05000387/LER-1982-016, Reissued LER 82-016/01T-1:on 820920,mechanical Vacuum Pump Left in Svc After Ventilation Monitoring Sys Noble Gas Monitor Became Inoperable on 820918.Caused by Operator Not Noting All Parts of Applicable Action Statements

From kanterella
Jump to navigation Jump to search
Reissued LER 82-016/01T-1:on 820920,mechanical Vacuum Pump Left in Svc After Ventilation Monitoring Sys Noble Gas Monitor Became Inoperable on 820918.Caused by Operator Not Noting All Parts of Applicable Action Statements
ML20065M822
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 10/11/1982
From: Mitchell D
PENNSYLVANIA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20065M808 List:
References
LER-82-016-01T, LER-82-16-1T, NUDOCS 8210210436
Download: ML20065M822 (2)


LER-2082-016, Reissued LER 82-016/01T-1:on 820920,mechanical Vacuum Pump Left in Svc After Ventilation Monitoring Sys Noble Gas Monitor Became Inoperable on 820918.Caused by Operator Not Noting All Parts of Applicable Action Statements
Event date:
Report date:
3872082016R00 - NRC Website

text

-

e MRC POR M Soo y,g, Mugg Ag cry;ug,4yggy gg gggggg y y appgggy;w gy og2

" LICENSEE EVENT REPORT .Ep5N'4-s e-e n

)

CONTROL 8 LOCK: l l l l l l lQ (PLEASE PRINT oR TYPE ALL REQUIRED INPORMATION) l 1olillP l Al Sl Els l Il@l0l0l-l0l0IOlO!0l-l0lOl@l4f m.......O.. .. .. mo.... .... .. ..

illI1l1l@l l l@

u........ .. .,..? ..

CON'T lolt l

"!O"' luLl@l0 l 5 l OoO.x.rnum..R l O l 0l 3 l 8 l 7 l@l0 .. u

! 9.v.wrnaT.

l 2 l 0 l 8l n2l@l1 l 0R.l1 1.

11 l8 l 2,HI@

PORT O AT.

l EVEN'.* OESCRIPTION AND PROBABLE CONSEQUENCES h I o 12 I i While in Ooerational Condition 2 at anoroximately 2% cover. durine oower I jojallascention testing, the Turbine Bldg. Vent Monitor Sys. Noble Gas Monitor l jol4llbecame inoperable. When the monitor became inoperable, the Mechanical l l o l s l l Vacuum Pump (MVP) was left in service in variance to the applicable ACTION l l o l e l l statement. This event is reportable per 6.9.1.8.b. l loI7II I IoIa(l r . ..

l

=~ =: .=. ... .. ,.... .=. .=.

1o19]

l a d,. @ W.. @ U. @ 19 l u l M l vl'x l x l @ W @ M.. @

... .AR 10:,"!,' .' ** ' ":"" " ;,""' " " W.'* "

@ @,". I 81 21 l-l 10 l ll s I l/l 10 l l i L.t]

l-l

[L.

. .. . o o - o .. .. .

~ = = ::  ::=, ' =:" .R. ~ '::.=-

. .:=:,u'.R@

l o l n'l ol@  :==@

W@ l._.tl P:::=..IM l@ IA l@

l2 J@L.nJ G lz_J@ of n IN 10 l 11 01 u

n u n u n .. a .,

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h

, l 1 l 0 l lThe MVP was inadvertently left in service due to the operators not noting l l 1 l 1 l (,311 parts of the action statements pertaining to the L.C.O. Upon discoverv. I l i l 2 l lThe MVP una stonned nnd the Repnm . Tor Air F4peenre upra n1nced in c a rvi c a _ l jil3ll Operators were instructed to list all applicable action statements in the l l i l 4 l lL.C.O. log, to prevent recurrence of a similar event. l

, .. =

. TAT .  % pow.R OTH.R .T ATU. 01.COV.RY Ot.COV.RY D..CRIPTION l 1i s l l B l @ l Ol 0l 2 l@l NA l l Al@l- operator observation I

, .. i. .. .. . -

AMOUNT OF ACTIVITY LOC ATION OF R.L. A..

I116llZl@lZl@l NA l l NA l

ft M..R TYP. O . . C R IPTIO N I il 7 ..

I 1010 l 0 l@l zl@l.. .. i.

NA .

l M M..R . .C R I PT t O N l 1l c..l l010 l 0 l@l NA l

, is i. ..

=" *" ":.=.=- ""@

l I l 9 l (,.Z_jhl NA l

" 0210210436 E, "

011 -

.'.u . I"'o* '.'c'R ,T,0. h PDR ADOCK 05000387 S

NRC USE ONLY PDR j llllllllll l l 210..

l l N l@l NA

i. ..

_ __ ..a..e ce eO co s aeO _ D.. G. Mitchell._ _ _

_ oww._ 717-542-2181-524

. r LER 82-016/01T-0 Attachment The Turbine Building Ventilation Monitoring System Noble Gas Monitor was determined inoperable on 9-18-82. The applicable action statement was entered and appropriate samples were taken. However, the Mechanical Vacuum Pump was not taken out of operation. This was in violation of the action statement in effect and was therefore reportable per 6.9.1.8.b.

The MVP was placed in operation at 1650 on 9-17-82. Upon realization of the error on 9/20/82, actions were initiated to remove the MVP from service and the Steam Jet Air Ejectors were placed in service.

The MVP was inadvertently left in operation because the on shift operators did not make note of the sentence in the action statement prohibiting op-eration of the MVP. To prevent recurrence of an event of this nature, the shift personnel have been instructed to read all portions of the action statements and assure that L.C.O. log book is properly and accurately up-dated to reflect plant conditions. Further, the L.C.O. log will be reviewed shiftly to keep abreast of limiting conditions.

-- -- .- - . . - .