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 17. Gross Thermal Energy Generated (MWH) 1942497.0 2648041.5 303510547.9
- 18. Gross Electrical Energy Generated (MWH) 648561.0 869347.5 99578807.5
- 19. Not Electrical Energy Generated (MWH) 626463
- 807031.5
- 95404729.2
- l'
- 20. Unit Service Factor
'100.0 24.5 57.1 l
- 21. Unit Availability Factor 100.0 24.5 57.3 l-
- 22. Unit Capacity Factor (Using MDC Net) 99.9
- 21.3
- 53.9
- l
- 23. Unit Capacity Factor (Using DER Net) 100.0
- 21.4
- 53.3
- l'
- 24. Unit Forced Outage Rate 0.0 75.5 29.3 I
l
- 25. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each): N/A l
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: N/A 27, Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i
f l
L..