05000387/LER-1982-002, Forwards LER 82-002/01T-1

From kanterella
Jump to navigation Jump to search
Forwards LER 82-002/01T-1
ML20070C453
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/01/1982
From: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20070C455 List:
References
PLA-1416, NUDOCS 8212140182
Download: ML20070C453 (1)


LER-2082-002, Forwards LER 82-002/01T-1
Event date:
Report date:
3872082002R00 - NRC Website

text

_. _ _ _ - - _

c J .s PPal. Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101 = 215 / 770L5151 December 1, 1982 s Mr. R.C. liaynes Director, Region I U.S. Nuclear Regulatory Commi-sion 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION LICENSEE EVENT REPORT 82-002/0lT-1 ER 100450 FILE 841-23 Docket No. 50-387 PLA- 1416 License No. NPF-14

Dear Mr. Haynes:

Attached please find a copy of Licensee Event Report No. 82-002/01T-1.

This event was determined to be reportable per Technical Specification 6.9.1.8.1, in that pipe clamps were insufficiently designed / installed, thus preventing support of axial loads.

H.W. Keiser Superintendent of Plant-Susquehanna DGM/cw cc: A. Schwencer <

Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 G. Rhoads Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 52 Shickshinny, PA 18655 8212140182 821201 PDR S

ADOCK 05000387 gh PDR

__ _ _ __ _ . . ___ _ _ _ _ _ - . .. __ _ - . _ _ _