ML18030A407

From kanterella
Jump to navigation Jump to search
Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998
ML18030A407
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/06/1998
From: Byram R
PENNSYLVANIA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-387-97-03, 50-387-97-3, 50-388-97-03, 50-388-97-3, PLA-4827, NUDOCS 9801130413
Download: ML18030A407 (3)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9801130413 DOC.DATE: 98/01/06 NOTARIZED: NO DOCKET FACZL:50-387 Susquehanna Steam Electric Station, Unit '1, Pennsylva 05000387 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva 05000388 AUTH. NAME AUTHOR AFFILIATION BYRAM,R.G. Pennsylvania Power 6 Light Co.

RECIP.NAME 'ECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides updated response to violations noted in insp repts 50-387/97-03 & 50-388/97-03.Corrective actions:util currently scheduling issuance of all procedural revs by end of first quarter 1998.

DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR I ENCL TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response g SIZE: (k E

NOTES: 05000387 G RECIPIENT COPIES RECIPIENT 0

COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-2 PD NERSES,V INTERNAL: ACRS AEOD/SPD/RAB DEDRO FILE CE NRR/DRCH/HHFB RPM PECB NRR/DRPM/PERB NUDOCS-ABSTRACT OE DIR OGC/HDS2 RGN1 FILE 01 D

EXTERNAL: LZTCO BRYCE,J H NOAC NRC PDR NUDOCS FULLTEXT 0 I

NOTES:

U E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL

Robert G. Byram PP8L, Inc.

Senior Vice President Two North Ninth Street Generation and Chief Nuclear Oflicer Allentovm, PA 181 01-1179 Tel. 610.774.7502 Fax 610.774.501 9 Tel. 610.774.5151 Email: rgbyramepapl.corn http Jhwvw,papl.corn/

JAN 06 1998 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P 1-137 Washington, D.'C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION UPDATE - REPLY TO A NOTICE OF VIOLATION (50 387/97 03 01) 50 388/97 03 01) 50 387/97 03 02 AND 50-387/97-03-04, 50/3S8/97-03-04) Docket Nos. 50-387 PLA-4827 FILE R41-2 and 50-3SS

References:

1) PLA-4644, R G. Byram to USNRC, "Reply To a Notice of Violation, (50-387/97-03-01, 50-388/97-03-01; 50-387/97-03-02 AND 50-387/97-03-04, 50/388/97-03-04)" dated August 6, 1997.

This letter provides an updated response to Violation 3 contained in the NRC Integrated Inspection Report 50-387/97-03 and 50-388/97-03 dated June 23, 1997. The Violation 3 response identified that a review of department practices associated with 50.59 evaluations is ongoing and that appropriate procedural changes will be implemented by the fourth quarter of 1997. These reviews are complete and procedural revisions drafted. Additionally, PP&L committed in October 1997, to review and where appropriate, revise the PP&L 10CFR50.59 program so that it is consistent with the guidance of NEI 96-07 Revision 0 "Guidelines for 10CFR50.59 Safety Evaluations". As an active member of Nuclear Strategic Issues Advisory Committee (NSIAC), PP&L believes that consistency with NEI 96-07 is a key aspect of the continued safe and efficient operation of SSES.

In order to apply lessons learned and to include the guidance of NEI 96-07 in the PP&L 10CFR50.59 program, PP&L currently is scheduling issuance of all procedural revisions by the end of the first quarter 1998.

Ifyou have any questions, please contact Mr. M. H. Crowthers at (610) 774-7766.

Sincerely, (OI ram 9801%30413 '&0%06 05000387 PDR ADOCK ll!illllllllllllllllllllllllllllllllllil PDR 8

File R41-2 PLA4827 Document Control Desk copy: NRC Region I Mr. K. Jenison, NRC Sr. Resident Inspector Mr. V. Ners'es, NRC Sr. Project Manager