ML22075A276

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revisions
ML22075A276
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/16/2022
From: Marshall T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML22075A276 (3)


Text

TENNESSEE 1\14 VALLEY AUTHORITY Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384 March 16, 2022 10 CFR 50.54(q) 10 CFR 72.44(f)

ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327, 50-328, and 72-034

Subject:

Emergency Plan Implementing Procedure Revisions In accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 72.44(f), the Tennessee Valley Authority is submitting a description of changes to the Sequoyah Nuclear Plant (SQN)

Radiological Emergency Plan. The affected documents are the SQN Emergency Plan Implementing Procedures (EPIPs) listed below.

EPIP Revision Title Effective Date( s) 2 40 Notification of Unusual Event February 21 , 2022 3 42 Alert February 21, 2022 4 44 Site Area Emergency February 21 , 2022 5 54 General Emergency February 21 , 2022 The above referenced revisions were evaluated in accordance with 10 CFR 50 .54(q)(3) and 10 CFR 72.44(f). It was determined that the changes do not reduce the effectiveness of the Emergency Plan. Details of the revisions are included in the enclosure.

There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact Mr. Paul Gain, Site Emergency Preparedness Manager, at (423) 843-7088.

Respectfully, Marshall, Thomas Dig ita lly sig ned by Marshall, Thomas B.

B. Date: 2022.03.16 12:26:35 -04'00' Thomas B. Marshall Site Vice President Sequoyah Nuclear Plant

U.S. Nuclear Regulatory Commission Page 2 March 16, 2022

Enclosure:

SON Units 1 & 2 Description of Revision/Change cc: NRC Regional Administrator - Region 11 NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Director - Division of Fuel Management, NMSS

ENCLOSURE: SQN UNITS 1 & 2 DESCRIPTION OF REVISION/CHANGE EPIP-2, Revision 40

  • Changed all Appendices to Attachments per the Procedure Writers Guide. This includes all references/cross references to Appendices. For pages where only the Appendix was changed to an Attachment there is no revision bar.
  • Added Steps to complete initial notification using Vaporstream with Attachment 1 being an alternate notification method.
  • Updated steps to include getting information from either completed Vaporstream or Attachment 1.
  • Added a new Attachment 10 "Vaporstream Guide. "

EPIP-3, Revision 42

  • Changed all Appendices to Attachments per the Procedure Writers Guide. This includes all references/cross references to Appendices. For pages where only the Appendix was changed to an Attachment there is no revision bar.
  • Added Steps to complete initial notification using Vaporstream with Attachment 1 being an alternate notification method. This includes steps in Attachment 7.
  • Updated steps to include getting information from either completed Vaporstream or Attachment 1.
  • Added a new Attachment 9 "Vaporstream Guide."

EPIP-4, Revision 44

  • Changed all Appendices to Attachments per the Procedure Writers Guide. This includes all references/cross references to Appendices. For pages where only the Appendix was changed to an Attachment there is no revision bar.
  • Added Steps to complete initial notification using Vaporstream with Attachment 1 being an alternate notification method . This includes steps in Attachment 7.
  • Updated steps to include getting information from either completed Vaporstream or Attachment 1.
  • Added a new Attachment 9 "Vaporstream Guide. "

EPIP-5, Revision 54

  • Changed all Appendices to Attachments per the Procedure Writers Guide. This includes all references/cross references to Appendices . For pages where only the Appendix was changed to an Attachment there is no revision bar.
  • Added Steps to body to complete initial notification using Vaporstream with Attachment 1 being an alternate notification method.
  • Added Steps to Attachment 7 to complete initial notification using Vaporstream.
  • Updated steps to include getting information from either completed Vaporstream or Attachment 1.
  • Added a new Attachment 11 "Vaporstream Guide."