Forwards Schedules That Provide Details of Tasks Required to Complete Activities Re Diesel Generators & Advises of Plan to Have Spare Parts on Site in Timely Manner to Support Each Diesel Insp
ML18040A960
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/02/1990
From: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Butler W
Office of Nuclear Reactor Regulation
References
PLA-3341, NUDOCS 9002120325
Download: ML18040A960 (21)


Text

ACCELERATED DISIBUTION DEMONS~ION SYSTEM pi REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9002120325 DOC.DATE: 90/02/02 NOTARIZED: NO DOCKET g FACIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 05000387 50-388 Susquehanna Steam Electric Station, Unit, 2, Pennsylva 05000388 AUTH. NAME AUTHOR AFFILIATION KEISER,H.W. Pennsylvania Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION BUTLER,W.R. Project Directorate I-2

SUBJECT:

Forwards schedules that provide details of tasks required to complete each activity..

D DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution L ENCL L SIZE:

NOTES:LPDR 1 cy Transcripts. 05000387 /

LPDR 1 cy Transcripts. 05000388 A

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-2 LA 1 1 PD1-2 PD 1 1 THADANI,M 5 5 D INTERNAL: ACRS 6 6 NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 efEsPMB 1 0 OGC/HDS2 1 0 REG 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES 2 2

( 0 . P mg Qf(L<$

D A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 27

Pennsylvania Power & Light Company Two North Ninth Street ~ Allentown, PA 18101 ~ 215 I 770.5151 FEB 0 2 1990 Harold W. Keiser Senior V/ce President-Nuclear 21 5/770.4194 Director of Nuclear Reactor Regulation Attention: Dr. W. R. Butler, Project Director Project Directorate I-2 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION DIESEL GENERATORS SCHEDULE OF ACTIVITIES DOCKET 50-387 PLA-3341 FILE R41-2 50-388

Dear Dr. Butler:

This correspondence is a follow-up to a January 19, 1990 phone call between our respective staffs wherein PP&L committed to provide a schedule for completing activities related to the diesel generators, in particular, the 12 activities delineated in PLA-3221, which transmitted our diesel generator root cause analysis.

The attached schedules provide details of the tasks required to complete each activity. Attachment 1 to this PLA is a summary description of the major evolutions which will occur between now and October of 1990. Attachment 2 is an Executive Summary Schedule, and Attachment 3 contains the detailed schedules.

Two noteworthy points regarding the schedules. First, we plan to have spare parts on site in a timely manner to support each diesel inspection. This is based on availability and we are working aggressively with the supplier to ensure parts delivery. Should the availability of parts change we will provide you with an updated schedule. Secondly, based on the upcoming diesel inspections, additional corrective actions may be prudent on diesel generator E. We will schedule those activities on a case by case basis.

If you have any questions please contact D. J. Walters (215) 770-6536.

Very truly yours, H. W. Keiser Attachments

( 9002l20325 900202 PDR ADOCK 05000387 P PDC

File R41-2 PLA-3341 Dr. W. R. Butler oo: ~NRC Document Control Desk (original)J NRC Region I Mr. G. S. Barber, NRC Sr. Resident Inspector Mr. M. C. Thadani, NRC Project Manager

ATTACHMENT 1 TO PLA-3341 ACTIVITY SCHEDULED COMPLETION Ins ections and Refurbishments A-D Diesel Gen. A 03/30/90 Diesel Gen. C 05/05/90 0 Replace piston rings Diesel Gen. D 06/15/90 0 Inspect cylinder liners for tinning Diesel Gen. B 08/14/90 and correct as required 0 Inspect cylinder liners for porosity and correct as required 0 Blue check all piston to pin assemblies blue checking will be performed on the existing piston/piston pin assembly to determine percent bearing contact 0 Change lube oil 0 Change lube oil sample point the oil sample point on .each engine will be relocated at a point prior to the filter.

This will also allow sampling while the engine is running.

Evaluate Lower Oil Rin and End Ca Removal February, 15, 1990 0 We will evaluate the impact of removing the lower oil rings and end caps. If the consequences of this removal are acceptable a modification package will be issued.

Technical 8 ecification Revisions March 26, 1990 0 We have drafted proposed technical specification changes which we believe will result in increasing diesel generator reliability. We are targeting March 26 as our submittal date.

Reliabilit Monitorin Pro ram October 1, 1990 We have implemented a program'to trend engine parameters i.e. pressure and temperature. In addition we will be performing lube oil analysis on samples taken from the new sample location.

commencing a fter each diesel generator inspection/refurbishment outage. We are developing a trend program utilizing data from our engine analyzer.

This includes information such as firing pressures, pressure angles and horsepower.

These engine analyzer runs will be performed prior to and following each 18 month surveillance.

Distressed Piston Pin Examination April 1, 1990 0 As part of our continuing effort to determine root cause we are performing a metallurgical analysis of a distressed piston pin.

Review of Other Utilit Maintenance Practices June 1, 1990 o We will review other utilities diesel generator maintenance practices.-

Recommendations will be developed as a result of these visits and a schedule for implementation of accepted recommendations will be formulated..

Coo ers Owners Grou On Going This committee is in its early stages of formation and we are playing an integral role. This will be an ongoing to which we are committed. 'ctivity

ATTACHMENT 2 TO PIA 3341 sf i

~)

II g 4y)

e DIESEL OEAERATCR OVERV IEYI CEC JAN EES I'AR APR I"AY JLL AUG SER 15FEB90 450 EVAL LOWER OIL RING 8 PISTON PIN ENDCAP REMOVAL 10EC89 0 304 30SEP90 470 IMPLEMENT DIESEL RELIABILITY PROGRAM 26M AR90 455 S BMIT TECH SPEC CHANGE REOUEST 7JAN90 0"85 1APR90 460 FXAMINATION OF PISTON PIN 22JAN90 0-131

~~ 1JUN90 465 REVIEW OTHER UTIL MAINT II OPERATION PRACTICES 26FEB90 D"32 29MAR90 475 A D/G INSPECTION/REFURBISHMENT

~

I QAPRQD D-32 7MAYQO 480 'C 0/G INSPECTION/REFURBISHMENT 15MAYQO D-32 15JUN!!0 485 '0'/G INSPECTION/REFURBISHMENT 23JUNQO ~D-52 13AU59D 490 'B'/G INSPECTION/REFURBISHMENT DATA DATE

N

ATTACHMENT 3 TO PIA 3341

LB 0 I ESEL GENERATOR DETAILED SCHWA)U E DEC JAN FEB MAR APR MAY JUN JlL AUG SEP PA66 1, 177 hPE~VIOE OIL SAMPLE LINE

~

HOD 1DEC99 0 19 1BOECB9 160 MAINT-10 INITIAL SPARE PARTS REOUIREO I I 10EC89 0-85 E 890 170 MAINTWSTABLISH PLAN TO REFURBISH PARTS I

10EC89 0-8 Q 135 BDECBQ TEQ+DEF INE INSPE I

1DECBS )~2 180 hPE~SCLVE 220ECSS II RING ISSUES I

140 ~~ I LINER NSP CRITERIA ANO PROCEKlK 1OECBQ ~'~

85 I

TEAM~

I 21DECBQ SCHED TO INSPECT/REFURBISH ALL 0/G I

MA NT~TAIN SPECIAL EOUI~T 0

165 PROC~TAIN INITIAL SPARE PARTS 1 JAN90 I

0"54 I

III tl 23FE890 II If I I 1 JAN90 "54 23f EB90 250 MA INT-OBTAIN/ERECT BUILDING I II Ilail I 2FEB90 0- 23FEB90 1 8 hPE~VIOE DRAKE MJT HOD R I NEAP EVAL OIL REMOVAL 10EC89 0"77 179 ~VIDE OIL RING 15FEB90 3 EMX:AP REMOVAL MOO A'/G 26FI3390 25HAR90 INSPECT ION/R IQ+KNT 0%28 26 MAINT~ SLAVEILLANCE ON 'A'IESEL 26FE890 0 7 4MAR90 270 HAINTWISASSIM3LE 'A'IESEL 5HAR90 0~9 13MARQO 275 HAINT-INSPECT/PREP 'A'IESEL FOR REASSEM3LY I P 14HAR90 D-14 27MAR90 MAINT-,REASSEMBLE 'A'IESEL 29MARSO 0~2 29HAR90 Jg 390 MAINT-'A'IESEL START~ TESTING WP2Z~

310 MAI NT-REFURBISH PARTS I t SHARSO 4APR90 I

05 PROC"OBTAIN ACDITIONAL SPARE PARTS 30MAMO

)fl 0~7 5APR90 Ml285 HAINT~ FOR 'C'IESEL III 6APR90 3MAYQO

~o--e J 290 MAINT~ SURVEILLANCE ON 'C'IESEL 6APR90 0~7 12APRSO LO 295 HAINTMISASSEh%3LE 'O'IESEL 13APR90 0-9 21APR90 "C3 300 HAINT-INSPECT/PREP 'C'IESEL FOR REASSEMBLY I (0"14 22APRSO 5MAY90 315 HAINT~SS&SLE 'O'IESEL 0"

)

YQO 2 7HAYQO

'Il 395 MAINT-'C'IESEL START~ TESTING

'D'/G INSPECTION/R 13APRQO 13MAYQO

, EFURB I S+ENT ~91 340 PROC~AIN ADDITIONAL SPARE PARTS

~a-s 13MAYSO Ir'3APR90 M

345 MAINTMERRBISH PARTS APP,P.VUP R BHAYSO

)II 14MAY90 CAKE~

Q7 9 320 MAINTOP FOR 'D'IESEL g0"7 21MAY90 ALmAS;-CWI.bt OII

""III0 CQI'4 15MAY90 a330 HAINTWISASSEHBLE 'O'IESEL 15HAY90 11 JNIQO 3 HAINT~RF SURVEILLANCE ON 'D'IESEL 22HAYQO D"9 30MAY90 HAINT-INSPECT/PREP 'D'IESEL FOR RELY I 3 31MAY90 0~14 13JLNSO 350 MAINT-REASSEMBLE '0'IESEL DATA DATE

J

.I f

I 0

0

"" a'f j,", g fC) ~i rg g j $ tj$j'p l

J'

DIESEL GENERATCA DETAILED SCFEOULE FEB I4AR APR I4AY JUN JUL AUG SEP pA66 2.

'D'/G INSPECTION/R 14Jll1IQO D-2 15JUN90 EFLRB I &0+0@

00 MAINT-'D'IESEL START~ TESTING I NSPPCFI ON/R 22HAY90 21 JLNQO EFlRB I 9+ENT a 37 PROC OB TAIN ADDITIONAL SPARE PARTS 22MAYQO If 21 JINQO

~31 380 HA I NT-REFURBISH PARTS 16J(NQO

)If 0-7 22JUN90 HAINT-PREP FCR 'B'IESEL 23JWQO D" 12 4JULQO 365 MAINTMISASSEN3LE 'B'IESEL f

23JUN90 3ALG90 R

RRVEILLANCE ON 'O'IESEL 5JUL90 0 15 19JLLQO 3371 MAINT-INSPECT/PREP 'B'IESEL FOR REASSEMBLY 20J(l QO 1 1AUGQO "X2&3 385 HAINT~SSI>BLE 'B'IESEL 12AUG90 D"2 13AUG90

'0 405 HAINT-'B'IESEL START~ VESTING

~E A'i'Et.">')I'ilying,Ig~'.

(~'1 V/

DATA DATE 3

r t

0

)

p. I iP rgb, l\~sfi*

r~ ~~~>>.",,

as~! ) r

$ e

~

.~ ~c~

k

DIESEL GENERATCA DETAILED SCHULE DEC JAN FEEI I4AR APR I4AY JUN Ju AUG SEP 3

EXAMINATI ON PIN P STOW P N INATION IAPR!0 49S ~-ISSUE PISTON PIN REPORT MISCELL AhEOUS 10EC89 0 21 2iDEC89 60 FlKLSW/G FA I LURE ASSESSWENT 1DEC89 ~QNQA~IEW 115 21DEC89 NQA ALGITS OF COOPER 1DECB9 40 COOPI~ISTON 1R FROM MIT 8 INSP8NOPH OhFORMCE 1DEC89 2 210EC89 1 NOA~IEW SHOP INSPECTION REPORTS 1DEC89 2iDEC89 1 -WR I TE MECHANICAL REPORT t

10EC89 ~~.Q 21DEC89 NPE-WRITE 2S METALLLRGICAL REPORT tl 10EC89 60 COOPERWIhER iR F ROM UNIT 8 INSPIINO~ONFORMCE R 10EC89 120

- 1 Q

~210EC89 I EW BECHIEL ALOITS Of COOPER iBDEC89 45 COOPERWISTON RINGS RECODIFY)ATIONS 220EC89 l~

D~8 29DEC89

.'H 15 TEAM"REVIE W MECHANICAL REPORT 22DECBB D 8 290EC89 TEAM-REVIEW METALLlAGICALREPORT 4 2KEC!$

20 TEAM-ISRK 4SO'OOPER-

<O'ANBO

% I BJANBO ASTON,iSTEADY STATE ~L CROWTH ANALYS 65 COOPER -ASSESSMENT OF FIELD PROGRAM g iSFEBBO 70 COOPER-ISSUE F INAL REPCAT SY A,PERTURB CARO gasp Ayaitab16 OII gyerture Card DATA DATE

c f'I i~ 4,g C P p

"'b "~~

~ - 'h

~ '

I I

t E

t 1

DIESEL GENERATOR DETAILED SCHULE DEC JAN FEB MAR APA MAY JUN JUL AUG SEP /8~+ f REVISE TECH 2JAeO 0-14 ~ 15JAN90 185 TECH-W/LIC/OPS DEV DRAFT TECH SPEC CHANGES 16JAN90

~l 0" 14 I 29JAN90 195 TEAM~VIEW DRAFT PACKAGE II 30JAN90 26FEB90 1

1 0 L~C~ FINAL PACKAGE 8 PERF SAFETY IMPACT EVAL 7FEB90 D~7 5MARQO ka 200 LINEAR DEPT REVIEW 8 APPROVAL GHAR90 D "7 12HAR90 205 L[C-PORC REVIEW 8 APPROVAL 13HAR90 D-7 19MAR90

'C3 210 LIC-SRC REVIEW TO APPROVAL 7

20MARQO 0 7 26MARQO

+~

"C3 215 LIC-SUBMIT PACKAGE TO QK VIEW OTFER L MAINT 8 22JAN90 24FEB90 PRACT IEV IEW SUSQUEHANNA PROCEOLRE 0 "5 1HAR90 JQ 415 IIHS~ALVATE NON~OPER NXLEAR INSTALLATIONS D~2 3MARQO "II 500 NHS-EVALUATE IOWA KSV-12 INSTALLATION 4MAR90 p0-8 11MAR90 C3 420 NttS-EVALUATE COMMONWEALTH EDISON 12HAR90 0~6 17MAR90 JQ 425 NHS-EVALUATE ARIZGhlA PUBLIC SERVICE 26HAR90 0~4 29MAR90 430 hHS~ALUATE NEBRASKA PLBLIC POWER XHAMO 0 "5 3APR90 0530 ~ALUATE NIAGRA HOHAWK 4APR90 0-8 11APRQO JCI 435 hHS-TENTATIVE HOUSTON LSP/LOUISIANA PIXEL 12APRQO 0 "2 13APR90 18APROO 4 t+G~ALUATE AIR I! D 10 27APR90 FORCE KSV-16 INSTALLAT10N

% hNS-FINALIZE PHtP S SVBttlT EOR REVIEW 2MAYQO 21 MAY90 10 TEAH~IEW PMIP 22MAY90 0~11 1JUN90 515 NHS-INCORPORATE COt44ENTS AhG PV3LISK 10EC89 0-275 LI PROGRAM 75 MAINLYP MON OG WRITE HT 1SEP90 240 MAINT-ISSUE HT 2SEP90 30SEP90

~029 520 HAINT-It&LEHENTPERF MGN PROGRAM AISt>,,'!I)" >I<" tk)F!

i jll <(~]

DATA DATE

~ ~

Y gC.'

r

y. r~ rr i

' r r ~ ~

gi

DIESEL GENERATOR OVERVIEW DEC JAN FEB MAR APR MAY JUN JUL AUG SEP 1DEC89 D-77 15FEB90 450 EVAL LOWER OIL RING 8 PISTON PIN ENDCAP REMOVAL 1DEC89 D 304 30SEP90 470 IMPLEMENT DIESEL RELIABILITY PROGRAM 2JAN90 D-84 26MAR90 455 SUBMIT TECH SPEC CHANGE REQUEST 7JAN90 D-85 1APR90 460 EXAMINATION OF PISTON PIN 22 JAN90 26FEB90 D-131 D-32 ~ ~/G 475 ' '/G 29MAR90 1 JUN90 465 REVIEW OTHER UTIL MA I NT 8 OPERATION PAACT I CES

~

INSPECT I ON/REFURB I SHMENT 6APR90 D-32 7MAY90 480 INSPECTION/'REFURBISHMENT 15MAY90 D-32 485 ' '/G 15JUN90 I NSPECT I ON/REFURB I SHMENT 23JUN90 D-52 13AUG90 490 O'/G INSPECTION/REFURBISHMENT DATA DATE

<<I Si I