ML19332E445

From kanterella
Jump to navigation Jump to search
Certifies That Initial & Requalification License Operator Training Programs at Plant Accredited & Based on Sys Approach to Training,Per Generic Ltr 87-07
ML19332E445
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/21/1989
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-87-07, GL-87-7, HL-839, NUDOCS 8912070237
Download: ML19332E445 (2)


Text

_-- ,

(

i ,

' Geova Pcwer Company-333 Ptooment Avenue  ;

  • = A%nta. Go&gia 30308 l

lotepnone004 fc6 3195 -

,, Maihng Admess '

40 Inenens Conter Pa*way Post Ofice iku 1295 thrrv,ymm. Alatiama 35201 .

. lete;txne P05 B68 5581 fv soa"m ew!% reJem

w. o. Heirston, sit i senior vice hmoent twe., operat>ons j L

HL-839 1 0420V I November 21, 1989 I

U.S. Nuclear Regulatory Commission  !

ATTN: Document Control Desk Hashington, D.C. 20555 j PLANT HATCH - UNITS 1, 2  ;

NRC DOCKETS 50-321, 50-366  ;

OPERATING LICENSES DPR-57, NPF-5  :

LICENSID OPERATOR TRAINING PROGRAMS l l

Gentlemen: i 10CFR55.31(a)(4) requires that in applying for an operator or senior operator license, "An authorized representative of the facility licensee shall certify . . . [the) details of the applicants qualifications, and -

details on courses of instruction administered by the facility licensee,  ;

t and describe the nature of the training received at the facility, and the startup and shutdown experience received." 10CFR55.59(c) provides the requirements for an operator requalification program. Both Part 55.31 i and Part 55.59 contain provisions for a facility licensee to certify that h operator' license applicants have completed an NRC approved program based +

on a system approach to training in lieu of the stated requirements.

On March 19, 1987, NRC issued Generic Letter 87-07 which provided the option to substitute accredited training programs for initial and requalification training programs previously approved by NRC. ,

In' accordance with this guidance, GPC hereby exercises this option and certifies that - the initial and requalification license training  ;

programs at Plant E. I. Hatch are accredited and based on a systems  ;

approach to training. Accreditation renewal was granted on September 21, 1989, by the National Nuclear Accrediting Board. As additional  ;

information, during the weeks of September 11 and 25, 1989, NRC requalification examinations were administered at Plant Hatch. The program was rated as satisfactory.

L 1

L8912070237 891121 0 DR ADOCK 0500 1 , ,

l

f; -:.cf '

lGeorgio Power k U.S. Nuclear Regulatory Commission November 21, 1989 Page Two Should you have any questions contact this office.

Sincerely,

.bh #

. G. Hairston, III SJB/eb c: Gepraia Power comoany Mr. H. C. Nix, General Manager - Nuclear Plant Mr. J. D. Heidt,-Manager Engineering and Licensing - Hatch GO-NORMS-U.S. Nuclear Regulatory Commission. Washington. D.C.

Mr. L. P. Crocker, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Commission. Region II Mr. S. D. Ebneter, Regional Administrator Mr. J. E. Henning, Senior Resident Inspector - Hatch i

o 0420V A.-