05000327/LER-1982-080, Forwards LER 82-080/01T-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-080/01T-0
ML20071K350
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 07/21/1982
From: Green H
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20071K354 List:
References
NUDOCS 8208020080
Download: ML20071K350 (1)


LER-2082-080, Forwards LER 82-080/01T-0
Event date:
Report date:
3272082080R00 - NRC Website

text

I e'

TENNESSEE VALLEY AUTHORITY CH ATTA NCOG A. TENN ESSEE 37401 1750 Chestnut Street Tower II N '

S ,  !

5 ~i

.- u y

July 21, 1982 ~3 o G4 N

N c:3 Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 1 - DOCKET No. 50-327 - FACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT SQRO-50-327/82080 The enclosed report provides details concerning the inoperability of various plant equipment because of a trip of the 1B1-B control and auxiliary vent board. This report is submitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.12.b.

Very truly yours, TENNESSEE VALLEY AUTHORITY t

H. J. Green b Director of Nuclear Power Enclosure cc (Enclosure):

Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Records Center Institute of Nuclear Power Operations 1820 Water Place Atlanta, Georgia 30339 NRC Inspector, Sequoyah OgLCOPM j!8"2888Po*!838g ,

~o-~~

fg m