Final Part 21 & Deficiency Rept SD-25 Re Failure of Pinion Gear Shear Keys in Limitorque Model SBO Motor Operated Valves.Initially Reported on 820903.Westinghouse Determined Item Not Reportable Per 10CFR50.55(e)
ML20198F742
Person / Time
Site: Millstone 
Issue date: 11/01/1985
From: Opeka J, Sears C
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-PT21-85-494-000 F0887A, F887A, PT21-85-494, PT21-85-494-000, SD-25, NUDOCS 8511140419
Download: ML20198F742 (2)


Text

st MEAST UTILITIES General Offices

EvC$ Nits $ cc P.O. BOX 270

.wm

  • ta ama cc~**=,

HARTFORD. CONNECTICUT 06141-0270 L

t J C "l,CllL'7,'c =

(203) ses-sooo November 1,1935 Docket No. 50-423

  1. 0387A Dr. Thomas E. Murley Regional Administrator Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

References:

(1)

W.

G. Counsil letter to R. C.

Haynes, B10553, dated September 3,1932.

(2)

W. G. Counsil letter to R. C. Haynes, B10553, dated October 6,1982.

(3)

W.

G.

Counsil letter to R C.

Haynes, B 10553, dated November 24,1932.

(4)

W. G. Counsit letter to T. E. Murley, B10309, dated June 10, 1933.

Dear Dr. Murley; Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies in Accordance with 10CFR50.55(e): Failure of Pinion Gear Shear Keys in Limitorque Model SBO (SD-25)

In Reference (1), Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency concerning failure of pinion gear shear keys in Limitorque Model SBO motor operated valves as required by 10CFR50.55(e).

References (2) and (3) provided interim reports on our progress toward resolving the deficiency.

The purpose of this letter is to amend our closure letter (Reference (4)) for this potential significant deficiency.

The Electro-Mechanical Division (EMD) of Westinghouse subsequently reviewed the shop order records for Millstone Unit No. 3 and determined that none of the EMD manufactured valves supplied to NNECO used the SB-O series Limitorque Actuator, the type discussed in Reference 4. Hence,it has been determined that this is not a significant deficiency for Millstone Unit No. 3.

8511140419 851101 PDR ADOCK 05000423 lO 16 2 f

a p As such, we consider this amendment to Reference (4) to be our final report for SD-25.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

b.. bF J. F. Opeka Senior Vice President By: C. F. Sears Vice President cc:

Mr. J. M. Taylor, Director Division of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

.