MONTHYEARSVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999 Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action ML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted SVP-99-190, Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys1999-09-13013 September 1999 Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211F8251999-08-25025 August 1999 Forwards Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Insp Evaluated Effectiveness of Maint Rule Program & Review Periodic Evaluation Specifically Required for 10CFR50.65 ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211D1491999-08-19019 August 1999 Forwards Insp Repts 50-254/99-16 & 50-265/99-16 on 990719-22.Staff Identified Major Discrepancy Re Accuracy of Data Submitted to NRC for Protected Area Security Equipment Performance ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20210R7451999-08-13013 August 1999 Forwards Insp Repts 50-254/99-11 & 50-265/99-11 on 990601-0720.NRC Identified Several Issues Which Were Categorized as Being of Low Risk Significance.Two Issues Involved NCVs of Regulatory Requirements SVP-99-147, Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl1999-08-13013 August 1999 Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl SVP-99-170, Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety1999-08-13013 August 1999 Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML20210T9941999-08-13013 August 1999 Forwards Insp Repts 50-254/99-12 & 50-265/99-12 on 990628-0716.Violations Noted SVP-99-154, Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated1999-08-13013 August 1999 Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated ML20210R9541999-08-10010 August 1999 Informs That During 990804 Telcon Between J Bartlet & M Bielby,Arrangements Were Made for NRC to Insp License Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M5461999-08-0606 August 1999 Discusses 990804 Telcon Between J Bartlet & M Bielby,Where Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210L8371999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor-Operated Valves ML20210M4691999-07-30030 July 1999 Forwards Insp Repts 50-254/99-14 & 50-265/99-14 on 990713-15.One NCV Was Identified & Discussed in Encl Insp ML20210H4661999-07-29029 July 1999 Forwards Insp Repts 50-254/99-13 & 50-265/99-13 on 990628-0702.No Violations Noted.Insp Consisted of Selective Examination of Procedures & Representative Records, Observations of Activities & Interviews with Personnel 05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed1999-07-29029 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed SVP-99-151, Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 21999-07-23023 July 1999 Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-150, Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept1999-07-23023 July 1999 Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept SVP-99-146, Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 9906251999-07-21021 July 1999 Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 990625 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes SVP-99-139, Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage1999-06-30030 June 1999 Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 05000265/LER-1999-002, Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action1999-06-25025 June 1999 Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action SVP-99-122, Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 9906011999-06-25025 June 1999 Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 990601 SVP-99-066, Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested1999-06-25025 June 1999 Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested SVP-99-103, Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period1999-06-25025 June 1999 Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period ML20196F7921999-06-24024 June 1999 Forwards Meeting Summary,Nrc Meeting Handout & Licensee Handout from 990608 Meeting ML20196E7131999-06-23023 June 1999 Forwards Insp Repts 50-254/99-09 & 50-265/99-09 on 990421-0531.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20196E4821999-06-21021 June 1999 Discusses 990617 Meeting by Region III Senior Reactor Analysts (SRA) in Cordova,Il to Meet with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARSVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999 Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage SVP-99-190, Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys1999-09-13013 September 1999 Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) SVP-99-154, Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated1999-08-13013 August 1999 Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated SVP-99-170, Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety1999-08-13013 August 1999 Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety SVP-99-147, Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl1999-08-13013 August 1999 Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed 05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed1999-07-29029 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed SVP-99-150, Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept1999-07-23023 July 1999 Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept SVP-99-151, Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 21999-07-23023 July 1999 Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-146, Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 9906251999-07-21021 July 1999 Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 990625 ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes SVP-99-139, Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage1999-06-30030 June 1999 Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage SVP-99-103, Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period1999-06-25025 June 1999 Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period SVP-99-122, Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 9906011999-06-25025 June 1999 Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 990601 05000265/LER-1999-002, Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action1999-06-25025 June 1999 Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action SVP-99-066, Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested1999-06-25025 June 1999 Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested SVP-99-125, Forwards Technical Info Re ECCS Suction Strainers at Quad Cities Nuclear Power Station Units 1 & 2,to Support Review of 990129 Lar.Rev 0 to TR-VQ1500-02, Clean ECCS Suction Strainer Head Loss Test Rept, Encl1999-06-15015 June 1999 Forwards Technical Info Re ECCS Suction Strainers at Quad Cities Nuclear Power Station Units 1 & 2,to Support Review of 990129 Lar.Rev 0 to TR-VQ1500-02, Clean ECCS Suction Strainer Head Loss Test Rept, Encl ML20195E3491999-06-0707 June 1999 Withdraws Util Requesting License Change for Plant Security Plan Rev.Licensee Will re-evaluate Situation & May Request Approval of Change in Future ML20207G1451999-06-0707 June 1999 Forwards Rev 45 to Comed Quad Cities Nuclear Power Station Security Plan.Rev Includes Changes Listed.Security Plan Is Withheld from Public Disclosure Per 10CFR73.21 ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs SVP-99-105, Informs NRC of Rev to Schedule for Completing Setpoint/ Uncertainty Calculations & Procedure Changes,Originally Planned for Completion on 9905291999-05-20020 May 1999 Informs NRC of Rev to Schedule for Completing Setpoint/ Uncertainty Calculations & Procedure Changes,Originally Planned for Completion on 990529 ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB SVP-99-111, Informs NRC of Current Status of Actions on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-05-17017 May 1999 Informs NRC of Current Status of Actions on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions SVP-99-098, Fulfills Thirty Day & Annual Reporting Requirements of 10CFR50.46 for Plant.Eccs Evaluation Change Rept Transmitted in Entirety,Fulfilling Thirty Day & Annual Reporting Requirements Specified in 10CFR50.46(a)(3)(i)1999-05-17017 May 1999 Fulfills Thirty Day & Annual Reporting Requirements of 10CFR50.46 for Plant.Eccs Evaluation Change Rept Transmitted in Entirety,Fulfilling Thirty Day & Annual Reporting Requirements Specified in 10CFR50.46(a)(3)(i) SVP-99-099, Requests Relief from Requirements of 10CFR50.55a(g) Re Submittal of Relief Requests for Those Welds for Which Examinations of Greater than 90% of Weld Vol Was Not Acheived During 2nd ISI Program Interval1999-05-13013 May 1999 Requests Relief from Requirements of 10CFR50.55a(g) Re Submittal of Relief Requests for Those Welds for Which Examinations of Greater than 90% of Weld Vol Was Not Acheived During 2nd ISI Program Interval SVP-99-096, Provides Suppl Response to Violations Noted in Insp Repts 50-254/98-20 & 50-265/98-23.Corrective Actions:Listed Multidiscipline Team Will Perform self-assessment IAW Station Program for self-assessments in May 19991999-05-12012 May 1999 Provides Suppl Response to Violations Noted in Insp Repts 50-254/98-20 & 50-265/98-23.Corrective Actions:Listed Multidiscipline Team Will Perform self-assessment IAW Station Program for self-assessments in May 1999 05000254/LER-1999-001, Forwards LER 99-001-00 for Quad Cities Nuclear Power Station.Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tech Specs.Util Committing to Listed Actions1999-05-12012 May 1999 Forwards LER 99-001-00 for Quad Cities Nuclear Power Station.Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tech Specs.Util Committing to Listed Actions ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape SVP-99-108, Forwards Quad Cities 1998 Radiological Environ Operating Rept, IAW Plant TS 6.9.A.3.Rept Contains Results of Radiological Environ & Meteorological Monitoring Programs. Radioactive Effluent Release Rept Was Submitted 9903301999-04-30030 April 1999 Forwards Quad Cities 1998 Radiological Environ Operating Rept, IAW Plant TS 6.9.A.3.Rept Contains Results of Radiological Environ & Meteorological Monitoring Programs. Radioactive Effluent Release Rept Was Submitted 990330 SVP-99-036, Forwards Reg Guide 1.16 Rept Number of Personnel-Rem by Work & Job Function for 1998. Associated Collective Deep Dose Equivalent Reported According to Work & Job Functions1999-04-29029 April 1999 Forwards Reg Guide 1.16 Rept Number of Personnel-Rem by Work & Job Function for 1998. Associated Collective Deep Dose Equivalent Reported According to Work & Job Functions SVP-99-088, Informs That Util Is Withdrawing IST Relief Rquests RV-02B & RV-03B1999-04-29029 April 1999 Informs That Util Is Withdrawing IST Relief Rquests RV-02B & RV-03B ML20205T1141999-04-22022 April 1999 Provides Comments from Technical Review of Draft Info Notice Re Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station,Unit 2,ANO,Unit 2 & JAFNPP ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 SVP-99-065, Requests That License SOP-31516,for Jf Graham,Be Terminated, Per 10CFR50.74(b).Individual Was Removed from License Duty on 990319 & No Longer Requires Operator License1999-04-14014 April 1999 Requests That License SOP-31516,for Jf Graham,Be Terminated, Per 10CFR50.74(b).Individual Was Removed from License Duty on 990319 & No Longer Requires Operator License SVP-99-058, Submits Plant Specific ECCS Evaluation Changes,Per Annual Reporting Requirements of 10CFR50.46.Attachments Include Current Assessment Data Re PCT Info Limiting LOCA Evaluations1999-04-14014 April 1999 Submits Plant Specific ECCS Evaluation Changes,Per Annual Reporting Requirements of 10CFR50.46.Attachments Include Current Assessment Data Re PCT Info Limiting LOCA Evaluations SVP-99-063, Responds to NRC Re Violations Noted in Insp Repts 50-254/98-21 & 50-265/98-21.Corrective Actions:Revised Site ISI Procedure Qcap 0410-06, ISI Plan Implementation for Third Ten Year Insp Interval1999-04-0909 April 1999 Responds to NRC Re Violations Noted in Insp Repts 50-254/98-21 & 50-265/98-21.Corrective Actions:Revised Site ISI Procedure Qcap 0410-06, ISI Plan Implementation for Third Ten Year Insp Interval JAFP-99-0129, Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick1999-04-0909 April 1999 Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick SVP-99-057, Notifies of Change to Bases for TSs Section 3/4.5, ECCS, Re1999-04-0505 April 1999 Notifies of Change to Bases for TSs Section 3/4.5, ECCS, Re ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) SVP-99-062, Informs NRC of Rev to Schedule for Analytically Demonstrating That Cumulative Usage Factor for Reactor Vessel Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period1999-03-31031 March 1999 Informs NRC of Rev to Schedule for Analytically Demonstrating That Cumulative Usage Factor for Reactor Vessel Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period 1999-09-30
[Table view] |
Text
~
. Commonwealth litison Company Quad Citics Generating Station
, 22710 2G5th Asenue North Cordova, !!. 612429743 Tei .vm.s 02211 ESK-97-066 i
March 20,1997 j l
l United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk
Subject:
Quad Cities Station Units 1 & 2 I Response to NRC Resident inspection Report 50-254;265/96020 (DRP)
NRC Docket Iw 50-254/265
References:
(a) NRC Resident Inspection Report 50-254; 265/96020 (DRP) and l
Notice of Violation from J. L. Caldwell to E. Kraft, dated l February 20,1997. l Recent events have raised concern over the methodology used by the company in evaluating and trending Emergency Diesel Generator (EDG) performance.
All Comed nuclear generating stations use a corporate directive and local station procedures to provide the means of assessing, maintaining, and trending EDG and Station Blackout (SBO) DG system reliability. These documents are consistent with the guidelines given in Regulatory Guide 1.9, Regulatory Guide 1.155, NUMARC 87-00, and INPO 96-003. A computer based tracking program provides additional assistance in assessment as well as a means of trending system reliability performance.
The attached documents provide the history of the establishment of a reliability program for Comed DGs and clarification of the use of this program.
Ifyou have any questions concerning this letter, please contact Chuck Peterson, Regulatory Affairs Manager, at (309) 654-2241 extension 3609 Respe tfully
.i WW 6% ON
- 13. S. Krafl, Jr.
s Site Vice President 4,@ { , I Quad Cities Station #
9703270249 970320 PDR ADOCK 050002S4 G PDR- g ggg[g A Unicom Company
i ESK-97-066 Page 2 March 20,1997 _l l
- Attachment; (1) Comed Diesel Generator Reliability Program i (2) Comed Response to 10 CFR 50.63\
cc: A. B. Beach, NRC Regional Administrator RIII R. M. Pulsifer, NRC Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quad Cities D. C. Tubbs, MidAmerican Energy Company W. D. Leech, MidAmerican Energy Company i F. A. Spangenberg, Regulatory Affairs Manager, Dresden Perry Barnes, Regulatory Assurance Supervisor, LaSalle ,
Don Brindle, Regulatory Assurance Supervisor, Byron j Teriy Simpkin, Regulatory Assurance Supervisor, Braidwood
{
Denny Farrar, Regulatory Affairs Manager, Zion !
DCD - License (Both electronic and hard copy) {
ESK Letter File i
1 l
)
J
ATTACIIMENT 1 Comed Diesel Generator Reliability Program ESK-97-066 l Page 1 of 5 4
- 1. Diesel Generator Reliability Program Recent events (start failure of the 1/2 Emergency Diesel Generator (EDG) on January 17,1997) at Quad Cities Station have raised concern over the methodology used by the
- company in evaluating and trending EDG performance.
l A common process is used by all six Comed nuclear generating stations. NOD TS.20 is the corporate directive that describes the reliability pregram. This directive was written consistent with the guidelines given in Regulatory Guide (RG) 1.9, RG 1.155, and NUMARC 87-00. This directive is used as the basis for local station procedures and '
4 provides a means of assessing, maintaining, and trending DG system reliability.
Flowcharts in station procedures simplify the task of demand assessment. A computer
- based tracking program provides additional guidance in assessment as well as a means of trending system reliability performance. The information gathered under this program is submitted monthly to INPO.
Dresden and Quad Cities Stations' commitment is to conform to the five elements of RG 1,155, section 1.2, Reliability Program. Byron, Braidwood, and LaSalle Stations were originally committed to follow RG 1.108. As part of the reviews for implementation of the SBO Rule, their commitments were changed to RG 1.9 with exceptions as documented in Technical Specifications and UFSAR as applicable. Zion Station committed to RG 1.108 due to a confirmatory order. As part of tLcir Technical Specifications upgrade project, their commitment will change from RG 1.108 to RG 1.9.
Implementation of a reliability program was required for SBO Rule compliance for all I stations in order to maintain the individual station target reliabilities. Target reliabilities
- are 95% for all stations except LaSalle whose target is 97.5%.
With the implementation of the Maintenance Rule within Comed, an additional mechanism ecists to evaluate the overall DG system performance. This process provides an additional assessment of the failures and ensures a high reliability of the system. If the performance criteria are exceeded, methods are in place that will prompt the creation of
] a plan to return the system to an appropriate performance level.
i i
(
., ATTACHMENT 1 Comed Diesel Generator Reliability Program ESK-97-066 Page 2 of 5 II. Determination of Valid Successes and Failures The recent stan failure (January 17,1997) of the 1/2 EDG was evaluated by System Engineering to be an invalid start failure. The reasoning behind this is as follows.
- Additional supporting details are documented in the subsequent section.
- 1) The EDG was not in a standby mode (could not be relied on in an ;
emergency because it had not been declared operable) prior to the stan j attempt.
]
- 2) There is reasonable doubt that the cause of the failure would have :
defmitely resulted in a failure during another start attempt.
l
, 3) The EDG was successfully started and loaded approximately 15 minutes after the first start demand, without any corrective maintenance performed or significant troubleshooting (based on the exceptions list in RG 1.9).
All demands, valid and invalid, successes and failures, are entered into the reliability
- tracking database. The valid successes and failures are used to calculate the reliability percentage. The invalid demands are entered into the tracking database in order to maintain a record of all demands made on the DGs. A review, using the procedure flowchart (QCAP 0400-14, Attachment C) and the guidance provided in RG 1.9, of all '
valid and invalid failures since January 1,1992 was performed to determine if any were classified incorrectly. None of the invalid failures were reclassified as valid. One invalid failure was attributed to a component malfunction (exciter circuit breaker open pole I which was maintenance induced). The circuit breaker is required to operate during the l emergency mode. The evaluation was temporarily changed to a valid failure to ;
determine the affect on the DG reliability. The percent reliability was recalculated and l remained well above the required 95%.
The methodology used i , based on the direction provided in NOD TS.20. This is consistent with the reporting of reliability to INPO and the guidance found in RG 1.155
- and RG 1.9. The station procedure in use was written from the procedure used at Byron and Braidwood Stations to ensure that consistency would be maintained between the ;
stations. !
9 III. Detailed Determination for January 17,1997 Start Failure In RG 1.9, Section 2.1, Definitions, the definition of a start failure states:
" Any condition identified in the course of maintenance inspections (with the emergency diesel generator .a the standby mode) that would definitely have i
resulted in a start failure if a demand had occurred should be counted as a valid start demand and failure. (underline added)"
e
ATTACHMENT 1 Comed Diesel Generator Reliability Program ESK-97-066 Page 3 of 5 In the NRC inspection report, this dermition was quoted as being used inconsistently by Quad Cities Station in the application of RG 1.9 for evaluating failures. In the case of j the most recent failure, the EDG was not in a standby mode (could not be relied on in an ,
emergency because it had not been declared operable) prior to the start attempt. The I attempted start was intended to be the operability test for the failed governor shutdown solenoid that caused a failure of the engine to shutdown on January 14,1997. Although the start demand did fail, because of the nature of the failure there is reasonable doubt that this would have resulted in a failure during another start attempt. Several starts had been successfully performed during the previous months with no failures or problems I noted. The defective sub-component of the air aan motor was determined to be a non-wear induced manufacturing defect. Therefore, the air start motor had the potential of a start failure at any time during previous operation, but had no other identified failed starts attributed to it.
In Section 2, Diesel Generator Testing, the Exceptions ponion states: l
" Unsuccessful attempts to start or load-run should not be count :d as valid demands or failures when they can be definitely attributed to any of the following:
. .. Component malfbnctions or operating errors that did not prevent the l emergency diesel generator from being restarted and brought to load within
{
a few minutes (i.e., without corrective maintenance or significant problem 4 diagnosis). ;
- A failure to stan because a portion of the starting system was disabled for test purposes if followed by a successful start with the starting system in its normal alignment.
Each diesel generator ndid failure that results in the emergency diesel generator ,
being declared inoperable should be counted as one demand and one failure. 1 Exploratory tests dur:ng corrective maintenance or preventive maintenance should not be courad as demands or failures. However, the successful test that !
is performed to declare the emergency diesel generator operable should be counted as a demand. (underline added)"
Quad Cities System Engineering was not clear in discussions with the NRC Resident in i referencing the exception regarding the starting system. This exception did not apply in l this instance because there was adequate air pressure to stan the EDG in the test alignment (one bank of two air receivers isolated). However, as previously stated, the first exception listed above is applicable to this failure. The EDG was successfully started and loaded approximately 15 minutes afler the first start demand, without any corrective maintenance performed or significant troubleshooting. Because the first stan demand was not successful and the EDG remained inoperable, it should not be counted as valid. The start demand that was used to declare the EDG operable afler replacement of the air start motors was counted as a valid demand.
ATTACHMENT 1
- Comed Diesel Generator Reliability Program !
ESK-97-066 ,
] -
Page 4 of 5 !
l i l Using QCAP 0400-14, Attachment C, DG Demand Evaluation Logic Flowchart, the !
j' failure was evaluated as follows: l
- 1) The first decision block asks "Was demand troubleshooting or {
1 maintenance test?" This answer is NO. :
i 3 2) The next decision block on the flowchart asks "Did DG reach rated speed !
} and voltage within required time?" This answer is NO.
- 3) The flowchan then directs the user to go to page 4 of the attachment and perfbrm a type 1 evaluation.
- 4) Page 4 lists seven questions to be answered yes or no. These questions are based on the exceptions listed in RG 1.9 Section 2.1. For the specific ,
failure associated with the 1/2 EDG, only question 4 can be answered 4
YES. This question states," Component malfunctions or operating errors i
, that did NOT prevent the EDG's from being restaned and brought to 1 1 load within a few minutes (i.e., without corrective maintenance or l l significant problem diagnosis)."
- 5) Page 5 of the attachment documents the evaluation types and cases. For 4
the 1/2 EDG it is a type 1 case c, which is a YES to any question other than numbers 6 and 7. This is listed as an invalid failure.
Additionally, a review of the failure for hiaintenance Rule was performed. The failure q was identified as a Maintenance Rule Function Failure (MRFF), but not a Maintenance i Preventable Functional Failure (MPFF). The basis for this is as follows: {
" ..The EDG was in a maintenance condition however, had it been in service, it still may have failed. Even though the nature of the failure mechanism (manufacturer's defect combined with no existing dimensional tolerances or procedure for detection) was not readily detectable, it is believed that a more thorough inspection (i.e. hand rotation to check for binding) might have revealed the problem prior to the failure. Tolerances for this defect have never been addressed by the manufacturer. Evaluation for applicability to 10 CFR Part 21 is in progress. Based on 1) No manufacturer guidance, and 2) Intermittent failure mode, this failure is NOT a MPFF."
IV. Reliability Improvement Initiatives During the review of the failures since January 1,1992, the following trends were identified. Two valid failures (September and October 1995) on the Unit 2 EDG were attributed to intermittent binding of the air start motors and intermittent operation of the governor shutdown solenoid. The 1/2 EDG has had two failures (one valid -- March 18, e 1993, one invalid -- January 17,1997) associated with air start motor operation and one invalid failure (January 14,1997) to shutdown attributed to a binding governor shutdown solenoid.
i
, ATTACHMENT 1 Comed Diesel Generator Reliability Program i ESK-97-066 i Page 5 of 5
)
Actions taken to improve the reliability of the air start motors include verifymg proper i storage conditions and operation prior to installation.. Additionally, the method used to !
rebuild air start motors by Comed personnel is under review as pan of the root cause j investigation for PIF 97-0134. Upon the completion of this review, a process to send air i start motors to the EDG vendor for overhaul to ensure all critical sub-components are within proper tolerances may be established.
To improve the start reliability of the EDGs, a design to change the governor shutdown ;
solenoid from an " energize to run" to an " energize to shutdown" model is being l implemented (tracked by NTS 254-200-97-00402). This will not eliminate the potential i failure modes of the solenoid itself. However, failure of the solenoid to operate properly {
will only affect the ability to shutdown the engine instead of starting. A failure to !
shutdown the engine does not have the same magnitude safety concern as a failure to I stan.
V. Summary Recent events at Quad Cities Station have raised concern over the methodology used by 1 the company in evaluating and trending DG performance.
All Comed nuclear generating stations use a corporate directive and local station procedures to provide the means of assessing, maintaining, and trending EDG and Station Blackout (SBO) DG system reliability. These documents are consistent with the guidelines given in Regulatory Guide 1.9, Regulatory Guide 1.155, NUMARC 87-00, and INPO 96-003. A computer based tracking program prosides additional assistance in assessmert as well as a means of trending system reliability performance. Attachment 2 provides the details associated with the establishment of a reliability program for Comed i DGs.
ATTACIIMENT 2 Comed Response to 10 CFR 50.63 ESK-97-066 Page 1 of 4
- 1. Comed Response to 10 CFR 50.63 Recent events (start failure of the 1/2 Emergency Diesel Generator (EDG) on January 17,1997) at Quad Cities Station have raised concern over the methodology used by the company in evaluating and trending EDG performance.
Generic Letter (GL) 84-15 was issued to convey the NRC' reliability expectations for Emergency Diesel Generators (EDG) for plants that were licensed prior to 1978. Plants licensed in 1978 and later were required to follow Regulatory Guide (RG) 1.108.
Reference (a) stated that the EDG system reliability was acceptable at present levels and that current testing and maintenance practices would continue. The recommendation to reduce the numbei of cold fast starts of the EDG system was put into place by changing the Technical Specifications to remove the operability testing of the EDG for inoperable equipment. Procedures retained verification of EDG status for availability. No commitments were made to further change maintenance and surveillance practices, implement a reliability program, or to implement RG 1.108.
10 CFR 50.63 was approved in 1988 with reference (b) as the station's reply. This response outlined the proposed Station Blackout (SBO) duration, description of procedures to be implemented, and a list of pioposed modifications and installation schedule. It was stated in this response that the target EDG reliability would be established at 0.95 to correspond with the requirements of RG 1.155, Section 1.1, and NUhiARC 87-00, Section 3.2.4. No statement in the response addressed implementation of a program to ensure that the target reliability was maintained. l NUhiARC 87-00 was issued to provide guidance and methodologies in implementing NUhfARC's station blackout initiatives. This guidance was accepted by the NRC as reflected within NUMARC 87-00, Appendix K. Shortly after its issue, reference (y) was distributed to provide additionalinformation and clarification to NUMARC 87-00. This clarifying information was accepted by the NRC in a letter from A. C. Thadani (NRC) to A. M. Marion (NUMARC) January 1990. Reference (s) was issued subsequent to the l release of the original revision ofNUMARC 87-00. This supplement provided i clarification of definitions in Appendix D. There was no request for individual plant responses to NUMARC 87-00 or to any supplementary information transmittals thereafler.
Reference (c) was written to supply the supplemental informt son that was requested by NUMARC. This letter stated that the EDG reliability target vould be maintained, but no specific reliability program was identified.
A meeting between Comed and the NRC was held on March 28,1990. An alternative coping methodology was presented to the staff and preliminarily accepted. A revised response was requested by the NRC staff and submitted in reference (d). The revised response stated that the target EDG reliability would be maintained at 0.95.
Additionally, a diesel generator reliability program incorporating the five elements discussed in RG 1.155 would be established to ensure this target is maintained.
l ATTACIIMENT 2 ComEn Response to 10 CFR 50.63 l ESK-97-066 ;
Page 2 of 4 l l
i l
Reference (e) details the NRC's acceptance of Comed's response and proposed method i of dealing with a Station Blackout. several recommendations requiring additional ;
information were specified in the safety evaluation. Among them was the concern that i documentation of a formal reliability program meeting the guidance of RG 1.155, l Position 1.2, Items 2 through 5, should be implemented and maintained with the SBO submittals. I Reference (g) detr.ils a revised implementation schedule for compliance with the Station Blackout Rule. it further stated that the DG reliability program was currently in development ar d when issued, it would include the Alternate AC (AAC) DGs.
Reference (h) is a supplemental safety evaluation which evaluates Comed's responses to ' ;
the NRC's recommendations made in reference (e). The staff accepted Comed's response which stated that the DG reliability program will conform to RG 1.155, Position 1.2, items 2 through 5 and will be implemented by December 20,1991.
Reference (i) was corr. piled to address ventilation and condensate makeup concerns I listed in reference (h). It also proposed to the NRC, a revised schedule for the implementation of the DG reliability program (December 11,1992) and SBO procedure !
changes not associated with an equipment modification (August 31,1992).
Reference (j) contained additional information pertaining to the previously requested schedule revision in reference (i). Extensions were being requested due to the drafl rule revision to 10 CFR 50.63 and the second draft revision to RG 1.9. Inconsistencies in these drafts with previous revisions required additional time to evaluate their impact on j the development of the DG reliability program. The need for these additional j evaluations required the implementation date be extended to September 1,1993.
Reference (k) contains the one time schedular exemption requesting an additional six months to comply with 10 CFR 50.63. Additionally, this letter transmitted to the NRC the notification that a DG reliability program had been established and implemented at Dresden and Quad Cities Stations conforming to the five elements of RG 1.155, section 1.2. This program is documented in NOD TS.20 (reference (w)) and applies to the SBO l DGs and the EDGs.
Byron, Braidwood, and LaSalle Stations were originally committed to follow RG 1.108.
As part of the reviews for implementation of the SBO Rule, their commitments were changed to RG 1.9 with exceptions as documented in Technical Specifications and UFSAR as applicable. Zion Station committed to RG 1.108 due to a confirmatory order. As part of their Technical Specifications upgrade project, their commitment will change from RG 1.108 to RG 1.9. Implementation of a reliability program was required for compliance with the SBO Rule for all stations.
NOD TS.20 was written consistent with the guidelines given in RG 1.9, RG 1.155, and NUMARC 87-00. This directive was used as the basis for local station procedures (reference (x) for Quad Cities) and provides a means of assessing, maintaining, and trending DG system reliability. Flowchans in station procedures simplify the task of
ATTACHMENT 2 Comed Response to 10 CFR 50.63 ESK-97-066 Page 3 of 4 demand assessment. A computer based tracking program provides additional guidance in assessment as well as a means of trending system reliability performance. The i information gathered under this program is submitted monthly to INPO (under the guidelines in reference (u)). This process is used by all six Comed nuclear generating stations.
- 11. References (a) Response to Generic Letter 84-15, G. Alexander (Comed) to H. R. Denton l (NRC) dated October 12,1984.
(b) Response to Station Blackout Rule, M. H. Richter (Comed) letter to T. E.
Murley (NRC) dated April 17,1989.
(c) Supplemental response to Station Blackout Rule, M. H. Richter (Comed) letter to T. E. Murley (NRC) dated March 30,1990.
(d) Revised response to Station Blackout Rule, M. H. Richter (Comed) letter to T. E. Murley (NRC) dated May 18,1990.
(e) Safety Evaluations of the Response to the Station Blackout Rule related to Dresden, Units 2 & 3, and Quad Cities, Units 1 & 2, B. L. Siegel (NRC) to T. J. i Kovach (Comed) dated December 11,1990.
(f) Response to Station Blackout Safety Evaluations, M. H. Richter (Comed) to T. E. Murley (NRC), dated January 21,1991.
(g) Response to Station Blackout Safety Evaluations, M. H. Richter (Comed) to T. E. Murley (NRC), dated February 15,1991.
(h) Supplemental Safety Evaluations of the Response to the Station Blackout Rule related to Dresden, Units 2 & 3, and Quad Cities, Units 1 & 2, L. N. Olshan (NRC) to T. J. Kovach (Comed) dated July 18,1991.
(i) Response to Supplemental Station Blackout Safety Evaluations, M. H. Riciiter (Comed) to T. E. Murley (NRC), dated September 9,1991.
(j) Station Blackout, P. L. Piet (Comed) to T. E. Murley (NRC), dated November 24,1992.
(k) Proposed Schedular Exemption for Commitments Related to 10 CFR 50.63, Station Blackout (SBO) Rule, J. L. Schrage (Comed) to NRC, dated September 1,1995.
1 . .
e .
-ATTACHMENT 2 Comed Response to 10 CFR 50,63 i 7
ESK-97-066 .l 3 Pr;c 4 of 4 !
l i Ref'erences (cont'd) .
1 I (1) Notification of a Change to Schedule for Commitments Related to 10 CFR !
50.63, Station Blackout (SBO) Rule, B. Rybak (Comed) to NRC, dated i i November 30,1995.
l L
(m) Change to Implementation Commitment - Station Blackout Rule, R. M. Pulsifer !
, (NRC) to D. L. Farrar (Comed), dated December 18,1995. !
(n) Generic Letter 84-15, Proposed Staff Actions to Improve and Maintain Diesel l Generator Reliability, dated July 2,1984. l j (o) Regulatory Guide 1.108, Periodic Testing of Diesel Generator Units Used As l j Onsite Electric Power Systems at Nuclear Power Plants, Revision 1, August ,
i 1977. I
- _ (p) Regulatory Guide 1.155, Station Blackout, Revision 0. August 1988. ;
I (q) Regulatory Guide 1.9, Selection, Design, Qualification, and Testing of i Emergency Diesel Generator Units Used as Class IE Onsite Electric Power l
} Systems at Nuclear Power Plants, Revision 3, July 1993. ;
I NUMARC 87-00, Guidelines and Technical Basis for NUMARC Initiatives (r)
{ Addressing Station Blackout at Light Water Reactors, Revision 1 August 1991.
[ (s) Diesel Generator Reliability, W. IL Rasin (NUMARC ) to NUMARC Administrative Points Of Contact, dated . August 20,1990.
(t) 10 CFR 50.63, Loss Of All Alternating Current Power,1988.
- i. (u) World Association of Nuclear Operators (WANO) Performance Indicator
, Program Utility Data Coordinator Reference Notebook, INPO 96-003, j September 1996.
4-(v) Nuclear Operations Policy, NOP-TS.1, Emergency Diesel Generator Reliability
. Program, Revision 0, January 2,1993.
L (w) Nuclear Operations Directive, NOD-TS.20, Emergency Diesel Generator Reliability Program, Revision 0, January 2,1993.
(x) QCAP 0400-14, Emergency and Station Blackout Diesel Generator Reliability / Maintenance Effectiveness Monitoring Program, Revision 4, June 27, 1996.
(y) Station Blackout Implementation: Request for Supplemental SBO Submittal to NRC, NUMARC, January 4,1990.
- - -