Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18026A3941 September 1990Requests Waiver of Compliance from Tech Spec 3.8.1.1 to Evaluate Increase in Action from 72 H to 15 Days Re Ac Sources Based on 900829 Borescopic Insp of Emergency Diesel GeneratorPower change
ML17157A2748 August 1990Forwards Topical Rept PL-NF-90-001, Application of Reactor Analysis Methods for BWR Design & Analysis.
IR 05000387/19900803 August 1990Responds to Violations Noted in Insp Repts 50-387/90-80 & 50-388/90-80.Corrective Actions:Util Conducted Operator Training on How to Implement Eops If Suppression Chamber Pressure Not Available
ML18030A0743 August 1990Responds to Violations Noted in Insp Repts 50-387/90-80 & 50-388/90-80.Corrective Actions:Util Conducted Operator Training on How to Implement EOPs If Suppression Chamber Pressure Not Available
ML18026A2352 July 1990Forwards Application for Proposed Amend 132 to License NPF-14,revising Tech Spec to Support Cycle 6 ReloadShutdown Margin
Anticipated operational occurrence
Feedwater Controller Failure
Fuel cladding
ML18030A07219 June 1990Forwards Rev 1 to SEA-EE-183, Evaluation of Unit 1 Computer Class 1E - Non-Class 1E Interfaces & Rev 1 to SEA-EE-184, Evaluation of Unit 1 Annunciator Class 1E - Non-Class 1E Interfaces.
ML18026A3937 June 1990Requests NRC Approval to Install Mod at Plant Determined to Constitute Unreviewed Safety Question When Evaluated.Util Will Implement Administrative Controls to Ensure Larger Min Vol Met for Diesel E Prior to Tech Spec Change
ML18030A36714 May 1990Forwards Proprietary Conclusions of Investigation Re Two False Negative Analytical Results from Two Blind Spike Urine Samples.Investigation Satisfactorily Evaluated Samples. Encl Withheld (Ref 10CFR2.790)Fitness for Duty
ML20043A24611 May 1990Forwards Draft of Proposed Decommissioning Financial Assurance Plan,Per 10CFR50.33 & 50.75,for Review.Telcon Scheduled for 900515 to Discuss Comments
ML18030A07119 March 1990Responds to Questions Delineated in 900131 Ltr Re Diesel Generator Events That Occurred During Sept & Oct 1989.Draft Procedures for Proposed Intake Air Temp Test Program Transmitted to NRC on 900205.Revised Procedures Encl
ML18017A18715 February 1990Forwards Books 1 & 2 to, Unit 2 Third Refueling & Insp Outage;Outage Summary Rept.Hydrostatic
Anchor Darling
Squib
VT-2
Liquid penetrant
Dissimilar Metal Weld
IR 05000387/19890335 February 1990Responds to NRC 900105 Ltr Re Violations Noted in Insp Repts 50-387/89-33 & 50-388/89-31.Corrective Actions:Rhr Svc Water Pump 2P506B Remains in Inoperable Status Until Cause of Deviation Determined & Condition Corrected
ML18030A0705 February 1990Responds to NRC 900105 Ltr Re Violations Noted in Insp Repts 50-387/89-33 & 50-388/89-31.Corrective Actions:Rhr Svc Water Pump 2P506B Remains in Inoperable Status Until Cause of Deviation Determined & Condition Corrected
ML18040A9602 February 1990Forwards Schedules That Provide Details of Tasks Required to Complete Activities Re Diesel Generators & Advises of Plan to Have Spare Parts on Site in Timely Manner to Support Each Diesel Insp
ML20006B45025 January 1990Forwards Preliminary Scope & Schedule for Security Upgrade Project.Encl Withheld (Ref 10CFR73.21)
ML17156B60325 January 1990Forwards NPDES Discharge Monitoring Rept for Dec 1989 & State of Pa,Dept of Environ Resources Monthly Facility Rept Form (01-112).Noncompliances for Zinc on Cooling Tower Blowdown on 891228 & for Missed Sample Noted
ML18040B2675 January 1990Forwards Rev 0 to SEA-CW-037, Analysis of B & C 1989 Diesels Failure. Rept Details Util Analysis of Overpressurization Incidents Which Occurred in Sept & Oct 1989 of Diesel Generators
ML18040B26527 November 1989Forwards Response to Generic Ltr 89-21.Table of USIs for Which Technical Resolution Has Been Achieved EnclSafe Shutdown
Control of Heavy Loads
Backfit
ML19325F1999 November 1989Responds to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Util Has Developed & Issued Procedure Which Includes Safeguards Contingency Planning Using Approach Noted in Generic Ltr
ML19325D74119 October 1989Forwards Application for Amends 126 & 77 to Licenses NPF-14 & NPF-22,respectively,requesting Emergency Temporary Relief from Certain Requirements of Tech Specs 3.2.2 on One Time Basis for Period of 3 MonthsPressure boundary leak
ML19325C37711 October 1989Forwards Change DD to Physical Security Plan.Change Withheld (Ref 10CFR73.21)
ML18040B2582 October 1989Forwards Final Response to Request for Addl Info Re Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Listed Items Included in Previous & Current Ref Responses
ML18040A94412 September 1989Responds to Remaining Questions Raised During NRC Insp of Training Programs.Training Procedure Re Technical Exam Bank Instrumentation & Control Training Exams.Health Physics Technicians Trained Re High Radiation Levels
PLA-3251, Forwards Response to Regulatory Effectiveness Review Rept. Util Established Team to Evaluate Appropriate Scope for Planned Major Project to Upgrade Security.Scope of Project to Be Finalized & Approved in Nov 1989.Response Withheld31 August 1989Forwards Response to Regulatory Effectiveness Review Rept. Util Established Team to Evaluate Appropriate Scope for Planned Major Project to Upgrade Security.Scope of Project to Be Finalized & Approved in Nov 1989.Response Withheld
ML18040A94222 August 1989Requests Concurrence W/Scheduling of 1990 Annual NRC Observed Emergency Preparedness Exercise at Plant on 900502. Concurrence Requested by 890930
ML18040B25310 August 1989Discusses Insp of Operational Status of Emergency Preparedness Program.Susquehanna Review Committee 1987 & 1988 Emergency Plan Audits Encl W/Other Supporting DocumentationHealth Physics Network
Grace period
Siren
ML20246A01930 June 1989Submits Comments on Containment Performance Improvement Program (Cpi).Believes Program Will Be Generic Approach to Improving Containment Performance During Severe Accident
PLA-3218, Submits Info Re Settlement Agreements for Discrimination Matters Arising Under Energy Reorganization Act of 1974. No Settlements Made Between Licensee & Any Employees in Section 210 Proceedings27 June 1989Submits Info Re Settlement Agreements for Discrimination Matters Arising Under Energy Reorganization Act of 1974. No Settlements Made Between Licensee & Any Employees in Section 210 Proceedings
ML18040B25020 June 1989Forwards Summary Rept of Safety Evaluations Approved During 1988.Changes Include Backseating Control Box to Electrically Backset HV-202168 to Reduce Steam Leakage & Rerouting Condensate Supply Line to Main Condenser KeepfillSafe Shutdown
Reactor Vessel Water Level
Emergency Lighting
Process Control Program
Earthquake
PLA-3194, Forwards Change CC to Physical Security Plan.Change Withheld (Ref 10CFR73.21)30 May 1989Forwards Change CC to Physical Security Plan.Change Withheld (Ref 10CFR73.21)
ML18040A93028 April 1989Responds to 890322 Request for Addl Info Re Plant Fire Protection Review Rept.Analysis of Circuits Having Potential for Being Impacted by Fire Resulting in Multiple High Impedence Faults Will Be Completed by Last Quarter 1989Safe Shutdown
ML18040B24414 April 1989Forwards Application for Amends to Licenses NPF-14 & NPF-22, Resulting from Mods Performed to Essential Svc Water Sys,Per 10CFR50,App R,Consisting of Proposed Amends 23 & 70Safe Shutdown
PLA-3173, Forwards Change Bb to Physical Security Plan.Encl Withheld (Ref 10CFR73.21)22 March 1989Forwards Change Bb to Physical Security Plan.Encl Withheld (Ref 10CFR73.21)
ML18040A92710 March 1989Forwards Rev 6 to ISI-T-100.0 for Unit 1 & Rev 3 to ISI-T-200.0 for Unit 2 Pump & Valve Inservice Insp Testing Program.
ML18040A9267 March 1989Discusses Util Position Re Completion & Implementation of NRC Requested Actions Specified in Suppl 1 to NRC Bulletin 88-007, Power Oscillations in Bwrs.
ML17156B0132 February 1989Forwards Proprietary Rept & Affidavit Supporting Proposed Amend 119 to License NPF-14
ML17156A97715 December 1988Forwards Rev 11 to Susquehanna Units 1 & 2 Emergency Plan
ML18040B23322 November 1988Forwards Listed Addl Info Re Plant Fire Protection Review rept.W/16 Oversize DrawingsHot Short
Safe Shutdown
Fire Barrier
Emergency Lighting
Exemption Request
Fire Protection Program
ML17156A9219 November 1988Forwards Proprietary GE Rept, Tech Spec Improvement Analysis for Reactor Protection Sys for Susquehanna Steam Electric Station,Units 1 & 2. Rept Withheld (Ref 10CFR2.790)
ML18040A91115 September 1988Informs That Mods Re Fire Barrier Upgrades,Hvac Fan Switches,Ct Secondaries & Raceway Wrapping Completed Except as ListedFire Barrier
Fire Protection Program
ML18040A91010 August 1988Forwards Application for Amend to License NPF-14,extending Operation During Cycle 4 W/One Circulation Loop Out of Svc. Fee PaidAnticipated operational occurrence
ML18040B22210 August 1988Responds to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Staff Position on Matls, Water Chemistry,Crack Evaluation & Repair Criteria & Insp Schedules Among Topics Addressed.Flaw Evaluations Encl
ML18040B22027 July 1988Forwards Comments to Each Specific SALP Category,Per 880707 Meeting W/Nrc.Presentations from Meeting Also Encl
ML18040A90621 July 1988Forwards GE Rept, Susquehanna Unit 1 CRD Housing Cap Screw Corrosion. Rept Completes Action on Item
ML18040A90319 July 1988Forwards Approved Version of Topical Rept PL-NF-87-001-A, Qualification of Steady State Core Physics Methods for BWR Design & Analysis, Per 880428 Ltr
ML18040A90419 July 1988Forwards Rev 39 to Updated FSAR for Susquehanna Steam Electric Station Units 1 & 2 Per 10CFR50.71
ML18040B21324 June 1988Forwards 1987 Annual Rept for Allegheny Electric Cooperative,Inc
ML18040A90215 June 1988Provides Revised Response to NRC 871130 Ltr Re Violations Noted in Insp Repts 50-387/87-19 & 50-388/87-19.Corrective Actions:Incumbent Will Be Removed from Emergency Plan Position of Radiation Protection Coordinator
PLA-3028, Responds to Suppl 1 to Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Revs to Design Review for Original Bulletin Required as Result of Suppl31 May 1988Responds to Suppl 1 to Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Revs to Design Review for Original Bulletin Required as Result of Suppl
ML18040A8696 April 1988Forwards Application for Proposed Amends 110 & 61 to Licenses NPF-14 & NPF-22,respectively,revising Tech Specs Re Radiation Monitoring Instrumentation.Fee Paid