MONTHYEARML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML17292B5331999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE ML17292B5341999-01-15015 January 1999 Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error B17414, Part 21 Rept Re 980116 Failure of Tachometer Transducer,Id Number TG-25-5,during Surveillance Test.Caused by Bearing Failure Which Could Cause Shaft to Seize & Break.Removed from Svc & Replaced Failed Tachometer Transducer1998-09-0303 September 1998 Part 21 Rept Re 980116 Failure of Tachometer Transducer,Id Number TG-25-5,during Surveillance Test.Caused by Bearing Failure Which Could Cause Shaft to Seize & Break.Removed from Svc & Replaced Failed Tachometer Transducer ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20236Y1231998-08-0707 August 1998 Part 21 Rept Re Gas & Turbine Generator for Dedicated Emergency Power to Vital AC Buses ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247B6751998-05-0101 May 1998 Part 21 Rept Re Evaluation & Notification for RELAP4 Excessive Variability at Millstone Unit 2.Caused by Small Changes in Input to RELAP4 That Can Result in Large Changes in Calculated Peak Cladding Temp.Informed NRC of Deviation ML20198E0631998-01-0707 January 1998 Part 21 Rept Re Shipment by Dubose National Energy Svcs,Inc, of 40 Pieces of 4 inch,90 Degree Elbows Which Did Not Meet ASME Section II SA-234 Requirements ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H7911997-09-30030 September 1997 Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected ML20217K5991997-08-11011 August 1997 Part 21 Interim Rept Re Fafnir S7K Bearing Discrepancies. Further Evaluation of Deviation Is Required & Will Be Completed by 971111 B16531, Part 21 Rept Re GE Commercial Grade Dedication Program Being Determined to Be Inadequate in Ability to Demonstrate Seismic Capability of Specific Relay.Returned Relays to GE Facility for Repair1997-07-0303 July 1997 Part 21 Rept Re GE Commercial Grade Dedication Program Being Determined to Be Inadequate in Ability to Demonstrate Seismic Capability of Specific Relay.Returned Relays to GE Facility for Repair ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20140D6581997-06-0606 June 1997 Part 21 Rept Re GE Model Ifcs Relays Procured from GE Delivered W/Loose Hardware & Unsuitable for Use at Unit 1 ML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A B16149, Part 21 Rept Re Cracked Fuse Ferrule Defects Due to Administrative Error in Ltr Detailing Commitments Re Issue. Corrected Copy of Commitments Associated W/Ltr Provided1997-01-14014 January 1997 Part 21 Rept Re Cracked Fuse Ferrule Defects Due to Administrative Error in Ltr Detailing Commitments Re Issue. Corrected Copy of Commitments Associated W/Ltr Provided B16030, Part 21 Rept Re Stocked safety-related Fuses Issued from Storeroom for Installation Which Had Cracked Ferrules in Longitudinal Direction on 960911.Procurement & Warehouse Groups Completed Inspecting Fuses in Warehouse1996-12-13013 December 1996 Part 21 Rept Re Stocked safety-related Fuses Issued from Storeroom for Installation Which Had Cracked Ferrules in Longitudinal Direction on 960911.Procurement & Warehouse Groups Completed Inspecting Fuses in Warehouse ML20134N4061996-11-22022 November 1996 Part 21 Rept Re Fifteen Different Fuse Types from Three Different Mfgs Found to Have Axial Cracks Due to Brass Being Susceptible to Defect.Functional Testing Should Be Performed on Sample of Fuses ML18065B0111996-10-18018 October 1996 Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20115D2001996-07-0909 July 1996 Part 21 Rept Re Mfg Defect of Enterprise DSR-4 & DSRV-4 Edgs,Originally Mfg by Calcon Corp.Amot Control Corp Purchased Calcon Product Line & Maintains Design & Production.Valves Returned to Cooper Energy Svcs on 960131 ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML17292A2141996-05-0808 May 1996 Part 21 Rept Re Capscrews Supplied to Wppss by Now Defunct Cardinal Industrial Products,Lp (CIP) Having Nonconforming Hardness.Failed Lots & Any Remaining Product Found to Have Been Heat Treated by CIP Scrapped & Removed from Premises LD-96-014, Part 21 Rept Re Response to NRC Notice on Nonconformance. Licensee Will Direct Cognizant Personnel Reviewing Deviation or Failure to Comply for Basic Components Delivered to Customers,To Document Whether/Not Facts Indicate Evaluation1996-04-26026 April 1996 Part 21 Rept Re Response to NRC Notice on Nonconformance. Licensee Will Direct Cognizant Personnel Reviewing Deviation or Failure to Comply for Basic Components Delivered to Customers,To Document Whether/Not Facts Indicate Evaluation ML20100L7411996-02-29029 February 1996 Final Part 21 Rept Re Fan Motor Bearing Indications,Updating Status of Evaluation of Deviation.Bearings for Unit 2 Fcus Inspected & No Linear Indications Noted.Unit 1 Fcu Bearings Will Be Inspected Prior to Upcoming Refueling Outage ML20097A5641996-01-31031 January 1996 Final Part 21 Rept Re Ball Valves Supplied by Cardinal Industrial Products Containing Suspect Pressure Boundary Bolting.Valves Containing Suspect Bolts Returned to Canadian Worcester Controls Ltd to Have Bolting Replaced TXX-9603, Interim Part 21 Rept Re Linear Indication on Fan Motor Bearings Mfg by Fafnir.Bearings Provided as Spares for Four UPS Room Fan Coil Units.Further Evaluation Required & Evaluation Will Be Completed by 9602291996-01-29029 January 1996 Interim Part 21 Rept Re Linear Indication on Fan Motor Bearings Mfg by Fafnir.Bearings Provided as Spares for Four UPS Room Fan Coil Units.Further Evaluation Required & Evaluation Will Be Completed by 960229 ML20094M6251995-11-21021 November 1995 Final Part 21 Rept of Investigation & Analysis of Suspect Fasteners Event 29257.B&G-Cardinal Discontinued Using Heat Treatment Equipment at Cardinal Facility Until Such Time That Satisfactory Mods Made to Hardware & Procedures ML20092H3641995-09-13013 September 1995 Part 21 Rept Re 3/4 Inch ASME Section III Class 2 Ball Valves Supplied by Canadian Worcester Controls Ltd (Cwcl) ML17291A2571994-07-22022 July 1994 Part 21 Rept Re Westinghouse Containment Penetration Modules Scotchcast Strain Relief & Varglas Insulated Conductors. Replaced Six of 12 RPIS Scotchcast/Varglas Modules & Three Scotchcast/Okonite Modules During Refueling Outage (R-9) ML17291A2351994-07-15015 July 1994 Deficiency Rept Re Material Defects in Facility Containment Penetration Modules.Initially Reported on 940715.Modules Were Replaced ML17290B2001994-05-26026 May 1994 Part 21 Rept Re Automatic Switch Co Replacement Solenoid Pilot Valve Diaphragms Supplied by GE Nuclear Energy.Unusual Combination of Scram Soleniod Pilot Valve Pressure & Exhaust Diaphragm Degradation Caused Failure of Rod to Scram ML20064G3261994-03-0707 March 1994 Part 21 Rept Re RTP Universal I/O Controller Interface Card Utilized in Universal I/O Controller Supplied for Installation at Comanche Peak.Design Corrected Through Engineering Change Order Adding Two Filter Capacitors ML20064G3391994-03-0707 March 1994 Part 21 Rept Re RTP Universal I/O Controller Interface Card Utilized in Universal I/O Controller,Supplied for Installation at Comanche Peak & Yonggwang Nuclear Power Plant,Units 3 & 4.Two Filter Capacitors Added to Design ML20064G3441994-03-0707 March 1994 Part 21 Rept Re RTP Universal I/O Controller Interface Card Utilized in Universal I/O Controller Supplied for Installation at Comanche Peak.Design Corrected Through Engineering Change Order Adding Two Filter Capacitors ML20063K6791994-02-16016 February 1994 Part 21 Rept Re Failed Bolting on Pacific Air Products Co Gravity Dampers.Failed Bolts Replaced W/Higher Strength Bolts ML20059H7721994-01-17017 January 1994 Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 ML20059F2631994-01-0707 January 1994 Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head B14680, Part 21 Rept Re Substantial Safety Hazard Evaluation of RCP Turning Vane Cap Screws.Util Increased head-to Shank Fillet Radius to Reduce Stress Concentration & Reduced Thread Engagement to Reduce Axial & Bending Stiffness1993-11-22022 November 1993 Part 21 Rept Re Substantial Safety Hazard Evaluation of RCP Turning Vane Cap Screws.Util Increased head-to Shank Fillet Radius to Reduce Stress Concentration & Reduced Thread Engagement to Reduce Axial & Bending Stiffness ML20058G5981993-11-17017 November 1993 Part 21 Rept Re Westronics Recorders,Model 2100C.Signal Input Transition Printed Circuit Board Assembly Redesigned to Improve Recorder Immunity to Electromagnetic Interference.List of Affected Recorders & Locations Encl ML20059A7181993-10-19019 October 1993 Part 21 Rept Re Defective Rocker Arms Supplied to TU & Clei. Rocker Arms Machined & Inspected to Incorrect Print & Discovered at Tu.Defective Rocker Arms Recalled from Nuclear Customers.No Corrective Action Required at Respective Utils ML20057G1511993-10-0707 October 1993 Part 21 Rept Re Westronics Model 2100C Series Recorders. Informs That Over Several Tests,Observed That Recorder Would Reset During Peak Acceleration & Door Being Forced Off Recorder.Small Retaining Clips Added to Bottom of Door ML20024H8341993-08-19019 August 1993 Part 21 Rept Re Potential Problem W/Installation of Bushing in gear-type,3 Gpm,Oil Pump Used in Refrigerant Compressors, Mfg by Dunham-Bush.CVI Will Call for Hold Point in Fabrication Process Where Bushing Installed B14544, Update to 900827 Rept of Substantial Safety Hazard Re GE Custom 8000 Horizontal Induction Motors,Reported Per 10CFR21 for Unit 3.Util Has Determined,As Part of Review of in 91-007 That Subj GE Motors Also Used at Units 1 & 21993-08-11011 August 1993 Update to 900827 Rept of Substantial Safety Hazard Re GE Custom 8000 Horizontal Induction Motors,Reported Per 10CFR21 for Unit 3.Util Has Determined,As Part of Review of in 91-007 That Subj GE Motors Also Used at Units 1 & 2 ML20044G5311993-05-26026 May 1993 Suppl to 921207 Part 21 Rept Re Declutch Sys Anomaly in Certain Types of Valve Actuators Supplied by Limitorque Corp.Limitorque Designed New Declutch Lever Which Will Be Available in First Quarter 1993 ML20044G5011993-05-26026 May 1993 Part 21 Rept Re Buffer Amplifier Modules Mfg by Bailey Controls Co Containing Suspect Negative Ref Power Supply Having Safety Implications.Caused by Design Error in Circuitry.Modules Would Not Result in Miscalibration 1999-04-12
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17284A9001999-10-31031 October 1999 Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR ML20217P5391999-10-25025 October 1999 Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217C8721999-10-0606 October 1999 Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With1999-10-0101 October 1999 LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With ML17284A8941999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J4341999-09-24024 September 1999 Mnps Unit 3 ISI Summary Rept,Cycle 6 ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr ML20211N8401999-09-0202 September 1999 Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 ML17284A8801999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211G9631999-08-30030 August 1999 SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210J0311999-07-21021 July 1999 Rev 20,Change 10 to QAP 1.0, Organization ML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr ML20210E5931999-07-19019 July 1999 Revised Page 16 of 21,to App F of Northeast Util QA Program Plan ML20210A0411999-07-15015 July 1999 Rev 20,change 10 to Northeast Util QA Program Tr ML20210C5911999-07-15015 July 1999 Revised Rev 20,change 10 to Northeast Util QA Program TR, Replacing Summary of Changes ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start1999-07-12012 July 1999 Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20209D1881999-07-0101 July 1999 Rev 20,change 9 to Northeast Util QA Program Tr ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 ML20196A8451999-06-30030 June 1999 Post Shutdown Decommissioning Activities Rept B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20196J1821999-06-30030 June 1999 Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) Tr ML20196J2191999-06-30030 June 1999 SER Concluding That Licensee USI A-46 Implementation Program,In General,Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML20196K1791999-06-30030 June 1999 Addendum 6 to Millstone Unit 2 Annual Rept, ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 1999-09-30
[Table view] |
Text
-- . - - _-. .. - .- - - - - . -
- c. , dub,ose Nationcil Energy Services,Inc.
.r January 7,1998 Attn: NRC Operations Center Document Control Desk US Nuclear Regulatory Commission Washington,DC 20555
Subject:
10 CFR 21 Dear Sir; I am writing to pass along information provided to us by Tube Forg:ngs of Amenca (TFA), a qualified vendor of ours. TFA has informed us that material supplied to thern by USS/Kobe Steel was mixed at the mill.
DNES received 40 pieces of 4" 90" elbows and shipped them to our customers. The customers, order number *, and quantities are listed here.
i Washington Public Powa. 251756 20 Pieces 1 N E Nuclear 02017957 16 Pieces l TU Electric S02208826D2 3 Pieces SC Electric & Gas SR 700786 1 Piece i
Attached is a copy of the letter from TFA, and USS/Kobe Steel describing the problem in detail.
We have notified 6ne above customers so that they can evaluate the material which may j have been installed in their facility.
1 If you need any additional information please contact me at 1-910-590-2151.
Sincerely,
/8tw C'
f James N. Dailey i
QA Manager [/'h y ec: Carl Rogers Sales DNES Customers D00.ko!Oojj43 PDR: ll ll!lllll ]l rlllr .ll
...,e (910) 5%2151 = l-800-590-2150 = FAX (910) 5%3555 P.O. Box 499
'JAN. 5. I99Gl 32 $2tH TFA gg tube forgings _ .
OP AMEmeC A 4NC. ,
DECEMBER LL,1997 .
smoo N.w. rMONT . PORTL.AND, OREGON FT210
-u. . . .m . .
DUBOSE NATIONAL ENCROY PO BOX +99 CL!hTON, N.C.
28328 ATTN 1 LAMES D AILEY RE. POTENTIAL 10 CPR PART 21 DEAR MR. DAILEY AS A FOLLOW UP TO THE TFA AND US STEEL LETTERYOU RECEIVED AND BASED ON A REVIEW OF ORDERS OF MATERIAL SUPPLIED TO YOU, RE : YOUR PURCHASE ORDER #
11301-63,WE ARE ADVIS!NG YOU OF A POTENTIAL PFOBLEM WITH 4 S7D LR 90,40PCS, TFA HEAT CODE 0348.
A PARENT HEAT WAS FOUND AT TFA. DURINO SAMPLINO INSPEC770N, TO CONTAIN .18 MOLEDDENUM AND .76 CHROME.DUE TO THE ALLOYING ELEMENTS THE YTELD, TENSILE AND ELONOATION AS WELL AS THE CHEMIST"" TES NOT MEET ASME SEC U SA 234 ORWPB. THE TTA HEAT CODE WHICH HAD THE rAOBLEM WAS 0347 WEICH YOU NEVER RECE!VED, HOWEVER AFTER EVALUA710N BY US STEEL IT WAS DETERMINED BY THEM
. THAT HT 0348 IS ALSO SUSPECT.
%TTHOUT USING THE PROPER WELD PROCEDURES THE CHROME / MOLY MATERIAL WIL HAVE A HIGH HARDNESS UP TO 34 RC IN THE HAZ.WHICH CONTAINS LWTEMPERED MARTENSITE, B ASE MATERIAL HARDNESS CAN RANCE UP TO RC24 IN THE HOT PORMED CONDITION.
MATERIAL THAT IS LEFT !N YOUR STOCK SHOULD BE ISOLATED AND IF YOU DESIRE YOUR MAY OBTAING AN ROA FROM OUR SALES DEPART >ENT FOR CREDIT AND SEND THE MATERIAL RACK TO US. On YOU MAY WANT TO PERFORM A CHEM CHECX PER PIEC USING A SUITABLE METHOD . COSTS WILL BE REIMBURSED PER USS STEEL LITIER.
PLEASE NOTIFY US OF YOUR DESIRED COURSE OF ACTTON.
$ MATERIAL THAT IS OUT TN THE FTELD SHOULD BE DEALT WITH THE SAME.
5 WE APOLOGIZE FOR THIS INCONVENIENCE.
{
0
, SIN LY, r 6 EACbY
~o 0 MO . OF Q.A.& STA'!1STICS cc: PAT DENAVIDES TFA VP A.ND GENERAL MAN *.OER I
l 1 !SO 9002 Certised j
i f
1 i
-- . . - - . . -.- . . . . - . . . .- . . ~ _ . .. . ,
JAN. 5.1999 12:53PM TFA N04348 P.3/10 -
e tube forgings QP A,me M,c A Ime, smoo n.w. rnowT . comrue.o. emseas era. t e g g997 RE: 4 STD LR 90 A234WPB Fittings Heat Codes G347 & G348 4 STD 45 A234WPB Fittings Heat Cedes G347 & 0348 4a3,4x2.5,4x2 STD LR 90 A234WP5 Fitdngs Pfear Codes G347 & G348 Company Addre.ss City, Stata, Zip Artention: Quality Assursace Manager / Branch Mmager Gentlemen:
Wa are writing to pass along important inforrcation from US Steel regarding a mixed bes:/grude simadan on a shipment of tubular products received by 'Ibbe Forgings of America. Pain ame to Ove lengthe et pipe.
ont of a snipment of 1,614 lengths, was of a different heat / grade material nis shipment was used to manufacmre the above referenced fl: rings.
Baset. tm our records, you have received sotas of these 6ttin$s, no enclosed information from U.S. Semel describes che frrugulertcy in their shipsnent, and the resul:ios non conformance in some of the fimags
=e =4. Pienne noes the reinedial course of action recommandad by U.S. Steel, and that U.S. Sealis l
asseaung full responsibility for all costs of recall, grade vari 5cacion, replaeaaw'at, or other wesasary rume-dies. Dwe Salvsty of USS/Kobe Steel is standing by to assist you; at 1-800 227-7113 (eneer 2776 after the prompe, or dial 1-440 277-2776).
--We have asked U.S. Steel for venfication that conecdve actions are being taken to e.r4 the this non-conformance will not occur again. These cotractive accons are outlined in their Icw as well..
e We pledge to work with yoc to rmnimus any inconvenience. I hope you will es11 Pat Benevices,95cs W Preside.at/ General Manager. John Peschey. Quality Assmance Manager, or myestf, should you have any quesdous or concerns about U.S. Steel's resolution of the problem. We have set up a toll-free reumber at 7hbe Forgings of America for your use,1-800 291-3Cc6 (eneer 124 after the protupt).
We regrec any inconvenience you may exponence. We fully expect that you can continue to rely on the I dedicadon to superior service and a quality product which have been a haffmark of our company since 1955.
Sincerely, s
t
.E Jay N. Zidell
-ef President b
E 1
- 4 J % 5.1998- 22:53pr1 Tra gm ,
U'. S. Steet - :
< .. sco arent sweet ,
. I- Pmseurgn. PA t$219 274s
- December 2,1997
.i To WhomIt May Concern:
Sabinet Mlaed Steel Heats B000$0 4 800056 3.laa x .270" wad Fittinas Pipe
Dear Sir:
During the routine tasdag of Stdags produced tom the subject heats at Tube Forgings of A +. lac, a suspected mixed semel was dewed. This suspicion was based ou '
=d=k=1 test results associated with a Stting that was tested. Chemical analysis of the suspect S ting further verlSai that the maserial used to ==*ture the fidos did not meet Tube Fongings of Amsrica's specifcation requir===en, nor did tbs resulting fiainhad Stdng meet all of the requirements of ASTM A234 WPB-96, Standard SpealScadon for Pipe Fittings of WrotJt Carbon Steel and Alloy Steel fer Moderate and High Temperature Service. Further tasting of the fluins, which was manufh hed kom l
' the Cr-Mo Alloy steel pipe pmdued by USS/Kobe Steel Company, showed test results which varied bom the speclEcazion m@au and wm unacceptable for ASTM A234 WPB-96.
ASTM A234 W/B-96 fittings produced hem these off-grade tangths ofpipe failsdto mest tha speciScation requiremsms in the following areas:
- 1. The alements Molybdanum (Mo) and Chromium (Cr) exceeded the d===at contents WA=d in ASTM A234-96a. Molybdanum and Chromima onuments
' of the referenced material are 0.19% and 0.76% respectively.
- 2. The Hardness values exoned the specifiestion limit of 197 BHN. Actual '
hardness values could be as high as 240 BHN.-
- 3. The Machanimal Propemes exceedthe requiremens of ASTM A234 WPB-96.
Elongation results also fh11 below the sninimum requirement of the specifloation.
Since you were a recipient of Sttings produced &o n the subject heat, you should prtunptly segregate the Rtungs idemiSed in Tube Forgings of America. Inc.'s ,
correspondence &cm your r=m*tata= inventory, and initis.e grade verEcation processes.
Whsre possible, you should recall and grade verify any r-aining Sttings or arrange fbr grade verincadon ofinstalled Sttings, If, as a recipient, you have sold or otherwise
{ .i
-- u. S. Steel Grouc
%,,,,,, /
A '. rut of USX Corporrtcr=
j
- , , , , , , , , - < - - ,,r, --
. .- -. . -- .-- = - _ . -- - - .
4 m . s.19ee- 22:54PM Tra gg ,
transferrtzi any fittings to your custorners, you should provide this notics to all transferees.
A!! racipien:s of these fittings will be reimbursed for reasonable oosta associated with locating, segregating. Stade verifying, and/or teptscing these questionable fittings.
All reciplants of these fittings abould clearly tedarstand that if you (thej) do not promptly comply with this notice, we will not be responsible for any assulting claima.
Corrective actions are being implemented at USS/Kobe Steel Company to preycot the recurrence of this situation. AR tubular products destined for TFA ftsting applications will be subjected to a grada verification east' prior to shipping.
< U. S. Steel Tubular Products and USS/Kobe sincerely zogret the inconvenience that this situation may cause. We do believe that the hoplemented corrective action shall, ., a a future recurrunce of & problem.
Any inquiries concaming & situadon should be directed to Dave Snively Tubular Products, at US3/Kobe Steel Company.
By phone, he can be reached by dialing 1 800 227-7113, and ti'an autering 2776 after the prompt; or by dialing 1 440-277-2776.
By email, ha enbe reached at topalovo@uaskoba.com By mall, ha can be reached at USS/Kobe Steel Company 1807 East 28* Street Lorain, Ohio 44055 Attention: Dave Sniwly Quality Assurance - Tubular Box,21A Very truly yows, Frank M11mls1d Manager,Metallegy & Quality Assurance '
' U. S. Steel Tubular Products . l
JAN. D.J998 ,12854PM TTA- gm p, g s *
- ar==, s.ie L - _ r -
M M A D E M 5a WW K Mw R 4032 H. Cuner CircleIsas. 4to P.O. Bos 1.7126 r
' m -
IN,TERTF*C
.50.t2891778 Fen: 28919)9 nioin.- andsm ame, w auib and NasweelMenness*
August 27,1997 Project EARX 97 0108 Raport 0547-2226 Mr. John Psechy Tube Forgings of America, Inc. ,
$200 Northwest Front Aven:a Portland, Oregon 97210
Dear Mr. Peachy:
Re: Chauncal and Mechanical Analysis perfberned on sesel fittings received on August 4,1997, pursuant to your Purchase Order Number P40149. '
Item: 4* STD, L/R 90* Elbows Heat Number G347, Cr-Mo Alloy
- 0956, ASTM A234 Orade WPB-96 Analysis (Units: % by weight)
!Il42 Car bo n (C) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.23 Manganese (Mn) ........................s,.... 1,27 l
Sillcon (El) ................................. 0.29 l
Nickel (NI) ............................... , 0.020 0,76 Chrornium (Cr) ...............................
Mol ybdenum (Mo) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.18 0,010 Co pp er (Cu) . . . . . . . . . . , , , , , , . . . . . . . . . . . . . . . . .
Va nad ium (V) , , . . . . . . . . . , , . . , . . . . , , . . . . . . . . . <0.005 Aluusiemnt (A1) ........................,...,,. 0.010 Phosphorous (P) ......................... ..... 0.010 suttur (s) ................................... 0.006 Columbium (Cb) .......,,,....,,..,,,,,....... < 0.005
. Carbon Equivalent (AWS DI.1) . . . . . . . . . . . . . . . . . . . . . 0.68 l+
i i;
~
JAN. 5.3999 12:55m TTA - NO.1Q p.7/g3
'1%e Forgiass of America,Inc.
.* Project EARX-97-0108 Report 05 067-2226 .
. !- August 27,1997 ,
Page 2 -
M.,hant,.I Analysis Yield Strength, 0.215 Other, psi - . . . . . . . . . . 103,700 91.800
'127,000 120,300 Tensus Strength, psi . . .. ...............
Elongadon in 2 lach, % . . . . i . . . . . . . . . . . 19.I 18.4 Reduction in Area, is . . . . . . . . . . . . . . . . . 53.7 45.0 Hardnans. 3HN,3,000 kg .............. 229 223 k
Charpy Isupact Tens Wald Hast Affected Zane,5 x 10mm e +20*F
. . . i ., . ....
'c . . . .
,,'/
, ,,i 'Jaapses5trungph,. - . ,' , l.at=4 , .: .
IkynnaloalImik l ' P%esent'#%sar
- Esat bmberi , .Tast.W'unber , .
., 3 . ft. b.' ' . . ) ,
6 15 to 0347 1 6 16 10 d 2 Average 7 15,5 <
10 20 28 30 0956 1 2 20 30 30 Average 20 29 30 Weldabluty Test ;
Raduced Section Tensile Strength Transverse to Wald Uldmate Tensu s Serength . . . . . . . . . . . . . . . '. . . . . . . 81,300 ps!
Location of Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . Wald Zone s
l
M . 5.1999 12355PM TF*A to. 2 4 P.8/m
.- Tube Forgings of Annarica, Inc.
Project EARX-974108 Repon 054s7-2226 .
Auses 27,1997 Pass 3 y
Gulded Band Tesu Root Bend ................................ Pansed Fat - Band ................................ Passed Hardness Survey, Rockwell G347 Base Meta! . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C23.0 G 347 HAZ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C34.5 W ald Zone . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B87.5 0956 H AZ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 581.0 0956 Base Metal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B56.0 Microstructure G934 Basa Metal Heavily banded (anisotropic)pearlita la a matrix of nne gralnad ferrite.
G984 HA2 at Fumian Une Ferrite delinenting prior austanits grala boundaries and large grain acicular ferrite mixed with flee pearlits.
G347 Base Masal Strue:ure consism of a misure of ferrita pearilts and raanensite.
G347 HAZ at Fusion Line Larger grain size consisting of ferrite. alloy carbides, banite and unnunpered martensite. *1111s structure la consistems with higher hardness valumn thund, c
S W.~5.1998 '22:55Prl TrA m,3 g p,p3g Tube Forgings of America, Inc.
Project EARX-97 010g
, .- Raport 05 og7 2226 ,
Aug at u,1991 Page 4 -
Waldabuky The finings were welded eastly using E6010 and E7018 electrodes with the SMAW process.
Visual and Magnetic Pardcle laspection after welding did not detecs any underbead or HAZ cracking. No peehaat was used. The welded fining was allowed to cool normally la ambient
' sit opedition aher 'weidlog. No dWouldas during welding wars observed.
Discussion .
Tests have shown tha Heat Number G341 (Cr-Mo alley) has a propensity fbr HAZ transformation to hard, brittle coasdtuents (untampered mansastre). 'ne result is a tandancy fbc -
" underbead (H AZ) cracking and high residual stress. .
The American Welding Society lists two (2) basic motbods fbr estiandag welding wh to avoid cold cracking.
- Hydrogen control e Heat affected zone hardness control Using tow hydrogen elecuade/ process with medium consusing the minimum preheat /laterpass '
, wyssuts tbr this maearial should be 2507
'De critical cooltag raza to contro! MAZ hartiness below Rockwell-C -36 is 41*F (5'C)/second.
These guldalines are based on a CE of 0.68 and Pcm of 0.36.
During welding o? the test fitting preheating, malatnamaca of incorpass tempensures and ooanol of coollas rata amts.agg perfbemed and although RAZ hardness is near the upper limit the critical hardness was not exceeded and cracking did not occur.
Itese tests have demonstrated that tfie Cr-Mo aUoy fittings can be successfully welded using procedure settable ibe welding A2.34, Grade WPB ftstings.
-no.sse p.se/20 ,
W . 5.199e 12sseen Tra .
l Tube Forgings of America, Inc. *
. l Project EARX47-0108 Report 05437 2226
' August 27,1997 Page 5 Jervices parcii.ad tbr this project have bass oceducted wkh hatlevd of cars sad sidit ordlearily exercised by members of es profession curraady praedcing in this area vede budget and time restraints. No warrancy, expressed or impiled, la made.
All work wu pedbemed la compliance with Brun Istenac Q.C. Mamal dated 02-23-94, Revision I and NDE Supplersees dated 06 0744, Revision 0.
We appreciera to oppormnhy to be of savios a you Should you Ewe any questions reg 6e coments of the report of h' we may be of futther asstsamco in any way, plause eoinact. us as (503) 975 4714 or (800) 78H9&$, e-mau pirishebrauncorp.com.
Sincarity, i
J p A
~
.M Taehafal Dtractcyr pl:sjg 4
36 sump *WetWmNesf4* dam)s. 7 i
OTHER NUCLEAR MATERIAL EVENT NUMBER: 33500 LICENSEE: DUBOSE 3ATIONAL ENERGY SERVICES,INC NOTIFICATION DATE 01/07/98 CITY: CLINTOhY REGION: 2 NOTIFICATION TIME: 10:00 [ET]
COUNTY: STATE: NC EVENT DATE: 01/07/98 LICENSE #: AGREEMENT: Y EVENT TIME: 10:00(EST)
DOCKET: LAST UPDATE DATE: 01/07/98 NOT!FICATIONS LAURIE PELTTSO, R1 RDO NRC NOTIFIED BY: JAMES N. DAILEY KEN BARR R2DO HQ OPS OFFICER: JOHN MacKINNON BLAIR SPITZBERG R4DO VERN HODGE NRR EMERGENC" CLASS: NOT APPLICABLE 10 CFR SECTION:
CDEG 21. 21(c) (3) (i) DEFECTS / NONCOMPLIANCE EVENT TEXT 10CFR PART 21 REPORT -
DUBOSE NATIONAL ENERGY SERVICES, INC, (DNES) SHIPPED A TOTAL OF 40 PIECES OF 4 INCH, 90 DEGREE ELBOWS WHICH DID NOT MEET ASME SEC II SA-234 REQUIREMENTS TO SEVERAL NUCLEAR POWER PLANTS.
TUBE FORGINGS OF AMERICA (TFA), A VENDOR OF DNES, NOTIFIED DNES THAT MATERIAL SUPPLIED TO TFA BY US STEEL /KOBE STEEL WAS MIXED AT THE MILL. FROM ONE TO FIVE LENG1HS OF PIPE, OUT OF A SHIPMENT OF 1,614 LENGTHS, WERE MADE OF A DIFFERENT HEAT / GRADE MATERIAL. THIS SHIPMENT WAS USED TO MANUFACTURE A TOTAL OF 40 PIECES OF 4 INCH, 90 DEGREE ELBOWS WHICH WERE SHIPPED TO THE FOLLOWING NUCLEAR POWER PIANTS:
CUSTOMER ORDER NUMBER QUANTITY WASHINGTON PUBLIC POWER 251756 20 PIECES NE NUCLEAR 02017957 16 PIECES TU ELECTRIC S02208826D2 3 PIECES SC ELECTRIC & GAS SR 700786 1 PIECE THE ABOVE CUSTOMERS WERE NOTIFIED OF THE PROBLEM.